ICTCBL238Install, maintain and modify customer premises communications cabling: ACMA Lift Rule

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for ICTCBL238 must cover

69 assessable components: 10 elements (44 performance criteria), 6 performance evidence and 12 knowledge evidence requirements, plus 7 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Work within constraints imposed by customer premises and ACMA regulatory environment

  • 1.1Prepare for lift cabling work according to regulatory environment, cabling environment, cable type, cable identification, termination systems, earthing and protection, records and relevant legislation, codes, regulations and standards
  • 1.2Identify building infrastructure that places critical constraints on cabling when undertaking typical lift cabling installation from local distributor (LD) to lift car socket
  • 1.3Develop strategies to manage other infrastructure in relation to cabling
  • 1.4Notify appropriate personnel of identified safety hazards at cabling worksite

2 Manage remote power feed

  • 2.1Identify and avoid risks posed by contact with remote power feeding services when performing cabling activity
  • 2.2Make site safe by identifying remote power feeding services that operate at above telecommunications network voltage (TNV) inside customer premises

3 Install and modify cable support, earthing and termination infrastructure

  • 3.1Install fixings and cable support structures of adequate strength safely and align with environment according to manufacturer’s and customer’s specifications
  • 3.2Secure catenary supports to building structure and tension where necessary to ensure cable weight can be carried in operating conditions with interference and safety segregation maintained, including adherence to current Australian Standards
  • 3.3Install protective earthing of metal work to industry standards where required
  • 3.4Inspect installed support structure to ensure cable will not be exposed to damage during installation and general operation
  • 3.5Position terminating equipment and fixing to accepted industry codes of practice, current Australian Standards and customer requirements
  • 3.6Inspect control cubicles, travelling cable supports, junction boxes, line isolator units, backmount and outlet layout, to ensure compliance with manufacturer’s specifications, allow adequate work space for ease of access and avoid overlaying
  • 3.7Segregate incoming and outgoing cables to ensure ease of access, and avoid overlaying

4 Install cables and earth wires

  • 4.1Install lift communications cable from LD to lift car socket
  • 4.2Install cables according to manufacturer’s application specifications, including tension and bending stress requirements
  • 4.3Identify and avoid sources of possible damage to cable, including hot pipes, sharp edges, cable burn, kinks and stretching
  • 4.4Allow sufficient excess at cable ends to facilitate termination
  • 4.5Place and secure cable to maintain safety and interference segregation according to legislative and industry standards
  • 4.6Install cable fasteners with correct tension to prevent cable sheath damage or transmission impairment, and trim flush to prevent risk of personal damage
  • 4.7Install aerial cables supported by catenaries in external environment to meet minimum above ground clearances and clearances from hazardous electrical services according to current Australian Standards
  • 4.8Install and secure travelling cables to maintain safety and according to relevant legislative, industry and manufacturer’s standards
  • 4.9Install local isolation units (LIU) as required according to current Australian Standards
  • 4.10Install over-voltage protection devices to all cable pairs, where required, to suppress voltage surges, with devices protectively earthed and according to current Australian Standards
  • 4.11Protect earth wire insulation against damage with protective earths segregated according to relevant industry and legislative standards

5 Terminate and test cables and earth wires

  • 5.1Remove cable sheath to allow for correct termination length and without damage to underlying conductors and their insulation
  • 5.2Install terminating modules according to manufacturer’s specifications, ensuring cable pairs are neatly and sequentially fanned for termination
  • 5.3Terminate conductors according to recommended colour code sequence using appropriate termination tools in manufacturer’s specified manner
  • 5.4Earth cable shield, if applicable, to manufacturer’s specifications and relevant industry codes of practice, including current Australian Standards
  • 5.5Undertake visual inspection to confirm termination colour code sequence has been followed, prior to end to end testing of wire and pair termination integrity
  • 5.6Terminate earth wires with connectors recommended by manufacturer according to relevant industry codes of practice, including current Australian Standards
  • 5.7Maintain earth wire continuity throughout to meet interface requirements with electrical systems
  • 5.8Test earthing installation for continuity, insulation resistance and conductive resistance according to relevant industry standards, including current Australian Standards
  • 5.9Confirm compatibility of alterations with existing systems and test new work both in isolation and when integrated with existing systems

6 Inspect cable route to ensure correct separations

  • 6.1Inspect separations along entire cable route and rectify separations that do not comply with regulations
  • 6.2Install barriers to achieve separations where sufficient spatial separation cannot be met

7 Evaluate earthing needs for cable systems on customer premises

  • 7.1Locate existing customer earthing systems and analyse earthing needs of cable systems
  • 7.2Calculate upper and lower limits of resistance for variety of cable system earths using relevant cable characteristics

8 Label earthing systems

  • 8.1Identify label requirements for all types of earthing systems
  • 8.2Attach label to earthing systems according to industry regulations

9 Create or update cable plans and records

  • 9.1Document installation details on record sheets and plans, and store according to customer requirements
  • 9.2Label cable pairs clearly to provide accurate identification according to manufacturer’s, industry and customer standards
  • 9.3Record cabling details in cable pair record books to provide accurate record according to industry codes of practice and current Australian Standards
  • 9.4Complete Telecommunications Cabling Advice (TCA) form

10 Monitor work activity

  • 10.1Maintain close supervision of cablers not holding appropriate registration for task to ensure installation and maintenance activity is strictly according to legislative requirements and industry standards for safety and network integrity, including all current Australian Standards

Performance evidence

  • install a lift cabling system from local distributor (LD) via a travelling cable to a lift car socket, including accurate completion of installation records, drawing alterations and compliance forms
  • read and interpret cable drawings and plans for locations and terminations
  • apply cable conductor identification codes
  • conduct and interpret cable test results
  • interpret and apply related regulations and industry codes
  • comply with all related work health and safety (WHS) requirements and work practices.

Knowledge evidence

  • Australian Communications and Media Authority (ACMA) competency requirements for Telecommunications Cabling Provider Rules
  • the features and operating requirements of test equipment
  • the information required to operate equipment according to a test specification
  • legislation, codes of practice and other formal agreements that impact on the work activity
  • manufacturer’s requirements for safe operation of equipment
  • explain protection earthing
  • the features of lift construction and the types of cables required
  • the types of cable used for manual controlled fire services
  • cables and the types of cabling
  • common distributors
  • specific WHS requirements relating to the activity and site conditions
  • typical issues and challenges that occur on site.

Foundation skills

  • Reading: Interprets complex technical information, legislation, codes, regulations and standards to identify key requirements
  • Writing: Completes required documentation to meet customer, organisational and legislative requirements using industry relevant terminology
  • Oral communication: Delivers clear and specific instructions and confirms understanding using questioning and active listening
  • Numeracy: Takes measurements and interprets results
  • Navigate the world of work: Takes responsibility for adherence to legal, regulatory and organisational requirements relevant to own work context, including supervising the work of others
  • Interact with others: Identifies and follows accepted communication practices and protocols when liaising with customers, internal and external personnel on technical and operational matters
  • Get the work done: Determines job sequence and works logically and systematically to undertake clearly defined tasks - Analyses task requirements to decide on appropriate equipment and practices - Implements actions as per plan, making adjustments if necessary, and addressing some unexpected issues - Automatically implements standard procedures for routine decisions in response to familiar problems

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing ICTCBL238

What does an assessment tool for ICTCBL238 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for ICTCBL238 needs to address all 69 unit components: 10 elements with 44 performance criteria, 6 performance evidence requirements, 12 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for ICTCBL238?

Auditori pulls the current release of ICTCBL238 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for ICTCBL238 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing ICTCBL238 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of ICTCBL238, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your ICTCBL238 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate ICTCBL238 free