What an assessment for UETDRDU009 must cover
92 assessable components: 3 elements (23 performance criteria), 51 performance evidence and 18 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to install, test and verify underground cable installations
- 1.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are referred to and confirmed
- 1.2Work plan is obtained and confirmed in accordance with workplace requirements
- 1.3Materials required for work are determined and obtained in accordance with work plan and workplace requirements
- 1.4Plant, tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
- 1.5Hazards are identified, risks assessed and control measures identified and applied
- 1.6Work is prioritised and sequenced for completion in accordance with work plan and workplace requirements
- 1.7Work permits are received and signed in accordance with workplace requirements
- 1.8Worksite is prepared in accordance with the work plan and workplace requirements
2 Carry out installation, testing and verifying of underground cable installations
- 2.1Legislation, regulations, standards, codes of practice and organisational workplace requirements for the work to be performed are applied and monitored
- 2.2Manual handling, working in confined spaces, and the use of plant, tools, equipment and PPE are carried out in accordance with workplace requirements
- 2.3Hazard control measures are monitored in accordance with workplace requirements
- 2.4Cable is prepared and tested in accordance with the work plan and workplace requirements
- 2.5Cable jointing, terminating and testing is carried out in accordance with the work plan and workplace requirements
- 2.6Electrical equipment is tested in accordance with the work plan and workplace requirements
- 2.7Low voltage (LV) service installation is connected and tested in accordance with the work plan and workplace requirements
- 2.8Cable installation is verified in accordance with the work plan and workplace requirements
- 2.9Incidents or unplanned events are responded to in accordance with workplace requirements
3 Complete work and documentation
- 3.1Worksite is rehabilitated, cleaned and made safe in accordance with workplace requirements
- 3.2Incidents or unplanned events are reported in accordance with workplace requirements
- 3.3Plant, tools and equipment are cleaned, checked and returned to storage in accordance with workplace requirements
- 3.4Surplus materials are returned to storage or disposed of in accordance with workplace requirements
- 3.5Work permits are signed off in accordance with workplace requirements
- 3.6Work records, reports and documentation are completed in accordance with workplace requirements
Performance evidence
- applying relevant legislation, regulations, standards, codes of practice and organisational workplace requirements, including:
- work health and safety (WHS)/occupational health and safety (OHS)
- identifying hazards, assessing risks, identifying, applying and monitoring control measures
- interpreting and using drawings, diagrams and instructions
- obtaining, inspecting and using relevant personal protective equipment (PPE)
- completing at least one (1) of the following low voltage (LV) joints:
- tee-off
- straight
- breech
- completing at least one (1) of the following high voltage (HV) joints:
- tee-off
- straight
- breech
- completing at least one (1) of the following LV terminations:
- pole top
- transformer
- LV switchboard
- pillar/turret
- lighting column
- completing at least one (1) of the following HV terminations:
- pole top
- transformer
- switchgear
- completing at least two (2) of the following cable tests:
- voltage
- continuity
- insulation resistance
- phase identification
- installing electrical equipment, including:
- testing electrical equipment
- testing earthing systems
- connecting a LV service cable
- testing consumer/customer connections, including at least five (5) of the following:
- neutral integrity*
- polarity*
- voltage
- current
- phase rotation
- insulation resistance
- neutral identification
- loop impedance
- earth resistance
- (*must do)
- verifying cable installations, including:
- complying with the work plan
- identifying and rectifying non-compliance issues
- using testing equipment in accordance with workplace requirements
- recording test results in accordance with workplace requirements
- obtaining and signing on and off relevant work permits in accordance with workplace requirements
- dealing with an unplanned event on at least one (1) occasion
- completing relevant work records, reports and documentation
Knowledge evidence
- relevant legislation, regulations, standards, codes of practice and organisational workplace requirements including:
- WHS/OHS
- live LV connection principles
- hazard, risk assessment and risk control requirements, including potential hazards
- types and application of PPE
- safe use of plant, tools and equipment
- application, purpose and types of permits
- construction manuals, system diagrams/plans and drawings
- HV and LV cable installation, including:
- cable jointing and terminating procedures
- testing procedures
- electrical equipment installation, including:
- construction and connection procedures
- testing procedures
- LV service installation, including:
- connection procedures
- testing procedures
- cable installation verification procedures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UETDRDU009
What does an assessment tool for UETDRDU009 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UETDRDU009 needs to address all 92 unit components: 3 elements with 23 performance criteria, 51 performance evidence requirements, 18 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UETDRDU009?
Auditori pulls the current release of UETDRDU009 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UETDRDU009 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UETDRDU009 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UETDRDU009, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UETDRDO001 — Inspect overhead poles, structures and electrical apparatus
- UETDRDO003 — Maintain energised high voltage distribution overhead electrical apparatus (glove and barrier)
- UETDRDO004 — Maintain energised high voltage distribution overhead electrical apparatus (stick)
- UETDRDO005 — Maintain overhead energised low voltage distribution network
- UETDRDO006 — Maintain, test and verify distribution overhead network
- UETDRDS015 — Assess distributed energy resource connections to a distribution network
- UETDRDS016 — Coordinate and perform line and easement surveys
- UETDRDS017 — Design customer substations
- UETDRDS018 — Design distribution protection systems
- UETDRDS019 — Design distribution substations
- UETDRDS020 — Design overhead distribution systems
- UETDRDS021 — Design public lighting systems
Your UETDRDU009 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UETDRDU009 free