TLILIC0024Licence to operate a vehicle loading crane (capacity 10 metre tonnes and above)

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for TLILIC0024 must cover

93 assessable components: 4 elements (40 performance criteria), 29 performance evidence and 24 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan work/task

  • 1.1Task requirements are identified from work orders or equivalent, a lift plan is confirmed with associated personnel and a site inspection is conducted in accordance with workplace procedures
  • 1.2Work area operating surface is confirmed to determine the quality of ground suitability for operational use of vehicle loading crane in accordance with workplace procedures
  • 1.3Vehicle loading crane Rated Capacity (RC) and the lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer requirements and workplace procedures
  • 1.4Appropriate paths for operating the vehicle loading crane and moving and placing load/s in work area are assessed and determined in accordance with workplace procedures
  • 1.5Relevant hazard identification and risk elimination/control measures are applied and advised to relevant personnel in accordance with workplace procedures
  • 1.6Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
  • 1.7Appropriate communication procedures are identified and tested with associated personnel in accordance with workplace procedures
  • 1.8All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures
  • 1.9Information required to ensure that lifting equipment and gear inspection, use, maintenance and storage complies with manufacturer requirements is obtained and interpreted

2 Prepare for work/task

  • 2.1Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures
  • 2.2Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
  • 2.3Vehicle loading crane controls are accessed safely in accordance with manufacturer requirements and safe work procedures
  • 2.4Pre-start vehicle loading crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer requirements
  • 2.5Vehicle loading crane is set up correctly with any lifting gear as per the lift plan and in accordance with relevant manufacturer requirements, including load chart/s and safe work procedures
  • 2.6Boom/jib and lifting gear are set up, as required, in accordance with specific manufacturer requirements and safe work procedures
  • 2.7Vehicle loading crane is stabilised appropriately in accordance with the lift plan, relevant manufacturer requirements and safe work procedures
  • 2.8Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer requirements and safe work procedures
  • 2.9Vehicle loading crane logbook is inspected and is correct for the crane type, is completed and signed, and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
  • 2.10Weather and work environment conditions are assessed to determine any impact on vehicle loading crane operations in accordance with manufacturer requirements and safe work procedures
  • 2.11Weight of load is identified, calculated or estimated
  • 2.12Derated WLL of lifting equipment resulting from selected slinging techniques is calculated
  • 2.13Suitable lifting points and slinging techniques are identified
  • 2.14Lifting equipment and gear is prepared for safe use
  • 2.15Load destination is confirmed for stability ensuring it is able to bear the load and is prepared for safe access and landing

3 Perform work/task

  • 3.1Lifts are determined within the RC of the vehicle loading crane in accordance with the load chart/s and lift plan
  • 3.2Boom/jib and hook block are safely positioned over the load following directions from associated personnel where applicable and in accordance with the lift plan and safe work procedures
  • 3.3Lifting equipment and gear are connected to the load and used safely in accordance with the lift plan, safe work procedures and manufacturer requirements
  • 3.4Test lift is carried out in accordance with safe work procedures
  • 3.5Loads are transferred using relevant crane movements and tag lines, as required, in accordance with lift plan and safe work procedures
  • 3.6Load and crane movement is monitored constantly and crane is operated safely in accordance with lift plan and safe work procedures
  • 3.7All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with the lift plan and safe work procedures
  • 3.8Load is lowered and landed safely in accordance with lift plan and safe work procedures
  • 3.9Lifting gear is disconnected from load and crane is positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
  • 3.10Lifting equipment and gear are inspected for defects, and defective items are isolated, tagged and reported

4 Pack up

  • 4.1Crane boom/jib, lifting gear and associated equipment are stowed and secured as required in accordance with manufacturer requirements and safe work procedures
  • 4.2Relevant motion locks and brakes are applied as required in accordance with manufacturer requirements and safe work procedures
  • 4.3Stabilisers are stowed and secured in accordance with manufacturer requirements and safe work procedures
  • 4.4Crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
  • 4.5Plates or packing are stowed and secured in accordance with safe work procedures
  • 4.6Shutdown crane checks are carried out in accordance with safe work procedures and manufacturer requirements

Performance evidence

  • applying relevant communication signals from associated personnel
  • applying relevant crane movements, including: - boom/jib up and down (luffing) - catching load swing appropriately - positioning and using main hook and lifting gear to connect to load safely - raise and lower hoist - slew boom/jib - telescope in and out
  • applying relevant mathematical calculations in conjunction with lift plan and load chart to determine radius requirements and relevant lifting gear to perform work/task to enable crane to be configured for load, including: - boom - stabiliser positioning - type of hook
  • carrying out operational checks ensuring: - all controls are located, identified and tested for functionality - all hydraulic functions are operational - lifting gear movements and control functions are smooth and comply with lift plan - hazard warning systems, safety, audible and visual warning devices are checked to ensure they are functional, including: - reversing beepers - lights - horns - start-up is in accordance with manufacturer requirements and safe work procedures - there are no unusual noises - crane control functions comply with operating requirements
  • communicating with other associated personnel through using appropriate worksite procedures, including: - two-way radio - active listening - demonstrating and interpreting hand signals - questioning to confirm understanding - signage - whistles - written instructions
  • completing pre-start checks, including: - engine/mechanical fluid level checks as required by manufacturer requirements - presence of correct logbook - evidence of damage - fluid leaks - lights work effectively - locating, identifying and confirming all controls - fire extinguisher - safety equipment checks - signage and labels to ensure they are visible and legible - checking for signs of paint separation and stressed welds indicating potential structural weakness - tyres and wheels for damage/wear and correct inflation - updating records as required - visual damage or equipment faults
  • complying with Commonwealth, state and territory work health and safety (WHS)/occupational health and safety (OHS) legislation
  • conducting and applying risk and hazard assessment strategies, including: - confirming work area operating surface suitability based on crane and task requirements - dynamic loads - ground conditions, including condition of surface and slopes - load swing - overloading - lifting and placing load - tyre pressures and tyre condition - asymmetric loads - overhead hazards, including electric lines and service pipes - restricted and poorly ventilated areas - risk of collision with people, moving plant and fixed structures - adequate lighting - traffic, including pedestrians, vehicles and other plant - weather conditions
  • confirming and following traffic management plan procedure relevant to their role in the work area
  • identifying hazards and using appropriate risk controls and safety measures and equipment relevant to slinging loads
  • selecting and inspecting appropriate lifting gear and applying slinging techniques appropriate to the type of load, its mass and centre of gravity
  • identifying the Working Load Limit (WLL) tags of the lifting equipment and gear and calculating the deration of the WLL resulting from the slinging techniques applied
  • using lifting gear, including flexible steel wire rope (FSWR) sling, synthetic sling, chain sling (including shortener), spreader bar or lifting beam, tag line, shackles and eyebolts, and using bends and hitches when slinging, including: - single sheet bend - clove hitch - bowline
  • determining any defects or faults with operation of crane and reporting to relevant person/s
  • ensuring risk control measures within the work area are effective in accordance with workplace procedures
  • identifying, isolating and tagging out defective lifting equipment, and reporting to authorised person/s
  • interpreting and confirming relevant documentation for the work task and relevant area
  • maintaining three points of contact whilst accessing load surface area of vehicle loading crane and ensure rungs/steps are free of hazards
  • monitoring load disconnection from hook is safe and ensuring no movement of controls or the load
  • operating a vehicle loading crane configured to its Rated Capacity (RC) of 10 metre tonnes or more to lift and move four different loads using the main hook through an obstacle course using all crane operational controls while the load is in full view of the crane operator. Loads must consist of: - a load of >50% of the RC of the crane with a boom length of >75%, and - a round load with a minimum length of 3 metres and minimum weight of at least 200 kg, and - an asymmetrical load, and - stillage or cage containing loose items with a minimum weight of at least 200 kg
  • positioning the vehicle loading crane for safe operation for: - application of the task - manoeuvring in the workplace - stability of the vehicle loading crane and the load
  • positioning vehicle loading crane in relevant area for next task
  • recording and maintaining accurate information relating to crane operations
  • reporting to relevant person/s on site risk control measures that are not in place or deficient
  • setting up and validating an exclusion zone
  • shutting down a vehicle loading crane in accordance with manufacturer requirements and safe work procedures
  • stabilising a vehicle loading crane for operation by: - correctly positioning plates or packing - deploying stabilisers - establishing correct size plates or packing in accordance with lift plan - levels are checked
  • test-lifting load just clear of lifting plane to allow for checks to be safely made to ensure: - slinging is correct - all crane equipment is functioning properly - load centre of gravity is correct - loads of unusual shape or weight distribution are correctly slung
  • using communications signals, including: - hoist down - hand and whistle and radio - hoist up - hand and whistle and radio - luff boom down - hand and whistle and radio - luff boom up - hand and whistle and radio - slew left - hand and whistle and radio - slew right - hand and whistle and radio - stop - hand and whistle and radio - telescope in - hand and whistle and two-way radio (where manufacturer requirements allow) - telescope out - hand and whistle and two-way radio (where manufacturer requirements allow)

Knowledge evidence

  • appropriate worksite communication procedures, including: - listening - hand signals - questioning techniques - signage - two-way radios - written instructions - whistles
  • characteristics and impact of factors affecting vehicle loading crane stability whilst moving loads, including: - overloading - poor load placement - asymmetric loads - tyre deflation/condition
  • crane, lifting gear load chart/s and manufacturer requirements
  • hazards, including: - pack up and crane stability, crane tipping and demolition sites - ground stability, including ground condition, recently filled trenches and slopes - insufficient lighting - obstacles or obstruction - other specific hazards and dangerous materials - overhead hazards, including: - electric lines - service pipes - fixed structures - vegetation (trees) - traffic, including pedestrians, vehicles and other plant - operations on unusual, uneven or difficult terrains
  • lift impacting factors, including: - centre of gravity - dynamic nature of load - flex/deflexion of load - length - radius of lift - weight
  • manufacturer requirements on stabiliser procedures
  • manufacturer requirements and instructions on shutting down and packing up crane
  • mathematical calculations to: - estimate loads - establish radius requirements - determine relevant lifting gear to perform work/task
  • pre-start and operational checks required for a vehicle loading crane
  • problems and appropriate response procedures to unplanned and/or unsafe situations and environmental conditions
  • relevant documentation requirements and procedures for recording, reporting and maintaining workplace records and information
  • relevant workplace instructions, safety information and emergency procedures
  • risk assessment management and mitigation strategies, including hierarchy of control: - elimination - substitution - isolation - engineering controls - administrative controls - personal protective equipment (PPE)
  • roles and responsibilities of duty holders in accordance with legislative obligations of WHS/OHS requirements and safe work/workplace procedures
  • hazards commonly encountered while slinging: - instability of landing surfaces - overhead and underground hazards - insufficient lighting - traffic - weather - pedestrian traffic - work at heights
  • selection, inspection, care, handling, application, limitations and storage of lifting equipment and gear: - Flexible Steel Wire Rope (FSWR) sling - synthetic sling - chain sling (including shortener) - spreader bar or lifting beam - tag line - shackles - eyebolts
  • methods of making temporary connections to loads using fibre and/or synthetic ropes: - single sheet bend - clove hitch - bowline
  • stability of load and avoidance of hazards, including: - allowing for boom deflection - boom/jib as low as possible - crane stability - gently accelerating and braking on slew/boom to minimise load swing - lowering load safely onto appropriate dunnage taking into consideration swing and restrictions of area - minimum boom/jib length - minimum speed - using handheld tag lines as required - identification of incorrect sling of load
  • starting procedure of crane in accordance with manufacturer requirements
  • set-up of: - jib - fly jib (where fitted)
  • vehicle loading crane characteristics and capabilities to allow crane configuration to suit a range of loads
  • weather bureau forecasts and environmental conditions that could impact operation, including: - lightning - wind - water impacted ground - ultraviolet (UV) exposure
  • work area suitability based on relevant ground reports, including: - backfilled ground - bitumen - concrete - hard compacted soil - pre-contaminated soils - rock - rough, uneven ground - soft soils
  • workplace standards, requirements, policies and procedures for conducting operations for the vehicle loading crane.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing TLILIC0024

What does an assessment tool for TLILIC0024 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLILIC0024 needs to address all 93 unit components: 4 elements with 40 performance criteria, 29 performance evidence requirements, 24 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for TLILIC0024?

Auditori pulls the current release of TLILIC0024 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLILIC0024 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing TLILIC0024 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLILIC0024, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your TLILIC0024 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate TLILIC0024 free