UEGNSG229Prepare simple drawings of as laid gas mains and services

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEGNSG229 must cover

51 assessable components: 3 elements (18 performance criteria), 17 performance evidence and 16 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan to prepare simple drawings of as laid gas mains and services

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) workplace procedures and environmental measures for the site are identified, obtained and applied
  • 1.2Types of drawings required and key features, symbols and abbreviations for each type of plan and drawing used in the gas industry are identified in accordance with the scope and standard of work being undertaken
  • 1.3Drawing requirements and needs are determined from work instructions and confirmed with relevant person/s in accordance with workplace procedures
  • 1.4Client issues in relation to the drawing requirements are clarified and resolved in accordance with workplace procedures
  • 1.5Equipment, tools and apparatus for producing drawings are identified, obtained and checked for correct operation prior to commencing work

2 Prepare drawings of as laid gas mains and services

  • 2.1Site inspection is conducted, as required, and factors that may impact on technical drawings, including orientation, altering landscapes, building structures or temporary land marks are identified
  • 2.2Starting point and cross reference points are established and measurements from the starting point, distances and off sets taken and recorded in accordance with job requirements and workplace procedures
  • 2.3As laid pipework is drawn to scale on graph paper using industry standard drawing conventions in accordance with relevant codes and technical industry standards
  • 2.4Fittings that effect the off-set or depth of the pipework, including elbows and tees, are indicated on the drawing as required
  • 2.5Additional fittings that need to be recorded in line with drawing specifications, including in-line valves and tapping tees, are indicated on the drawing, as required
  • 2.6All dimensions, including off-sets, distances, directions, pipe diameter, symbols and abbreviations are included on the drawing in accordance with job specifications and workplace procedures
  • 2.7Standard drawing conventions are used to correct original job drawing to show final as laid arrangement in accordance with workplace procedures
  • 2.8Quality and safety checks of work and testing of pipework is conducted in accordance with industry standards, work instructions and workplace procedures

3 Complete work and relevant documentation

  • 3.1Additional documentation is completed, including district plan number, network area, street name, pressure ratings, pipe size and type, date laid and additional comments, as required, in accordance with job requirements
  • 3.2Drawings are finalised and signed off/closed in accordance with workplace procedures
  • 3.3Tools, equipment and any surplus resources and materials are cleaned, checked and securely stored in accordance with workplace procedures
  • 3.4Appropriate person/s are notified of work completion in accordance with workplace procedures
  • 3.5All drawings and forms are completed and submitted to appropriate person/s in accordance with workplace procedures

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements
  • applying sustainable energy and environmental principles and practices
  • completing work and relevant documentation
  • completing relevant details on the drawing, including: pipe size, pressure range, location, diameter, material, fittings, off-sets, distances
  • conducting site inspections
  • dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • determining cross reference points
  • drawing as laid pipework to represent appropriate scale, perspective, dimension and volume
  • finalising drawings
  • identifying various gas pressures
  • identifying coding for different pressures
  • identifying various pipe materials
  • interpreting symbols and abbreviations
  • identifying and interpreting relevant gas drawings, including: district plans, mains detail plans, industrial services plans, gas easement drawings, transmission pipeline plans
  • identifying and interpreting relevant plans, including: Dial Before You Dig plans, drain plans, power plans, telecommunication plans, water plans
  • preparing drawing of a gas main or service
  • using legend to determine specifications

Knowledge evidence

  • as laid technical drawings for gas pipework
  • cross reference points
  • different gas related drawings, including: district plans, industrial drawings, easement drawings, gas mains detail plans, gas pipeline route maps and alignment sheets
  • drawing conventions and features
  • factors that may impact on technical drawings, including: orientation, altering landscapes, building structures, temporary land marks
  • fittings that effect the off-set or depth of the pipework
  • gas mains and services as laid drawings
  • key features, symbols and abbreviations on site plans
  • measuring devices to record off-sets
  • problem-solving techniques
  • relevant drawing equipment, tools, materials, drawings and personal protective equipment (PPE)
  • relevant legislation, standards, codes, regulations and procedure requirements
  • relevant manufacturer specifications
  • relevant WHS/OHS legislated requirements, including: hazard identification and reporting, implementing risk control measures
  • relevant workplace documentation, drawings and forms
  • relevant workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEGNSG229

What does an assessment tool for UEGNSG229 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEGNSG229 needs to address all 51 unit components: 3 elements with 18 performance criteria, 17 performance evidence requirements, 16 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEGNSG229?

Auditori pulls the current release of UEGNSG229 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEGNSG229 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEGNSG229 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEGNSG229, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEGNSG229 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEGNSG229 free