TLIS2028 — Install and replace transoms
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for TLIS2028 must cover
36 assessable components: 3 elements (14 performance criteria), 13 performance evidence and 9 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for work
- 1.1Worksite is identified
- 1.2Hazards are identified, risks are assessed and control measures are implemented
- 1.3Installation, replacement or repair method is selected to meet work requirements in accordance with workplace procedures
- 1.4Plant, equipment and other materials are prepared for work
- 1.5Transoms are prepared in accordance with job requirements using correct methods, including dressing and protective coatings
2 Install or replace transoms
- 2.1Unserviceable transoms are extracted, as required, using manual or mechanical methods in accordance with workplace procedures
- 2.2New transom is installed using manual or mechanical methods in accordance with workplace standards and procedures
- 2.3Transom is suitably supported by appropriate methods in accordance with workplace standards and procedures
- 2.4Transom fixtures are replaced or tightened as required
- 2.5Work is completed to meet track geometry requirements in accordance with rail industry standards and workplace procedures
- 2.6Work is checked for compliance with acceptance standards for spacing, skew and geometry
3 Complete documentation
- 3.1Required documentation procedures and processes are confirmed
- 3.2Documentation is filled in legibly and proofread
- 3.3Documentation is processed in accordance with workplace procedures
Performance evidence
- applying relevant workplace procedures
- identifying job hazards and taking required action to minimise, control or eliminate identified hazards
- identifying, selecting and using relevant tools and equipment
- implementing prepared contingency plans
- installing and replacing transoms on underbridges
- interpreting and following operational instructions and following scheduled work processes
- modifying activities depending on operational contingencies, risk situations and environments
- monitoring work activities in terms of planned schedule
- operating and adapting to differences in equipment in accordance with operating procedures
- preparing for work by selecting appropriate methods, materials and equipment for a variety of situations
- reading and interpreting relevant instructions, procedures, route information and signs
- reporting and/or rectifying identified problems, faults or malfunctions, in accordance with workplace procedures
- working systematically with required attention to detail without injury to self or others, or damage to goods or equipment
Knowledge evidence
- contents of relevant workplace technical manuals and instructions
- emergency management plan
- hazards that may exist when installing and replacing transoms, and ways of controlling the risks involved
- problems that may occur when installing and replacing transoms, and action that can be taken to report or resolve these problems
- track structure and geometry requirements
- transom condition and placement acceptance rail industry standards
- types of tools and equipment that may be used when installing and replacing railway transoms, and their applications
- work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations
- workplace procedures for installing and replacing transoms
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing TLIS2028
What does an assessment tool for TLIS2028 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLIS2028 needs to address all 36 unit components: 3 elements with 14 performance criteria, 13 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for TLIS2028?
Auditori pulls the current release of TLIS2028 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLIS2028 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing TLIS2028 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLIS2028, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- TLIS0001 — Construct and assemble points and crossings
- TLIS0002 — Install and maintain surface track drainage
- TLIS0003 — Install turnouts
- TLIS0004 — Measure and mark track for resurfacing
- TLIS2004 — Install and maintain rail bonding systems
- TLIS2012 — Install and service rail lubrication equipment
- TLIS2013 — Install minor structures
- TLIS2020 — Install overhead wiring structure
- TLIS2030 — Carry out track ballasting
- TLIS2031 — Install railway sleepers
- TLIS2033 — Install and repair temporary track supports
- TLIS2034 — Install and repair rail fastening systems
Your TLIS2028 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate TLIS2028 free