TLILIC0016 — Licence to operate a bridge and gantry crane
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for TLILIC0016 must cover
90 assessable components: 4 elements (38 performance criteria), 32 performance evidence and 19 knowledge evidence requirements, plus 1 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan work/task
- 1.1Task requirements are identified from work orders or equivalent, a lift plan is confirmed with associated personnel and a site inspection conducted in accordance with workplace procedures
- 1.2Working area is inspected and appropriate paths for operating the bridge or gantry crane and moving/placing load/s in work area are assessed and determined in accordance with workplace procedures
- 1.3Work area operating surface is assessed to determine the quality of ground suitability for operational gantry crane in accordance workplace procedures
- 1.4Bridge or gantry crane Rated Capacity (RC) and lifting gear Working Load Limit (WLL) are established for the load/s and work/task requirements in accordance with manufacturer specifications and workplace procedures
- 1.5Relevant hazard identification and risk elimination/control measures are applied and advised to relevant person/s in accordance with workplace procedures
- 1.6Traffic management plan implementation is confirmed and followed in accordance with workplace procedures
- 1.7Appropriate communication procedures are identified and tested with associated personnel in accordance workplace procedures
- 1.8All tasks are confirmed to ensure requirements for the relevant work area in accordance with workplace procedures
- 1.9Information required to ensure that lifting equipment and gear inspection, use, maintenance and storage complies with manufacturer requirements is obtained and interpreted
2 Prepare for work/task
- 2.1Consultation with workplace personnel is established and maintained to ensure all crane and lifting operations are clear and consistent with site requirements in accordance with a lift plan and workplace procedures
- 2.2Risk control measures for hazards identified are checked for implementation in accordance with the lift plan and safe work procedures
- 2.3Bridge or gantry crane is accessed safely in accordance with manufacturer specifications and safe work procedures
- 2.4Pre-start bridge or gantry crane checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with safe work procedures and manufacturer specifications
- 2.5Bridge or gantry crane is set up and rigged correctly with any lifting gear as per lift plan and in accordance with relevant manufacturer specifications, including load chart/s and safe work procedures
- 2.6Operational checks are carried out and any damage and defects are reported, recorded and appropriate action is taken in accordance with manufacturer specifications and safe work procedures
- 2.7All controls are located, identified and tested in accordance with relevant manufacturer specifications and safe work procedures
- 2.8Crane logbook is inspected and is correct for the crane and type, and required rectifications have been signed off in accordance with manufacturer requirements and safe work procedures
- 2.9Weather and work environment conditions are assessed to determine any impact on bridge or gantry crane operations in accordance with manufacturer requirements and safe work procedures
- 2.10Weight of load is identified, calculated or estimated
- 2.11Derated WLL of lifting equipment resulting from selected slinging techniques is calculated
- 2.12Suitable lifting points and slinging techniques are identified
- 2.13Lifting equipment and gear are prepared for safe use
- 2.14Load destination is confirmed for stability ensuring it is able to bear the load and is prepared for safe access and landing
3 Perform work/task
- 3.1Lifts are determined within the RC of the bridge or gantry crane in accordance with load chart/s and lift plan
- 3.2Hook block is safely positioned over the load in accordance with safe work procedures and if crane is controlled from cabin following directions from associated personnel
- 3.3Lifting equipment and gear are connected to load and used safely in accordance with the lift plan and safe work procedures
- 3.4Test lift is carried out in accordance with safe work procedures
- 3.5Loads are transferred using relevant bridge or gantry crane movements and tag lines, as required, in accordance with lift plan and safe work procedures
- 3.6Load and bridge or gantry crane movement is monitored constantly and operated safely in accordance with lift plan and safe work procedures
- 3.7All required communication signals are correctly interpreted and followed whilst crane is operated in accordance with safe work procedures
- 3.8Load is lowered and landed safely in accordance with lift plan and safe work procedures
- 3.9Lifting gear is disconnected from load and positioned safely and efficiently for next task in accordance with lift plan and safe work procedures
- 3.10Lifting equipment and gear are inspected for defects, and defective items are isolated, tagged and reported
4 Pack up
- 4.1Bridge or gantry crane is parked in accordance with manufacturer specifications and safe work procedures
- 4.2Bridge or gantry crane lifting gear and associated equipment are stowed and secured in accordance with safe work procedures
- 4.3Relevant motion locks and brakes are applied, as required, in accordance with manufacturer specifications and safe work procedures
- 4.4Bridge or gantry crane is shut down and secured to prevent unauthorised access/use in accordance with safe work procedures
- 4.5Post-operational bridge or gantry crane checks are carried out in accordance with safe work procedures and manufacturer specifications
Performance evidence
- applying and interpreting crane manufacturer requirements and data, including load charts, to enable crane to be configured for load
- applying relevant crane movements, including: - catching load swing appropriately - positioning and using lifting attachment and lifting gear to connect to load safely - raising and lowering hoist
- applying relevant communication signals from associated personnel
- applying relevant mathematical calculations in conjunction with the Rated Capacity (RC) to determine relevant lifting gear to perform work/task
- complying with Commonwealth, state and territory work health and safety (WHS)/occupational health and safety (OHS) legislation and safe work procedures
- communicating with other workplace personnel through using appropriate worksite protocols, including: - two-way radio - listening - making and interpreting hand signals - questioning to confirm understanding - signage - verbal language - visual aids - whistles - written instructions
- completing pre-start checks, including: - presence of correct logbook - evidence of damage - pendant wiring not frayed or damaged (if applicable) - fluid leaks - lights work effectively - locating, identifying and confirming all controls - emergency evacuation rescue plan in place - mirrors and seat are adjusted appropriately - safety equipment checks - fire extinguisher - signage and labels to ensure they are visible and legible - checking for signs of paint separation and stressed welds indicating potential structural weakness - tyres/wheels for damage/wear and rail conditions are serviceable - visual damage or equipment faults
- completing operational checks ensuring: - all controls are located, identified and tested for functionality - all hydraulic functions are operated - lifting gear movements and control functions are smooth and comply with operating requirements - hazard warning systems, safety, audible and visual warning devices, including travel alarms, lights and horns are functional - start-up is in accordance with manufacturer requirements and workplace procedures - there are no unusual noises - long and cross travel, transmission and brake functions comply with operating requirements
- conducting and applying risk and hazard assessment strategies, including: - confirming work area operating surface suitability based on crane and task requirements - travelling surfaces are clear of debris and in serviceable condition - overloading - lifting and placing of load - asymmetric loads - overhead hazards - restricted and poorly ventilated areas - risk of collision with people, moving plant and fixed structures - adequate lighting - weather conditions
- confirming and following traffic management plan procedures relevant to their role in the work area
- identifying hazards and using appropriate risk controls and safety measures and equipment relevant to slinging loads
- selecting and inspecting appropriate lifting gear and applying slinging techniques appropriate to the type of load, its mass and centre of gravity
- identifying the WLL tags of the lifting equipment and gear and calculating the deration of the WLL resulting from the slinging techniques applied
- using lifting gear, including flexible steel wire rope (FSWR) sling, synthetic sling, chain sling (including shortener), spreader bar or lifting beam, tag line, shackles and eyebolts, and using bends and hitches when slinging, including: - single sheet bend - clove hitch - bowline
- controlling the load and attachments (where fitted), including: - long and cross travel - positioning crane in relevant area for next task
- determining any defects or faults with operation of crane and reporting to relevant personnel
- ensuring risk control measures within the work area are effective in accordance with workplace procedures
- ensuring stability of load and avoidance of hazards, including: - lifting attachment and lifting gear as low as possible - carrying load near to ground surface - accelerating and braking to minimise load swing - lowering load onto appropriate dunnage safely taking into consideration swing and restrictions of area - minimum speed - using handheld tag lines
- inputting crane configuration into crane computer (where fitted) and checking operation to accurately reflect crane configuration
- interpreting and acting on communication signals, including: - hoist down - hand, whistle and radio - hoist up - hand, whistle and radio - traverse (trolley) travel - hand, whistle and radio - long (bridge) travel - hand, whistle and radio - creep - hand, whistle and radio - stop - hand, whistle and radio
- interpreting and confirming relevant documentation for the work task and relevant area
- maintaining three points of contact whilst accessing crane and ensuring rungs/steps are free of hazards (if applicable)
- monitoring load disconnection from hook/lifting gear is safe and ensuring no movement of controls
- operating a bridge or gantry crane configured to lift and move four different loads using the main hook through an obstacle course using all crane operational controls while the load is in full view of the crane operator. Loads must consist of: - a load at least 5% of the RC of the crane
- positioning the crane for safe operation for: - application of the task - manoeuvring in the workplace - stability of the crane and the load
- recording and maintaining accurate information relating to crane operations
- reporting to relevant person/s on site risk control measures that are not in place or deficient
- setting up and validating an exclusion zone
- shutting down a bridge or gantry crane in accordance with manufacturer requirements and workplace procedures
- test-lifting load just clear of lifting plane to allow for checks to be safely made in consultation with associated personnel to ensure: - slinging is correct - all crane equipment is functioning properly - load centre of gravity is correct - loads of unusual shape or weight distribution are correctly slung
- test-lifting load just clear of lifting plane to allow for checks of crane computer (where fitted) to ensure: - load measuring equipment can be used to verify calculated weight of load - near capacity loads do not overload crane
- using two-way radio communication during movement of load
Knowledge evidence
- appropriate workplace communication procedures, including: - bells - buzzers - listening - hand signals - questioning techniques - signage - two-way radios - written instructions - whistles
- bridge or gantry crane characteristics and capabilities
- crane and lifting gear load chart/s and manufacturer requirements
- crane configuration mathematical calculations to: - estimate loads - determine relevant lifting accessories to perform work/task
- hazards, including: - erection and pack up - crane stability - ground stability and condition, including recently filled trenches and slopes - insufficient lighting - obstacles or obstruction - other specific hazards and dangerous materials - overhead hazards, including: - electric lines - service pipes - structures - traffic, including pedestrians, vehicles and other plant - operations on unusual, uneven or difficult terrains
- lift impacting factors, including: - centre of gravity - dynamic nature of load - flex/deflexion of load - length - weight
- manufacturer requirements and instructions on shutting down crane
- pre-start and operational checks required for a bridge or gantry crane
- problems and application of appropriate response procedures to unplanned and/or unsafe situations and environmental conditions, including: - wind, lightning and storms - failure of equipment - failure/loss of control, including brakes - obstacles and obstructions
- relevant documentation requirements and procedures for recording, reporting and maintaining workplace records and information
- relevant workplace instructions, safety information and emergency procedures
- risk assessment management and mitigation strategies, including hierarchy of control: - elimination - substitution - isolation - engineering controls - administrative controls - personal protective equipment (PPE)
- roles and responsibilities of duty holders in accordance with legislative obligations of WHS/OHS requirements and safe work/workplace procedures
- hazards commonly encountered while slinging: - instability of landing surfaces - overhead and underground hazards - insufficient lighting - traffic - weather - pedestrian traffic - work at heights
- selection, inspection, care, handling, application, limitations and storage of lifting equipment and gear: - FSWR sling - synthetic sling - chain sling (including shortener) - spreader bar or lifting beam - tag line - shackles - eyebolts - plate clamps - load moving attachments, including magnetic, vacuum and grab
- methods of making temporary connections to loads using fibre and synthetic ropes: - single sheet bend - clove hitch - bowline
- starting procedure of crane in accordance with manufacturer requirements
- weather bureau forecasts and associated information and environmental conditions that could impact operation, including: - lightning - rain - wind - water impacted ground - ultraviolet (UV) exposure
- workplace standards, requirements, policies and procedures for conducting operations for the bridge or gantry crane
Foundation skills
- Foundation skills: Foundation skills essential to performance are explicit in the performance criteria of this unit of competency.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing TLILIC0016
What does an assessment tool for TLILIC0016 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLILIC0016 needs to address all 90 unit components: 4 elements with 38 performance criteria, 32 performance evidence requirements, 19 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for TLILIC0016?
Auditori pulls the current release of TLILIC0016 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLILIC0016 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing TLILIC0016 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLILIC0016, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- TLILIC0001 — Licence to transport dangerous goods by road
- TLILIC0003 — Licence to operate a forklift truck
- TLILIC0004 — Licence to operate an order picking forklift truck
- TLILIC0005 — Licence to operate a boom-type elevating work platform (boom length 11 metres or more)
- TLILIC0011 — Licence to operate a reach stacker (greater than 3 tonnes capacity)
- TLILIC0017 — Licence to operate a derrick crane
- TLILIC0019 — Licence to operate a portal boom crane
- TLILIC0020 — Licence to operate a slewing mobile crane (over 100 Tonnes)
- TLILIC0021 — Licence to operate a slewing mobile crane (up to 100 Tonnes)
- TLILIC0022 — Licence to operate a slewing mobile crane (up to 20 tonnes)
- TLILIC0023 — Licence to operate a slewing mobile crane (up to 60 tonnes)
- TLILIC0024 — Licence to operate a vehicle loading crane (capacity 10 metre tonnes and above)
Your TLILIC0016 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate TLILIC0016 free