MARH028 — Conduct dynamic positioning operations
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for MARH028 must cover
80 assessable components: 5 elements (30 performance criteria), 30 performance evidence and 20 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan dynamic positioning operations
- 1.1Vessel plans, specifications, capability diagrams, related documentation and data are analysed to assess the capability of the vessel to complete and conduct dynamic positioning operations
- 1.2Risk assessment is conducted, levels of redundancy are determined and are appropriate for proposed operations
- 1.3Contingency plans are developed to address risks of system failure and operational requirements are appropriate
- 1.4Dynamic positioning watchkeeping procedures are organised in accordance with workplace procedures and operational plans
- 1.5Regulatory and legislative requirements are complied with in accordance with workplace procedures and operational plans
2 Set up dynamic positioning operations
- 2.1Vessel is checked to ensure that it is on dynamic positioning in accordance with the vessel’s class, vessel’s operation manual, procedures and checklists
- 2.2Alarms and warning limits are determined and set to meet organisational requirements
- 2.3Position reference systems for dynamic positioning operations are determined and selected to meet operational requirements
- 2.4Position reference systems are determined and selected in accordance with dynamic positioning class
- 2.5Thruster allocation is determined and selected to meet operational requirements and weather conditions
- 2.6Vessel’s manoeuvring capability is tested
- 2.7Safe position and minimum distances are determined to ensure vessel is stabilised in dynamic positioning
- 2.8Clearance for dynamic positioning operations is obtained
- 2.9Set-up, location and change of watch checklists and task-specific checklists are completed in accordance with workplace procedures
3 Monitor dynamic positioning operations
- 3.1Data from dynamic positioning system is monitored to ensure vessel positioning is maintained in accordance with operational plans and procedures
- 3.2Performance checks of dynamic positioning systems are carried out according to operational procedures
- 3.3Information obtained from dynamic positioning system is interpreted and analysed taking into account limitations of equipment, prevailing circumstances and conditions
- 3.4Alarms and warning lights are responded to within required time constraints and dynamic positioning is maintained
- 3.5Situational awareness of the vessel’s status, operation and impact of operating under dynamic positioning is maintained
- 3.6Lookout and awareness of the external situation, including weather when controlling a vessel close to installations or other objects, is maintained
- 3.7Vessel positioning manoeuvres and station keeping functions are carried out in accordance with operational plans and procedures
- 3.8Movement of vessel and changes in the position and heading are monitored and safe excursion limits are maintained
- 3.9Vessel is transferred from manual joystick to dynamic positioning control in accordance with workplace procedures
- 3.10Clear communication during dynamic positioning operations is maintained, and clarification is sought from, or given to, other team members when information or instructions are not clearly understood
- 3.11Logbooks and records are maintained during dynamic positioning operations in accordance with organisational procedures
4 Conduct dynamic positioning watchkeeping handover
- 4.1Handover and relief of dynamic positioning operator is completed according to organisational procedures and safe working practices
- 4.2Warning and alarm messages their content and information are communicated clearly and accurately during handover process and evaluated by dynamic positioning operator
5 Respond to emergency situations
- 5.1Nature of emergency and level of urgency are identified promptly and actions taken in accordance with organisational procedures
- 5.2Conditions and factors of system failure and degraded operations are determined, evaluated and communicated
- 5.3Vessel position and heading are stabilised, and actions appropriate to the urgency of the situation and nature of emergency are carried out in accordance with contingency plans
Performance evidence
- communicating with personnel using closed-loop communications during dynamic positioning operations and task-specific communications in accordance with International Marine Contractors Association (IMCA) 103
- completing 480 hours of supervised Dynamic Positioning Operators ‘watchkeeping time’ on a DP2 or DP3 system, including completion of a task/record book, signed off by a qualified Dynamic Positioning Operator and validated by the vessel’s Master
- communicating clearly and accurately information and content from warnings and alarm messages
- conducting appropriate watch handover procedures, including: • completing relevant checklists • dynamic positioning status • field operations • status board • vessel operations • vessel status • weather forecasts
- conducting dynamic positioning watch in a formal and clear manner
- determining limitations of vessel movement when having equipment or divers deployed
- determining the dynamic positioning status and recent occurrences which may have an effect on the dynamic positioning operation during the watch
- developing contingency plans to include escape routes, position reference failures, sensors, weather, power, propulsion and worst case failure
- effective completion of set-up/location and change of watch checklists and task-specific checklists as required
- evaluating the consequences of each alarm and possibility to continue the operation
- evaluating the various factors to be taken into account subsequent to any system failure, determining and carrying out appropriate actions, including: • changing dynamic positioning status • communicating with personnel • monitoring stability of position and heading • when to terminate work
- interpreting visual indicators and indicating conditions which may result in malfunction of dynamic positioning
- maintaining logbooks and records, including: • fault logs • IMCA incident report form • position reference systems logs
- making appropriate decisions and taking actions relating to the continuance or abandonment of the operation
- monitoring changes in distance/heading between object and own vessel
- monitoring movement of object, installation or target
- monitoring vessel movement when having equipment or divers deployed
- operating position reference systems, sensors and peripheral equipment associated with the dynamic positioning system
- organising dynamic positioning watchkeeping procedures to ensure manning of dynamic positioning console, maintaining lookout, using internal and external communications, and observing safe working practices
- organising manning of dynamic positioning console, maintaining lookout, using internal and external communications and observing safe working practices
- recognising the conditions with thrusters, sensors, position references, power, environment and miscellaneous that degrade operational or emergency status
- recognising the warnings and alarms associated with degrading operational or emergency status
- setting up and operating the dynamic positioning system under various control modes to carry out manual, mixed manual and automatic, and fully automatic manoeuvres
- stabilising the vessel position and heading subsequent to a variety of system failures
- updating the ongoing operation and planned operational activities during handover
- using critical activity mode of operation (CAMO) and task appropriate mode (TAM) table to determine which mode dynamic positioning system is operating in as part of risk assessment
- using dynamic positioning alert table or activity specific operating guidelines (ASOG) to trigger a change of status and action to determine level of redundancy
- using failure modes and effective analysis (FMEA) to evaluate a vessel’s capability to carry out a given operation
- using procedures to transfer from manual joystick to dynamic positioning control taking into consideration speed, distance, drift test, location of surface and sub-sea structures, drift-on/drift-off, testing manual control, independent joystick control, current/tide changes, weather forecasts, worst case failure testing and testing of dynamic positioning alert status system
- verifying vessel’s position or movement and status during handover
Knowledge evidence
- ASOG
- closed-loop communications during dynamic positioning operations and task-specific communications in accordance with IMCA 103
- conditions that will cause degraded operational status and emergency status, including the impact of: • environmental conditions • position referencing • power • sensors • thrusters
- contingency planning, including: • escape routes • positioning reference failures • propulsion • sensors • weather • worst case failure
- corrective actions to be taken when responding to a system failure, including: • changing dynamic positioning status • communication with team members and escalation of communication to Bridge Master • monitoring stability of position and heading • terminating work
- documentation and records for dynamic positioning operations, including: • annual trials reports • ASOG • CAMO • capability plots • capability plots (paper and electronic) • dynamic positioning manuals • FMEA • footprint plots • logbooks for all dynamic positioning operations, failures and incidents • operation, maintenance and repairs of dynamic positioning equipment and ancillary equipment • TAM • worksite diagrams
- environmental conditions, including: • changes to environmental conditions • impact of changes in environmental conditions on operations
- factors to be taken into consideration in the event of system failure
- factors to be taken into consideration when transferring from manual/joystick to dynamic positioning control, including: • current/tide changes • distance • drift test • drift-on/drift-off • independent joystick control • location of surface and sub-sea structures • speed • testing manual control • testing of the dynamic positioning alert status system • weather forecasts • worst case failure testing
- failure modes of position reference systems, including: • Artemis • differential global navigation satellite system (DGNSS) • frequency-modulated continuous wave (FMCW) radar and laser-based systems • hydro-acoustic • inertial navigation system (INS) and taut wire
- failure modes of sensors, including: • draught input sensor • gyro compass • motion reference unit • vertical reference sensor/unit • wind sensor (anemometer)
- planning dynamic positioning operations, including: • ASOG • CAMO • contingency situations • emergency situations • TAM
- position reference systems commonly associated with dynamic positioning installations, including: • Artemis • DGNSS • FMCW radar • hydro acoustic • INS and taut wire • laser-based systems
- procedures to stabilise the vessel position and heading subsequent to a variety of system failures, including: • loss of all position reference system, entering move into dynamic positioning system when in dead reckoning (DR) mode • movement of position reference systems • setpoint/feedback offset • thruster fail to max pitch • worst case failure
- risk assessments and levels of redundancy
- use of operational plans to conduct vessel positioning manoeuvres and station keeping functions
- vessel plans and specifications, capability diagrams and data
- vessel limitations, including: • scope of operations • vessel class • vessel movement when equipment or divers are deployed
- warnings and alarms, including: • alarms and warnings associated with the impact of: • environmental conditions • position referencing • power • sensors • thrusters • alarm messages • consequence analysis alarm • content and information of warning and alarm messages • escalation of response to alarms and warnings to Bridge Master and other personnel • time constraints • warnings and alarms associated with: • catastrophic failure • incorrect operation of the dynamic positioning system and maintaining position
- workplace procedures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing MARH028
What does an assessment tool for MARH028 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for MARH028 needs to address all 80 unit components: 5 elements with 30 performance criteria, 30 performance evidence requirements, 20 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for MARH028?
Auditori pulls the current release of MARH028 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for MARH028 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing MARH028 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of MARH028, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- MARH013 — Plan and navigate a passage for a vessel up to 12 metres
- MARH014 — Apply weather information when navigating inland waters as Master
- MARH017 — Use wheelhouse equipment for safe navigation
- MARH018 — Apply command navigation procedures on vessels limited by tonnage or near coastal operations
- MARH019 — Forecast weather and oceanographic conditions
- MARH020 — Forecast weather and oceanographic conditions to plan a safe passage
- MARH021 — Manage the navigation of a vessel
- MARH022 — Plan and conduct a passage and determine position
- MARH023 — Use of electronic chart display and information system (ECDIS) to maintain the safety of navigation
- MARH024 — Use of radar and other bridge equipment to maintain safety of navigation
- MARH025 — Apply knowledge of dynamic positioning fundamentals
- MARH026 — Apply knowledge of dynamic positioning operations
Your MARH028 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate MARH028 free