UEEDV0002Install aerial telecommunication cables

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEEDV0002 must cover

68 assessable components: 3 elements (22 performance criteria), 16 performance evidence and 30 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to install aerial communication cables

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2WHS/OHS risks are identified, and risk control measures and workplace procedures are followed in preparation for the work
  • 1.3Safety hazards not previously identified are noted and risk control measures implemented
  • 1.4Cabling installation is prepared in consultation with others affected by the work and sequenced in accordance with workplace procedures
  • 1.5Scope of work is determined from documentation and/or discussions with relevant person/s to establish the work to be undertaken
  • 1.6Cable routes are planned in accordance with the precinct, structure, significants and relevant industry standards
  • 1.7Advice is sought from relevant person/s to ensure the work is coordinated effectively with others
  • 1.8Material required for installation work is obtained in accordance with workplace procedures and job specifications
  • 1.9Tools, equipment and testing devices required for the installation work are obtained in accordance with workplace procedures and checked for correct operation and safety
  • 1.10Preparatory work is checked to ensure no damage has occurred in accordance with relevant industry standards

2 Install aerial communication cables

  • 2.1WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2Poles are checked for soundness in accordance with workplace procedures
  • 2.3Catenary cables are installed ensuring sufficient clearances are in accordance with relevant industry standards
  • 2.4Cables are attached to catenary without strain or damage in accordance with relevant industry standards
  • 2.5Cable ends are protected from damage in preparation for termination
  • 2.6Methods for dealing with unplanned situations are discussed with relevant person/s for approval and documented in accordance with workplace procedures
  • 2.7Unexpected situations are dealt with safely and with the approval of relevant person/s
  • 2.8Quality checks of the installed aerial communication cables are conducted in accordance with workplace procedures
  • 2.9Cable installation is carried out efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices

3 Document and verify cabling installation

  • 3.1WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2Worksite is cleaned and made safe in accordance with workplace procedures
  • 3.3Documenting cable installation is carried out in accordance with workplace procedures

Performance evidence

  • reading and interpreting drawings related to cable schedules and routes
  • installing catenary cables correctly
  • attaching communications cable to catenary without damage
  • protecting cable ends
  • completing the necessary documentation accurately
  • dealing with unplanned events
  • applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures
  • carrying out cable installation efficiently without waste of materials or damage to apparatus, circuits or the surrounding environment using sustainable energy practices
  • checking poles for soundness
  • documenting and verifying cabling installation
  • installing aerial communication cables
  • obtaining material required for installation
  • obtaining tools, equipment and testing devices and checking for correct operation and safety
  • planning cable routes in accordance with precinct, structure, significants and relevant industry standards
  • preparing to install aerial communication cables
  • quality checking the installed aerial communication cables

Knowledge evidence

  • telecommunication aerial cabling requirements and techniques, safe working practices and relevant standards, codes and regulations, including:
  • hazards and control measures in aerial cabling working environment encompassing:
  • risk management and assessment of risk:
  • principle and purpose of risk management
  • processes for conducting a risk assessment
  • hazards associated with low voltage (LV), extra-low voltage (ELV) and high currents encompassing:
  • parts of an electronic systems and equipment that operate at LV and ELV
  • parts of an electronic systems and equipment where high currents are likely
  • risks and control measures associated with high voltage (HV) encompassing:
  • parts of an electronic systems and equipment that operate at HV
  • the terms ‘touch voltage’, ‘step voltage’, ‘induced voltage’ and ‘creepage’ as they relate to the hazards of HV
  • control measures used for dealing with the hazards of HV
  • risks and control measures associated with LV encompassing:
  • risks associated with installation, fault finding, maintenance and repair
  • control measures before, while and after working on electronic systems or equipment
  • isolation and tagging-off procedures
  • risks and restrictions in working live
  • control measures for working live
  • risks and control measures associated with working on aerial cables encompassing:
  • soundness of pole for aerial cabling
  • use of aerial safety equipment
  • procedure to apply pole top rescue
  • aerial construction methods and regulations
  • joining aerial cables
  • problem-solving techniques
  • relevant manufacturer specifications and operating instructions
  • relevant tools, equipment and testing devices
  • relevant workplace documentation
  • relevant workplace quality, policies and procedures
  • sustainable energy practices

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEEDV0002

What does an assessment tool for UEEDV0002 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEDV0002 needs to address all 68 unit components: 3 elements with 22 performance criteria, 16 performance evidence requirements, 30 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEEDV0002?

Auditori pulls the current release of UEEDV0002 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEDV0002 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEEDV0002 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEDV0002, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEEDV0002 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEEDV0002 free