RIICTB309EConstruct, maintain and remove coffer dams

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for RIICTB309E must cover

72 assessable components: 4 elements (22 performance criteria), 4 performance evidence and 44 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare to construct and remove coffer dam

  • 1.1Obtain, interpret, clarify and confirm work instructions
  • 1.2Access, interpret and apply documentation required to remove coffer dams and confirm work activity is compliant
  • 1.3Obtain and interpret emergency procedures, and identify steps required to respond to emergencies
  • 1.4Select and wear personal protective equipment according to site requirements
  • 1.5Confirm and identify requirements for complying with environmental protection, safety and traffic management signage requirements
  • 1.6Identify, address and report environmental issues, potential hazards and risks
  • 1.7Select plant, tools and equipment required to carry out tasks and check for faults
  • 1.8Identify, confirm, and locate materials required for work application

2 Construct and maintain dam

  • 2.1Contact utilities to confirm placement of marine cables
  • 2.2Drive sheet piles into location according to job requirements
  • 2.3Brace sheet piles
  • 2.4Dewater and caulk dammed area according to job requirements
  • 2.5Install sump to remove excess water seepage
  • 2.6Remove mud manually from dammed area according to job requirements
  • 2.7Level dammed area for bridge work according to job requirements

3 Remove coffer dam

  • 3.1Clear dammed area of refuse and construction waste according to site requirements
  • 3.2Remove temporary concrete slab, where used
  • 3.3Flood coffer dam according to job requirements
  • 3.4Remove sheet pile
  • 3.5Extract and dismantle sheet piling according to job requirements to allow waterway to restore original flow

4 Conduct clean-up activities

  • 4.1Clear work area and dispose of or recycle materials according to site requirements
  • 4.2Clean, check, perform maintenance on and store machinery, tools and equipment according to manufacturer specifications and site requirements

Performance evidence

  • construct, maintain and remove coffer dams on at least two occasions, including: at least one coffer dam with at least four sheet piles, large enough to require bracing.
  • locate and apply required legislation, documentation, policies and procedures
  • identify, report and record hazards and risks
  • work with others to construct, maintain and remove coffer dams that meets required outcomes, including: organising work activities to meet task requirements; communicating with others to receive and clarify work instructions; using communication techniques and equipment, including signage to advise others of work activity and exclusion zones.

Knowledge evidence

  • legislation required to construct, maintain and remove coffer dams
  • policies, procedures and documentation required to construct, maintain and remove coffer dams, including those relating to:
  • site and equipment safety
  • risk assessment
  • emergency response
  • work health and safety
  • environmental protection
  • waste management
  • communication techniques and equipment
  • boat and water safety
  • dial before you dig
  • project quality requirements
  • operational, maintenance and basic diagnostic procedures
  • site isolation and traffic control responsibilities
  • job plans and specifications
  • site requirements
  • manufacturer specifications for required plant and equipment
  • workplace reporting requirements
  • principles and techniques required to construct, maintain and remove coffer dams, including those relating to:
  • coffer dam construction, including:
  • sheet pile construction
  • sandbags, timber or proprietary systems
  • construction conducted in conjunction with plant operations
  • dewatering
  • caulking
  • dammed area levelling
  • bridge foundations
  • bridge heritage
  • calculation of material requirements
  • bracing and loading
  • timber grading
  • laying concrete
  • engineering drawings
  • types, characteristics, technical capabilities and limitations of plant and equipment required to construct, maintain and remove coffer dams, including:
  • excavators
  • sludge pumps
  • bracing
  • slings
  • chains
  • caulking material
  • concrete
  • materials safety data sheet (SDS) compliance processes
  • components of job safety analyses (JSAs), job safety environmental analyses (JSEAs), and safe work method statements (SWMs)
  • civil construction terminology relating to constructing, maintaining and removing coffer dams.

Foundation skills

  • Oral communication: Identifies and interprets information from verbal instructions. Conveys information and instructions to others verbally
  • Self-management: Monitors and minimises own exposure to worksite risks and hazards during work activities

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing RIICTB309E

What does an assessment tool for RIICTB309E need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIICTB309E needs to address all 72 unit components: 4 elements with 22 performance criteria, 4 performance evidence requirements, 44 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for RIICTB309E?

Auditori pulls the current release of RIICTB309E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIICTB309E — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing RIICTB309E assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIICTB309E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your RIICTB309E assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate RIICTB309E free