RIIOGD401E — Rig up, conduct pre-spud operations and rig down
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for RIIOGD401E must cover
66 assessable components: 5 elements (27 performance criteria), 20 performance evidence and 18 knowledge evidence requirements, plus 1 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1. Prepare to rig up, conduct pre-spud operations and rig down
- 1.1Obtain, interpret and confirm work requirements
- 1.2Access, interpret and apply documentation required to rig up, conduct pre-spud operations and rig down and confirm work activity is compliant
- 1.3Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
- 1.4Select and wear personal protective equipment required for work activities
- 1.5Communicate with other personnel at site according to work requirements and confirm briefings and handover details are communicated and received
- 1.6Carry out pre rig-up procedure inspections within scope of own role
- 1.7Coordinate movement of load and sequence of installation and location
- 1.8Check equipment for damage and loss by moving contractor and report and BI
2. Rig up to spud
- 2.1Receive and action rig manager authorisation to commence rig-up to spud operations
- 2.2Receive detailed verbal and written instructions on use and type of mud from the operator and distribute
- 2.3Identify potential rig-up problems and take corrective action as required
- 2.4Keep rig manager informed of operations
3. Prepare for drilling of surface hole/subsea hole
- 3.1Check drilling and hoist equipment, report any damage to rig manager and record
- 3.2Conduct equipment checks for nippling- up or cross-checked with relevant procedures
- 3.3Check handling equipment for correct sizing and confirm fit for purpose
- 3.4Confirm availability of and inspect, clean, calibrate and record tubulars according to manufacturer specifications
- 3.5Check well control equipment according to manufacturer specifications
- 3.6Identify special tool requirements and check if fit for purpose and approved for use
4. Prepare for pre-spud operations
- 4.1Lock rod racks with drill rod and position drill collars
- 4.2Inspect casing running tools for safety and fitness- for-purpose and rectify and report faults and malfunctions as required
- 4.3Record casing tallies and report
5. Conduct operations as per drilling program
- 5.1Determine optimum circulating and penetration rates and check deviations are in accordance with operators drilling program
- 5.2Check mud cleaning equipment and screens for integrity and correct operation according to workplace procedures
- 5.3Check drilling fluid quantities with sufficient being in reserve to kill well and keep hole on full trip
- 5.4Record mud properties on tour report
- 5.5Operate all equipment according to manufacturer specifications and company procedures
- 5.6Maintain a sound working relationship with third party contractors
Performance evidence
- rig-up, conduct pre-spud operations and rig down on at least two occasions, including:
- identifying potential rig-up problems
- checking drilling and hoist equipment
- determining optimum circulating and penetration rates and checking deviations
- receiving and actioning authorisation to commence drilling
- identifying potential rig-down operations
- carrying out supervision of rig up, pre-spud and rig down operations that meets required outcomes.
- locate and apply required documentation, policies and procedures
- implement the requirements, procedures and techniques to rig up, conduct pre-spud operations and rig down, including:
- identifying, addressing and reporting potential hazards and risks
- checking equipment for damage and loss by the moving contractor and reporting as required
- preventing usage of damaged equipment as required
- identifying, addressing and reporting environmental issues
- work with others to plan, prepare and conduct rig up, pre-spud and rig down operations to meet required outcomes, including:
- resolving coordination requirements with others at the site prior to commencing and during work activities
- carrying out pre rig-up procedure inspections within scope of own role
- coordinating movement of load and sequence of installation and location according to rig movement plan
- preparing for and organising work activities to meet task requirements
- communicating with others to receive and clarify work instructions
- using a range of communication techniques and aids to advise others of work activity and exclusion zones.
Knowledge evidence
- key legislation required for rigging up, conducting pre-spud operations and rigging down
- key policies, procedures and established requirements for rigging up, conducting pre-spud operations and rigging down, including those for:
- identifying and managing risks
- identifying, addressing and reporting environmental issues
- setting up work activity
- site isolation, signage and erecting barriers
- work health and safety
- selecting all plant, tools and equipment to carry out tasks and checking for faults
- carrying out work to specifications
- communication techniques relevant to work activities
- troubleshoot during drilling program
- carrying out calculations, including:
- quantities
- up-hole velocity
- specific gravity
- volume
- hydrostatic pressures
- optimum circulating and penetration rates.
Foundation skills
- Reading: Identifies and interprets complex information from workplace procedures, documentation and regulations
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing RIIOGD401E
What does an assessment tool for RIIOGD401E need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIIOGD401E needs to address all 66 unit components: 5 elements with 27 performance criteria, 20 performance evidence requirements, 18 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for RIIOGD401E?
Auditori pulls the current release of RIIOGD401E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIIOGD401E — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing RIIOGD401E assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIIOGD401E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- RIIOGD202E — Carry out equipment and basic rig maintenance procedures
- RIIOGD203F — Prepare and operate drilling fluid systems
- RIIOGD204F — Perform rig floor operations
- RIIOGD205E — Support blow out prevention operations
- RIIOGD206E — Assist and monitor well control operations
- RIIOGD209F — Operate and maintain ancillary equipment
- RIIOGD301E — Conduct and maintain derrick operations
- RIIOGD302F — Assist in running casing
- RIIOGD303F — Trip pipe
- RIIOGD304D — Apply effective coal seam gas control practices
- RIIOGD305E — Apply blow out prevention operational procedures
- RIIOGD402E — Participate in nippling-up and pressure tests
Your RIIOGD401E assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate RIIOGD401E free