TLIX0031XProvide maintenance engineering support in a defence integrated logistics environment

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for TLIX0031X must cover

45 assessable components: 2 elements (12 performance criteria), 8 performance evidence and 25 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Determine the maintenance support requirements of an asset

  • 1.1ILS strategy for the program is reviewed to ensure relevance and alignment of maintenance engineering
  • 1.2Organisational support policy is accessed, interpreted and applied to maintenance support, logistics support analysis (LSA) strategy and ILS planning
  • 1.3Maintenance support performance metrics, requirements and specifications are developed in accordance with organisational policy
  • 1.4Data required to develop functional maintenance support requirements for the identified asset is gathered and analysed
  • 1.5Improvement, standardisation, technological and other risk mitigation opportunities are identified and analysed to inform asset and support system design changes
  • 1.6Maintenance requirements determination (MRD) is conducted to identify physical maintenance support requirements
  • 1.7Usage upkeep cycle and class maintenance plan is developed to sustain the asset over life
  • 1.8Maintenance management system requirements are identified

2 Design and develop physical maintenance requirements to support the operating intent of the asset

  • 2.1Maintenance task analysis is conducted to determine the physical elements associated with each preventative and corrective maintenance task
  • 2.2Maintenance records are developed, loaded and data maintained within the materiel maintenance management information system
  • 2.3Technical data is developed and/or validated
  • 2.4Verification and validation activities and maintenance support assessments are planned and conducted to confirm the achievement of maintenance support objectives

Performance evidence

  • reviewing integrated logistics support (ILS) strategy for the program to ensure relevance and alignment of maintenance engineering
  • accessing and interpreting the organisational support policy and applying it to maintenance support, logistics support analysis (LSA) strategy and ILS planning
  • working as part of the ILS team, planning and conducting maintenance engineering tasks, including:
  • during the concepts, requirements determination and design phases of a materiel system
  • during the design and development phases of a support system
  • throughout the in-service and disposal phases of a materiel system
  • determining the functional maintenance support requirements of an asset
  • designing, developing and delivering the physical maintenance support outputs that enable maintenance services to ensure the materiel system retains its technical integrity throughout its intended life.

Knowledge evidence

  • organisational policies and procedures relevant to ILS
  • organisational policies and strategies relevant to maintenance engineering
  • industry standards relevant to ILS and maintenance engineering
  • LSA processes and the application of LSA data, including failure mode, effects and criticality analysis (FMECA), level of repair analysis (LORA), reliability, availability and maintainability (RAM) and reliability-centred maintenance (RCM)
  • techniques to develop understanding of the proposed system
  • techniques to develop functional maintenance support requirements and translating these into physical support outputs and ILS outcomes
  • techniques to identify improvements, standardisation, technological and other risk mitigation opportunities to inform asset and support system design changes to improve support system outcomes or reduce life cycle costs
  • physical elements associated with each maintenance task, including:
  • skills, knowledge and attributes – trade performance requirements
  • maintenance procedures and processes (safety issues, hazards and associated human factors considerations)
  • general and specialist tools and test equipment
  • facility requirements (at each level of repair)
  • repair parts, rotable items and consumables
  • packaging, handling, storage and transportation (PHS&T) requirements for all items of supply
  • conducting an economic LORA and amending support strategy and plans
  • populating the logistics support analysis record (LSAR)
  • processes and information required to prepare outline plans and high-level costings
  • maintenance engineering concepts and practices
  • organisational maintenance management systems
  • maintenance engineering budget forecast
  • techniques to plan engineering maintenance related to human resource complements
  • techniques to plan and conduct verification and validation activities and maintenance support assessments to confirm the achievement of maintenance support objectives, including:
  • acceptance test and verification plans and reports
  • maintenance evaluations
  • operational test and evaluation support.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing TLIX0031X

What does an assessment tool for TLIX0031X need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLIX0031X needs to address all 45 unit components: 2 elements with 12 performance criteria, 8 performance evidence requirements, 25 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for TLIX0031X?

Auditori pulls the current release of TLIX0031X from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLIX0031X — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing TLIX0031X assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLIX0031X, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your TLIX0031X assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate TLIX0031X free