UEERS0024Install and maintain rail track circuit leads and bonds

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERS0024 must cover

60 assessable components: 3 elements (32 performance criteria), 12 performance evidence and 16 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to install/maintain track circuit leads and bonds

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for work area are identified, obtained and applied
  • 1.2Hazards are identified, risks assessed, and control measures and workplace procedures implemented
  • 1.3Safety hazards that have not previously been identified are noted on job safety assessments and existing risk control measures implemented
  • 1.4Any rails or cables with traction return current are identified and protection measures planned
  • 1.5Missing or broken bonding cables are identified using track circuit bonding drawings
  • 1.6Appropriate person/s is consulted to ensure work is coordinated effectively with others involved on the worksite
  • 1.7Installation/maintenance instructions are reviewed to obtain clear and concise work requirements
  • 1.8Site bonding layout plan is reviewed to clarify bonding requirements
  • 1.9Material to install/maintain track circuit leads and bonds is obtained in accordance with workplace procedures and checked against job specifications
  • 1.10Tools, equipment and testing devices to install/maintain track circuit leads and bonds are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.11Preparatory work is checked to ensure no unnecessary damage has occurred and complies with job specifications

2 Install/maintain track circuit leads and bonds

  • 2.1WHS/OHS risk control measures and workplace procedures for carrying out work are followed
  • 2.2On-track safe working requirements are identified and applied in accordance with workplace procedures and safety management system
  • 2.3Specified leads and bonds are run and positioned appropriately to the formation conditions and to minimise potential damage from track maintenance machines
  • 2.4Protection measures for traction return current are implemented prior to removing any cables, bonds or cutting rails
  • 2.5Installation/maintenance of track circuit leads and bonds are appropriately sequenced in accordance with job schedule
  • 2.6Positions of boxes and cable pits are checked to ensure compliance with specifications and appropriate follow-up action is initiated, as required
  • 2.7Components and rail surfaces are prepared to ensure secure and sound connections in accordance with job specifications
  • 2.8Leads or bonds are connected using specified fastening techniques ensuring technical compliance is achieved
  • 2.9Established methods for dealing with unplanned situations are discussed with appropriate person/s and documented in accordance with workplace procedures
  • 2.10Unplanned situations are dealt with safely in a manner that minimises risk to personnel and equipment and with the approval of an authorised person
  • 2.11Track circuit leads and bonds are installed and connected efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices
  • 2.12Bonds, leads and rail connections are inspected for damage or deterioration and appropriate corrective action is initiated in accordance with workplace procedures
  • 2.13Appropriate tests are completed to identify components requiring repair or replacement in accordance with workplace procedures and job specifications
  • 2.14Repair or replacement of components is carried out with due regard to train movements and safety of person/s involved
  • 2.15Temporary bonding is installed, as required, and electrical readings on bonds/lead connections and insulated rail joints are taken to ensure compliance with specifications and site bonding layout plan
  • 2.16Track-related equipment is inspected for faults or damage and all faults are documented and appropriate follow-up action is initiated in accordance with workplace procedures

3 Complete installation/maintenance of track circuit leads and bonds

  • 3.1WHS/OHS risk control, work completion measures and workplace procedures are followed
  • 3.2All cables and bonds associated with traction return current are reinstated and no additional bonds or current paths that may impact on track circuit correct operation are present
  • 3.3Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.4On-track safe working requirements are removed in accordance with workplace procedures and safety management system
  • 3.5Work completion is documented, relevant reports produced and appropriate person/s notified in accordance with workplace procedures

Performance evidence

  • applying relevant codes of practice, work health and safety (WHS)/occupational health and safety (OHS) requirements. industry regulation and environmental procedures
  • preparing to install/maintain track circuit leads and bonds
  • selecting and using tools correctly.
  • performing plant hazard assessment on power tools used for rail fitting and cable termination
  • interpreting relevant specifications. diagrams and track insulation plans correctly
  • selecting correct cable and rail connection termination part, sizes and types
  • installing/maintaining track circuit leads and bonds correctly
  • applying bonding techniques correctly
  • dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • ensuring bonds and leads testing and test results comply with technical requirements
  • completing installation/maintenance of track circuit leads and bonds
  • completing relevant technical reports, records and documentation

Knowledge evidence

  • rail terminology, including signalling nomenclature, signalling symbols and terms relevant to each state or territory
  • relationship to the signalling arrangement plan/scheme
  • basic track circuit operation
  • purpose and application of bonding plans
  • track circuit connection methods and types
  • track connections/track circuit leads
  • bonding of turnouts (series /parallel)
  • renewal of track leads and bonds
  • traction bonding in electrified areas
  • safe movement of rail vehicles and trains, including role of the track circuit in rail signalling system in enabling safe and efficient movement of trains
  • relevant track circuit testing requirements
  • typical issues/faults affecting rail electrotechnology services and systems
  • scheduled and unscheduled infrastructure maintenance requirements
  • track circuit leads and bonds installation and maintenance procedures
  • methods for recording and maintaining work records and documentation
  • relevant manufacturer specifications and manuals

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERS0024

What does an assessment tool for UEERS0024 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERS0024 needs to address all 60 unit components: 3 elements with 32 performance criteria, 12 performance evidence requirements, 16 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERS0024?

Auditori pulls the current release of UEERS0024 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERS0024 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERS0024 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERS0024, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERS0024 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERS0024 free