ICTCBL336 — Install and cut over metallic conductor cable to access network cabinet
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for ICTCBL336 must cover
51 assessable components: 5 elements (28 performance criteria), 8 performance evidence and 8 knowledge evidence requirements, plus 7 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare for installation
- 1.1Obtain project plan to scope work and gain approval from customer on key features of installation
- 1.2Arrange access to site according to required enterprise procedure
- 1.3Inspect site to develop work health and safety (WHS) plan and notify appropriate personnel of identified safety hazards
- 1.4Determine cable route and type of network cable equipment from project plan, considering the location of other services
- 1.5Obtain required plant, tools, safety equipment and materials for cabinet entry
- 1.6Coordinate with other parties to minimise disruption to services and down time
- 1.7Segregate incoming and outgoing cables to facilitate access and avoid overlaying and backtracking of cable
- 1.8Notify stakeholders of proposed cut over details and proposed disruption to services
- 1.9Undertake additional preparatory non-jointing work, as required, according to customer practices and site conditions
2 Install required cable and termination modules
- 2.1Evaluate existing termination module type and capacity
- 2.2Install additional termination modules, as required, and modify existing housing capacity according to manufacturer specifications and industry practice
- 2.3Determine cable route between parent jointing chamber and cable termination blocks according to customer practices, site limitations, equipment specifications and regulations
- 2.4Select entry port and sealing arrangements
- 2.5Install cable to cabinet
- 2.6Arrange and distribute cable fan out and routing according to industry practice
- 2.7Label cabinets, cables and joints according to industry standards
3 Joint, jumper and cut over cable
- 3.1Joint cable according to jointing standards, materials, joint type, location, customer practices and manufacturer guidelines
- 3.2Install jumpers and cut away tails according to industry practice and to minimise service outages
- 3.3Test cable for performance and rectify faults relating to cut over according to location, materials available and industry practice
- 3.4Seal all joints and cabinet according to cable type, location, customer practices and manufacturer guidelines
4 Perform tests
- 4.1Visually check that all connections and interconnections are firm and sound
- 4.2Electrically test all terminations for continuity according to customer practices
- 4.3Reseal and pressurise cables
5 Complete site restoration and project documentation
- 5.1Supply test results to customer for future reference
- 5.2Complete cut over report and design amendments report that shows final cable layout as part of as-built documentation
- 5.3Recover obsolete materials and return to appropriate point for disposal
- 5.4Restore site according to customer practices or approving authority requirements
- 5.5Notify appropriate personnel about completion of cut over and obtain sign-off
Performance evidence
- interpret project plan to determine cable route, required plant, tools, safety equipment and materials
- communicate with other stakeholders to arrange site access and to confirm safety requirements
- prepare cabinet and cable for cable entry according to customer practices
- install cable, label and fan out for termination
- terminate pairs to termination modules following customer practices
- run jumpers and cut over services with minimum outages
- complete required documentation related to cut over
- follow and comply with WHS and environmental requirements
Knowledge evidence
- cabling types, connectors and cabling structures
- legislation, regulations, codes, standards and other formal agreements that impact on the work activity, in particular:
- health, safety and environmental requirements relating to the activity and site conditions
- manufacturer requirements for the operation of jointing equipment
- process for the cut over of a cabinet entry cable
- features and operating conditions of test equipment and how the equipment is used to measure cable performance
- typical worksite issues and challenges that may cause delays in project construction activities, and how these could be addressed
- purpose of warranties and service level agreements (SLAs).
Foundation skills
- Reading: Interprets plans, specifications and other documentation from various sources Consolidates information to determine requirements
- Writing: Documents outcomes and changes to plans using industry relevant terminology and recognised plan symbols Prepares documentation and correspondence using clear language and correct spelling
- Oral Communication: Interacts effectively in verbal exchanges using appropriate language, listening and questioning skills to convey and clarify information
- Numeracy: Makes calculations required for measuring and estimating materials for construction Performs mathematical calculations to check, interpret and confirm results of system tests
- Navigate the world of work: Complies with policies, procedures and legislative requirements relevant to own role
- Interact with others: Uses appropriate practices and protocols to communicate effectively with co-workers, customers and others
- Get the work done: Plans, sequences and carries out tasks according to meet required outcomes Analyses task requirements to select appropriate equipment and practices Uses problem solving processes and standard procedures to determine solutions to less predictable problems
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing ICTCBL336
What does an assessment tool for ICTCBL336 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for ICTCBL336 needs to address all 51 unit components: 5 elements with 28 performance criteria, 8 performance evidence requirements, 8 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for ICTCBL336?
Auditori pulls the current release of ICTCBL336 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for ICTCBL336 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing ICTCBL336 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of ICTCBL336, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- ICTCBL205 — Joint metallic conductor cable on customer premises
- ICTCBL206 — Alter services to existing cable system
- ICTCBL210 — Install a telecommunications service to a building
- ICTCBL211 — Install an above ground equipment enclosure
- ICTCBL212 — Erect aerial cable supports
- ICTCBL219 — Apply safe technical work practices for cabling registration when configuring an ADSL circuit
- ICTCBL238 — Install, maintain and modify customer premises communications cabling: ACMA Lift Rule
- ICTCBL239 — Install customer cable support systems
- ICTCBL240 — Place and secure customer cable
- ICTCBL241 — Terminate metallic conductor customer cable
- ICTCBL242 — Install functional and protective telecommunications earthing system
- ICTCBL246 — Install, maintain and modify customer premises communications cabling: ACMA Restricted Rule
Your ICTCBL336 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate ICTCBL336 free