MEM10023Design and connect control switching of circuits for building services and industrial equipment

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for MEM10023 must cover

41 assessable components: 3 elements (14 performance criteria), 14 performance evidence and 13 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Determine job requirements

  • 1.1Follow standard operating procedures (SOPs)
  • 1.2Comply with work health and safety (WHS) requirements at all times, including appropriate risk control measures
  • 1.3Use appropriate personal protective equipment (PPE) in accordance with SOPs
  • 1.4Identify job requirements from specifications, drawings, job sheets or work instructions

2 Design control switching of circuits

  • 2.1Design agreed control switching of circuits to comply with specifications and regulatory requirements
  • 2.2Document agreed design of control circuits in accordance with procedures
  • 2.3Obtain the necessary tools, equipment, test instruments and materials needed to connect the control circuits

3 Connect control switching of circuits

  • 3.1Isolate and tag circuits and equipment in accordance with procedures, where required
  • 3.2Terminate and connect control circuit components to comply with the design and regulatory requirements
  • 3.3Functional test control circuit operation to ensure compliance with agreed design
  • 3.4Rectify any non-compliances and re-test to meet requirements
  • 3.5Terminate and connect control circuits
  • 3.6Test control circuits to ensure functionality
  • 3.7Document control circuits in accordance with SOPs

Performance evidence

  • following work instructions, standard operating procedures (SOPs) and safe work practices
  • identifying and interpreting circuits, drawings, plans and specifications relevant to the work to be undertaken
  • determining the electrical and non-electrical isolation requirements to prevent the creation of hazards linked from the loss of machine/system/process control according to established procedures
  • using lock out tag procedures with appropriate tags/signs
  • proving electrical isolation and following established safety rules prior to working on electrical equipment or wiring
  • ensuring all electrical equipment and tools are tested and tagged and are up to date
  • developing according to specifications at least five (5) or more of the following control circuit designs: - multiple light switching circuit - master control circuit - local start-stop control and with electrical interlocking - connecting a timer in a controlled circuit - a multiple motor starting circuit which incorporates start, stop and jog control - machine safety circuit - line conditioners - inverters - uninterrupted power supplies (UPS) - energy management systems
  • terminating and connecting to comply with the above selected control circuit scenarios and regulatory requirements at least five (5) or more of the following control circuit devices: - multi-way switches - switches with more than two positions and Off - push buttons - electromechanical relays - programmable relays - contactors - motor reversing contactors - three-phase starters - reduced voltage starters - transducers/sensors, including: - limit, proximity, float and pressure switches - photoelectric cells - light and temperature sensors
  • programming timers and using the monitoring facility of the programmable relay to verify the values of the timer
  • testing connected control circuit devices as against agreed design and rectifying any non-compliant functions
  • complying with the Australian/New Zealand Wiring Rules and local supply requirements for three-phase motor installations and starters
  • testing control circuits to ensure functionality
  • using test equipment to locate faults, completing remedial action and retesting to ensure compliance
  • documenting connected control circuits in accordance with SOPs

Knowledge evidence

  • safe work practices and procedures and use of personal protective equipment (PPE)
  • electrical drawings – conventions in linework, symbols used in electrical circuit diagrams, placement and arrangement of circuit components
  • drawing schematic circuit diagrams complying with Australian Drawing Standard AS/NZS 1102.101-1989 Graphical symbols for electrotechnical documentation – General information and general index, and converting to wiring diagrams
  • construction and operation of contactors and relays with various types of contacts, including: - normally open - normally closed - timed on closing - timed in opening - timed in both closing and opening
  • drawing contactors in circuits and drawing conventions applied
  • control diagrams drawn as ladder diagrams where the ladder stiles are the supply lines and the ladder rungs are the various circuit lines
  • control circuit variations, including: - two-position control - local or remote operation - two-wire control - two-wire and push button control where extra start push-buttons are all placed in parallel and where extra stop push-buttons are placed in series - reversing circuits – use of mechanical and electrical interlocks - jogging control
  • common control devices used in circuits, including: - multi-way switches - switches with more than two positions and Off - push buttons - electromechanical relays - programmable relays - contactors - motor reversing contactors - three-phase starters - reduced voltage starters - transducers/sensors, including: - limit, proximity, float and pressure switches - photoelectric cells - light and temperature sensors
  • programmable timers, including specifications to be met and functions to be controlled including machine operation or process output
  • line conditioners and the purpose they provide
  • inverters and the purpose they provide
  • energy management systems and the purpose they provide
  • static electricity discharge or electrostatic discharge and the hazards associated and the precautions to be taken

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing MEM10023

What does an assessment tool for MEM10023 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for MEM10023 needs to address all 41 unit components: 3 elements with 14 performance criteria, 14 performance evidence requirements, 13 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for MEM10023?

Auditori pulls the current release of MEM10023 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for MEM10023 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing MEM10023 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of MEM10023, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your MEM10023 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate MEM10023 free