CPCCRT3003 — Repair and replace valleys, valley irons and flashings
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCRT3003 must cover
53 assessable components: 6 elements (24 performance criteria), 14 performance evidence and 15 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to repair and replace valleys, valley irons and flashings.
- 1.1Read and interpret work instructions and plan sequence of work.
- 1.2Plan all work to comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications and workplace requirements.
- 1.3Select and use personal protective equipment (PPE) for each stage of the task.
- 1.4Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5Select tools and equipment, check for serviceability and report any faults.
- 1.6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Prepare valley section for repair.
- 2.1Locate damaged area from plans and specifications.
- 2.2Check that fall safety devices have been installed correctly.
- 2.3Identify tiles to be repaired or replaced from a removed sample.
- 2.4Remove damaged tiles with minimum disturbance to remaining roof tiles.
- 2.5Relocate existing tiles to blend aesthetically with new tiles.
- 2.6Remove pointing or bedding over valley irons, flashings and affected roof tiles without damage.
- 2.7Clean damaged area and remove waste.
- 2.8Check roof structure valleys and flashing installations for soundness and adequacy.
3 Repair valley sections.
- 3.1Repair/replace damaged structural components of valley section of roof.
- 3.2Replace/install roof tie down fixings to roof structure.
- 3.3Fabricate and install valley flashings.
4 Install roof tiles to valley and flashing sections.
- 4.1Inspect each replacement tile for match to original tiles.
- 4.2Mix bedding to Australian Standards.
- 4.3Lay tiles to existing design, gauge, alignment and bond specifications.
5 Apply bedding and pointing material.
- 5.1Apply bedding and pointing/storm seal material to Australian Standards.
- 5.2Point joints/collars to match finish to existing surrounds.
6 Clean up.
- 6.1Remove loose material from roof tile surface, clear work area, dispose of materials, and reuse or recycle in compliance with legislation, regulations and codes of practice.
- 6.2Clean, check, maintain and store tools and equipment in accordance with manufacturers’ specifications.
Performance evidence
- side flashing
- step flashing
- soaker flashings
- vent pipe flashing
- valley iron and valley board
- valley flashing (e.g. Dutch gable flashing)
- Dutch gable hip flashing
- skylight flashing
- chimney flashing
- brick pillar flashing
- front apron flashing
- butt ridge flashing
- secret hip flashing
- All work must be performed to the standard required in the workplace and must comply with laws and regulations, the National Construction Code (NCC), Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications and workplace requirements.
Knowledge evidence
- compliance requirements of the NCC and Australian Standards for repairing and replacing valleys, valley irons and flashings
- workplace quality policies and standards for repairing and replacing valleys, valley irons and flashings
- safety requirements or repairing and replacing valleys, valley irons and flashings, including: - job safety analyses and/or safe work method statements in accordance with Safe Work Australia Code of Practice for Construction Work or state and/or territory equivalent - safety data sheets (SDS) - personal protective equipment (PPE)
- techniques and procedures for repairing tiled roof valleys, valley irons and flashings
- environmental requirements for repairing and replacing valleys, valley irons and flashings
- characteristics and applications of materials used in repairing tiled roof valleys, valley irons and flashings
- processes for installation of roof battens, sarking and flashing
- types and uses of materials storage and environmentally friendly waste management
- measuring and marking for repairing and replacing valleys, valley irons and flashings
- types and uses of plans, drawings and specifications for repairing and replacing valleys, valley irons and flashings
- types and uses of tools and equipment for repairing and replacing valleys, valley irons and flashings
- types and uses of flashing: - side flashing - step flashing - soaker flashings - vent pipe flashing - valley flashing (e.g. Dutch gable flashing) - Dutch gable hip flashing - skylight flashing - chimney flashing - brick pillar flashing - front apron flashing - butt ridge flashing - secret hip flashing
- types and uses of of valley iron and valley board
- processes for the calculation of material requirements for repairing and replacing valleys, valley irons and flashings
- roof construction systems and structures and tiling considerations.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCRT3003
What does an assessment tool for CPCCRT3003 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCRT3003 needs to address all 53 unit components: 6 elements with 24 performance criteria, 14 performance evidence requirements, 15 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCRT3003?
Auditori pulls the current release of CPCCRT3003 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCRT3003 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCRT3003 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCRT3003, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
Your CPCCRT3003 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCRT3003 free