UETDRDU016 — Lay power cables
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UETDRDU016 must cover
68 assessable components: 3 elements (26 performance criteria), 16 performance evidence and 26 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to lay power cable
- 1.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
- 1.2Work plan is obtained and confirmed in accordance with workplace requirements
- 1.3Materials required for work are determined and obtained in accordance with work plan and workplace requirements
- 1.4Plant, tools, equipment, and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.5Communication method for the laying is confirmed with other workers
- 1.6Hazards are identified, risks assessed and control measures identified and applied
- 1.7Cable route is confirmed, excavated and bedded in accordance with the work plan and workplace requirements
- 1.8Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
- 1.9Worksite is prepared in accordance with the work plan and workplace requirements
- 1.10Traffic management plan is confirmed as being in place in accordance with workplace requirements
2 Carry out laying of power cable
- 2.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2Lifting, working in confined spaces, the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
- 2.3Hazard control measures are monitored in accordance with workplace requirements
- 2.4Cable laying plant and equipment is positioned in accordance with the work plan and workplace requirements
- 2.5Conduit and cable are laid, cable is bedded and protected in accordance with the work plan and workplace requirements
- 2.6Communication with other workers is maintained during the laying of cables in accordance with the work plan and workplace requirements
- 2.7Cable ends are sealed in accordance with the work plan and workplace requirements
- 2.8Backfilling is confirmed in accordance with the work plan and workplace requirements
- 2.9Incidents or unplanned events are responded to in accordance with workplace requirements
- 2.10Quality checks of work are undertaken in accordance with work plan and workplace requirements
3 Complete work and documentation
- 3.1Completed work is checked for compliance against the work plan and workplace requirements
- 3.2Incidents or unplanned events are reported in accordance with workplace requirements
- 3.3Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
- 3.4Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
- 3.5Surplus materials are returned to storage or disposed of in accordance with workplace requirements
- 3.6Personnel are notified of work completion in accordance with workplace requirements
Performance evidence
- applying relevant legislation, regulations, standards, codes of practice and organisational workplace requirements, including:
- work health and safety (WHS)/occupational health and safety (OHS)
- using liquefied petroleum gas (LPG)
- excavation/trench safety
- identifying hazards, assessing risks, identifying, applying and monitoring control measures
- interpreting and using drawings, diagrams and instructions
- obtaining, inspecting and using relevant personal protective equipment (PPE)
- laying of cables, including:
- high voltage (HV) polymeric
- low voltage (LV) polymeric
- laying and sealing conduits
- positioning cable laying plant and equipment
- s ealing cable ends
- bedding and protecting cables
- backfilling open trench in accordance with workplace requirements
- dealing with an unplanned event on at least one (1) occasion.
Knowledge evidence
- relevant legislation, regulations, standards, codes of practice and organisational workplace requirements, including:
- WHS/OHS
- excavation/trench safety
- use of LPG
- hazard, risk assessment and risk control requirements, including potential hazards
- types and application of PPE
- safe use of plant, tools and equipment
- events constituting an unplanned event or incident
- procedures for responding to an unplanned event or incident
- diagrams/plans
- power cables, including:
- cables types and sizes
- cable construction and bending radius
- cable laying, including:
- excavation/trenching
- conduit laying and sealing
- cable alignments and depths
- plant, tools and equipment for cable laying
- clearance from other underground cables or buried utilities
- cable handling
- cable laying methods
- cable pulling methods
- cable tensioning methods
- cable protection methods
- cable sealing
- bedding and backfilling.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UETDRDU016
What does an assessment tool for UETDRDU016 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UETDRDU016 needs to address all 68 unit components: 3 elements with 26 performance criteria, 16 performance evidence requirements, 26 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UETDRDU016?
Auditori pulls the current release of UETDRDU016 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UETDRDU016 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UETDRDU016 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UETDRDU016, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UETDRDO001 — Inspect overhead poles, structures and electrical apparatus
- UETDRDO003 — Maintain energised high voltage distribution overhead electrical apparatus (glove and barrier)
- UETDRDO004 — Maintain energised high voltage distribution overhead electrical apparatus (stick)
- UETDRDO005 — Maintain overhead energised low voltage distribution network
- UETDRDO006 — Maintain, test and verify distribution overhead network
- UETDRDS015 — Assess distributed energy resource connections to a distribution network
- UETDRDS016 — Coordinate and perform line and easement surveys
- UETDRDS017 — Design customer substations
- UETDRDS018 — Design distribution protection systems
- UETDRDS019 — Design distribution substations
- UETDRDS020 — Design overhead distribution systems
- UETDRDS021 — Design public lighting systems
Your UETDRDU016 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UETDRDU016 free