CPCCWP5005 — Prepare a scope of works for remedial waterproofing
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCWP5005 must cover
45 assessable components: 3 elements (12 performance criteria), 22 performance evidence and 11 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare.
- 1.1Review design specifications and water ingress report, including drawings, building and structures.
- 1.2Confirm stakeholder’s design brief and expectations, including timelines, finishes, systems and warranty.
- 1.3Confirm relevant regulatory requirements.
- 1.4Liaise with other specialist consultants, including engineers, building surveyors and local councils.
2 Develop scope and specifications.
- 2.1Determine extent of the scope of works, including site conditions, demolition, occupant use, safety, specifications and quality assurance.
- 2.2Develop waterproofing design in line with design brief.
- 2.3Consult with product manufacturers and research appropriate systems in line with design brief.
- 2.4Confirm effectiveness of waterproofing design for compliance and suitability with site conditions in accordance with National Construction Code (NCC) performance requirements, Australian Standards and manufacturers’ requirements.
3 Document scope of works and specifications.
- 3.1Write scope of works to include establishment of site, roles and responsibilities, safety, stages, statutory requirements and site hand-over.
- 3.2Document the system specifications in accordance with manufacturers’ requirements.
- 3.3Document hold points and other quality assurance requirements.
- 3.4Communicate scope of works and specifications to stakeholders.
Performance evidence
- Prepare and document three (3) scopes of work and specifications for three (3) diagnostic reports provided, chosen from list provided:
- one investigation and report from an internal wet area which includes a shower
- one investigation and report of water ingress through: an external wall, adjacent to a waterproofed balcony or deck; OR water ingress below a concrete roof terrace
- one investigation and report of water ingress below a waterproofed, lightweight, flat roof structure or balcony
- one investigation and report of water ingress to habitable space below ground.
- In doing so, the scopes of work and specifications must include at least two (2) alternative system specifications for one (1) of the scopes of work.
- Scope of works must also include:
- project aims
- references to regulatory and Australian Standards requirements
- quality assurance requirements
- environmental considerations
- extent of demolition
- roles and responsibilities
- sequence of construction stages
- hours of work
- safety
- rubbish removal
- availability of services
- finishes
- re-instatement works
- protection works
- latent conditions.
Knowledge evidence
- contributing site factors, including: water ingress sources, surface water pathways, sub-surface water pathways, properties of water and moisture movement, gradient or falls, hydrostatic pressure, surface tension of finishes, capillarity, size and effectiveness of outfalls, service and fixing penetrations, entry thresholds and openings
- building elements and integration, including: principles of water capture, direction and shedding, relationship between structural components, building movement, wind loadings, construction materials and their properties
- inspection and testing protocols utilising factors and influences in accordance with risk levels, including: curing times and stages, stage inspections or hold points, observation procedures, establishing control areas and reference points, non-destructive investigation procedures, destructive investigation procedures, utilising information from other sources, e.g., hydraulic and drainage reports, Bureau of Meteorology (BOM) observations
- setting control parameters and testing methods, including: selection of appropriate test method, calibration of testing equipment, effects on testing equipment by site conditions and testing procedures
- National Construction Code (NCC) performance requirements relevant to areas tested, including: waterproofing, weather proofing, damp proofing, condensation management
- NCC evidence of suitability in relation to waterproofing system performance, including: independent test reports, CodeMark Australia, other independent testing organisations
- Australian Standards and design requirements relevant to areas inspected
- waterproofing system manufacturers’ requirements, including: data sheets and specifications, installation method statements, performance of system according to service conditions, suitability of materials as fit for purpose, compatibility of components within the system
- properties of waterproofing systems available: substrate assessment and preparation, combining components to form a system, component compatibility in a combined system, component properties for site conditions, component installation practices, system analysis for effectiveness
- report content and communication of findings: types of diagnostic reports and structures, including: issue, performance standard, remedial action required, tables and diagrams, photographic evidence, thermal imaging analysis, interpreting measurement values, references to Australian Standards and designs, verbal communication strategies, different audiences, presenting evidence
- stakeholders: architect, engineer, builder, building owner, consumer, design team, construction team, certifier, building surveyor, regulators
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCWP5005
What does an assessment tool for CPCCWP5005 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCWP5005 needs to address all 45 unit components: 3 elements with 12 performance criteria, 22 performance evidence requirements, 11 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCWP5005?
Auditori pulls the current release of CPCCWP5005 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCWP5005 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCWP5005 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCWP5005, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCWP2001 — Handle waterproofing materials and components
- CPCCWP2002 — Use waterproofing tools and equipment
- CPCCWP2004 — Prepare surfaces for waterproofing application
- CPCCWP3001 — Apply waterproofing system to below ground level wet areas
- CPCCWP3002 — Apply waterproofing process to internal wet areas
- CPCCWP3003 — Apply waterproofing process to external above-ground wet areas
- CPCCWP3004 — Apply waterproofing remedial processes
- CPCCWP3005 — Assess construction waterproofing processes
- CPCCWP5001 — Design below ground waterproofing
- CPCCWP5002 — Design external above ground waterproofing
- CPCCWP5003 — Design waterproofing to internal wet area
- CPCCWP5004 — Determine origin of water and moisture ingress into buildings
Your CPCCWP5005 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCWP5005 free