TLIC3034Berth and shut down an electric tram

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for TLIC3034 must cover

35 assessable components: 5 elements (17 performance criteria), 9 performance evidence and 9 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Determine berthing location

  • 1.1Contact is made with tram controller and depot staff, or information is obtained from an information board, to determine planned location for berthing tram
  • 1.2Directions of tram controller and depot staff are interpreted and followed

2 Berth and shut down an electric tram

  • 2.1Hazards are identified, risks are assessed and risk control measures implemented
  • 2.2Electric tram is berthed in accordance with workplace and site requirements
  • 2.3Shutdown procedures are carried out in accordance with specifications and workplace requirements

3 Carry out post-operational checks

  • 3.1Visual and other checks are made of tram in accordance with workplace procedures
  • 3.2Identified faults and defects are fixed or reported and recorded in accordance with workplace procedures
  • 3.3Faulty and defective equipment that presents a safety risk is reported in accordance with workplace procedures and relevant regulations
  • 3.4Outcomes of post-operational checks are recorded in accordance with workplace procedures

4 Secure an electric tram

  • 4.1Brakes are applied in accordance with workplace procedures
  • 4.2Electric tram is secured in accordance with depot requirements

5 Complete post-operational paperwork

  • 5.1Timesheet or other work record is completed
  • 5.2Roster is checked for future work allocation
  • 5.3Issues and variations are discussed and resolved with roster clerk
  • 5.4All required documentation is completed in accordance with workplace procedures
  • 5.5All equipment is returned and stowed in accordance with workplace requirements
  • 5.6Electric tram records are completed in accordance with workplace procedures and regulatory requirements

Performance evidence

  • adapting to differences in trams and associated equipment and procedures
  • communicating effectively and working collaboratively with others
  • conducting a visual inspection of an electric tram
  • identifying job hazards and taking required actions to minimise, control or eliminate identified hazards
  • interpreting and following operational instructions and prioritising work
  • modifying activities depending on operational contingencies, risk situations and environments
  • reading and interpreting relevant instructions, procedures and information
  • recognising problems that may arise and taking appropriate actions
  • shutting down an electric tram after service

Knowledge evidence

  • applicable state/territory legislated rail safety requirements, relevant codes of practice and/or guidelines
  • electric tram controls, instruments and indicators and their purpose, location and use
  • monitoring devices, braking and power equipment, safety systems, ancillary systems and signalling systems
  • operating controls to start, accelerate, decelerate and stop an electric tram
  • speed and load limit compliance requirements
  • state/territory road and traffic authority and tramway operating procedures
  • typical defects that can occur on an electric tram and related actions that should be taken
  • work health and safety (WHS)/occupational health and safety (OHS) and environmental procedures and regulations
  • workplace procedures for: completing relevant documentation when berthing and shutting down an electric tram; electric tram braking and safety system procedures; emergency response procedures; end of journey checks; identifying equipment defects and assessing for appropriate actions; managing hazardous situations; operating and shutting down ancillary systems; operating electronic communications equipment; operating, berthing and shutting down an electric tram

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing TLIC3034

What does an assessment tool for TLIC3034 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for TLIC3034 needs to address all 35 unit components: 5 elements with 17 performance criteria, 9 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for TLIC3034?

Auditori pulls the current release of TLIC3034 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for TLIC3034 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing TLIC3034 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of TLIC3034, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your TLIC3034 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate TLIC3034 free