UEERS0025Maintain active level crossing equipment

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERS0025 must cover

50 assessable components: 3 elements (27 performance criteria), 11 performance evidence and 12 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to maintain active level crossing equipment

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and applied
  • 1.2Hazards are identified, WHS/OHS risks are assessed, and control measures and workplace procedures implemented in preparation for work
  • 1.3Scope of maintenance is determined from maintenance schedules, job specifications, drawings and regulatory requirements
  • 1.4Appropriate rail safe working person/s is consulted to ensure work is coordinated effectively with others to minimise rail traffic disruption
  • 1.5Materials needed for the maintenance work are obtained in accordance with workplace procedures and checked against job specifications
  • 1.6Tools, equipment and testing devices needed for maintenance work are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.7Appropriate safe procedures for road vehicles, pedestrians and rail vehicles using the crossing during the maintenance activity are confirmed to be in place
  • 1.8Authorisation to take temporarily out of service or disable systems is obtained in accordance with workplace procedures

2 Maintain active level crossing equipment

  • 2.1WHS/OHS risk control measures and workplace procedures for carrying out work are followed
  • 2.2On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system
  • 2.3Equipment function is determined from relevant technical manuals and operating instructions to identify accessible operating requirements
  • 2.4Equipment and components are cleaned, lubricated and adjusted to specified standard
  • 2.5Equipment/component abnormalities are identified and appropriate remedial actions taken to ensure equipment conforms and performs to technical specifications
  • 2.6Maintenance is performed efficiently, without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices
  • 2.7Equipment faults/damage are identified using efficient fault-finding and diagnostic techniques, including fault indicators, error codes and maintenance records
  • 2.8Maintenance are performed using appropriate tools, inspection and test equipment to ensure signalling equipment operates to required technical and operational standards
  • 2.9Faulty, worn, damaged or insecure components are replaced, repaired or secured in accordance with manufacturer specifications and workplace requirements
  • 2.10Methods for dealing with unplanned situations are determined on the basis of safety and specified work outcomes
  • 2.11Fault-finding and repairs are carried out efficiently, without waste of materials, damage to apparatus, the surrounding environment or services using sustainable energy practices
  • 2.12Equipment is inspected, tested and adjusted using appropriate test equipment and workplace procedures to ensure it operates within the specified technical standards
  • 2.13Level crossing lamp alignments are carried out as part of testing and adjusting workplace procedures, as required

3 Complete active level crossing equipment maintenance

  • 3.1WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2Confirmation that system is functional and that no alarms are present or indicated
  • 3.3Equipment is taken out of service/brought back into use, as required, and documentation is completed in accordance with workplace procedures
  • 3.4On-track safe working requirements are removed in accordance with workplace procedures and safety management system
  • 3.5Work records and documentation are completed to ensure accurate maintenance records are maintained
  • 3.6Worksite/equipment is reinstated in accordance with organisation requirements and faulty components are tagged, recorded and dispatched for repair/replacement

Performance evidence

  • identifying and implementing: required workplace procedures and practices; relevant WHS/OHS requirements, including identifying risks and applying control measures; rail safe working practices and relevant industry standards, codes and rail safety regulations; environmental protection procedures and requirements and sustainable energy principles and practices
  • interpreting specifications correctly
  • preparing to maintain active level crossing equipment for roads and pedestrians
  • identifying tools and equipment required for maintenance and using them correctly
  • recertifying electrically-operated level crossing equipment to operational requirements
  • using appropriate fault-finding techniques
  • maintaining electrically-operated level crossing equipment to operational requirements
  • maintaining active level crossing equipment
  • organising work to minimise road and rail traffic disruptions
  • completing relevant technical reports, records and documentation
  • dealing with unplanned events

Knowledge evidence

  • active level crossing equipment maintenance including: rail signalling and active level crossing equipment
  • equipment and their components encompassing: visual and audible warnings; barriers; control systems; alarm monitoring
  • operating principles and parameters encompassing: controls; remote alarm monitoring; failure modes; emergency operation
  • interpreting circuits diagrams to evaluate correct operation and relationship to other signalling circuits
  • correct operation in accordance with control and locking tables
  • servicing procedures encompassing: maintenance documentation; coordination/planning sequence; operational test procedures; scheduled/preventative maintenance; unscheduled/corrective maintenance
  • certification of active level crossing equipment
  • certifying procedures applicable for compliance with rail operator and/or enterprise standards
  • WHS/OHS requirements including: relevant job safety assessments or risk mitigation processes; legislated requirements; rail safe systems of working; safety management system; safe working practices
  • relevant standards (scope of AS7658 Level Crossings), codes and regulations
  • relevant manufacturer specifications and manuals
  • relevant workplace policies and procedures, including rail transport operator safety management system

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERS0025

What does an assessment tool for UEERS0025 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERS0025 needs to address all 50 unit components: 3 elements with 27 performance criteria, 11 performance evidence requirements, 12 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERS0025?

Auditori pulls the current release of UEERS0025 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERS0025 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERS0025 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERS0025, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERS0025 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERS0025 free