CPCCST3016 — Build solid stonemasonry walls
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCST3016 must cover
68 assessable components: 5 elements (28 performance criteria), 4 performance evidence and 36 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare
- 1.1Read, interpret and apply solid stonemasonry wall construction requirements from current plans, specifications, standards and codes.
- 1.2Follow relevant information from workplace procedures, workplace safety and environmental documentation.
- 1.3Use measurements and formulas to calculate material quantities.
- 1.4Determine job priorities and sequence job tasks in consultation with others on site.
- 1.5Identify potential hazards and determine and implement control measures.
- 1.6Select and check condition of plant, equipment and tools and report damage or malfunction to relevant person.
- 1.7Check conformity of materials against the specifications and place materials in proximity of the work.
2 Set out stonework
- 2.1Select, fit correctly and use personal protective equipment (PPE) appropriate for job.
- 2.2Identify structural details, loadbearing stonework and piers for stonework construction.
- 2.3Establish finish heights and levels from datum and set out and mark base stonework.
- 2.4Set out stonework gauge and bond.
- 2.5Set out and mark load bearing stonework, damp proof course (DPC), flashing, ventilation, vermin proofing and ant capping.
- 2.6Set out door and window positions to suit gauge and bond.
3 Construct solid masonry walls
- 3.1Mix mortar to colour and consistency of job requirements.
- 3.2Lay base stones and construct to set out position and to level and bond.
- 3.3Construct sold stonemasonry walls straight, level and plumb to allowable tolerances and with required wall ties.
- 3.4Install DPC, flashings, weep holes and ventilation to comply with standards and codes.
- 3.5Set out, erect, stabilise and brace work platform to workplace safety requirements.
- 3.6Construct window and door openings and install flashings.
- 3.7Install lintels and head flashings.
- 3.8Install roof tie down to meet specifications and standards.
- 3.9Set out, cut and lay sill bricks with specified slope and clearances.
4 Finish stonework
- 4.1Remove excess mortar prior to drying.
- 4.2Rake or rule joints to specified profile and depth.
- 4.3Bruch down and clean face stonework.
5 Clean up
- 5.1Clear the work area, and dispose of, reuse or recycle materials following workplace and environmental requirements.
- 5.2Clean tools and equipment, check for serviceability and report damage or faults.
- 5.3Store and secure tools and equipment following workplace procedures.
Performance evidence
- build a minimum 2.1 m long and 2.0 m high solid masonry wall with a minimum of one external or internal corner.
- set out gauge and bond, window and door opening, flashing, weepholes and ventilation
- lay stones level, straight and plumb at corners
- install lintels for opening maintaining gauge and bond.
Knowledge evidence
- characteristics, applications and limitations of materials for building solid masonry walls
- types of natural and manufactured stone used in wall construction:
- limestone
- sandstone
- artificial stone
- autoclaved aerated concrete (AAC)
- processes and techniques for building stonemasonry walls:
- subfloor, wall and roof construction
- damp proofing, flashing and ventilation
- tying components
- lintels and load bearing components
- gable and eaves construction
- construction terminology relating to laying stone
- mortar ingredients and consistency
- stone bond patterns
- types and safe use of lifting equipment
- functional and operational features of plant, equipment and hand and power tools:
- cement mixer
- elevated work platforms (EWP)
- power drills
- air compressor and hoses
- battery operated tools
- workplace processes and procedures
- workplace safety:
- exposure to silica
- job safety and environmental analysis (JSEA)
- hazardous manual tasks
- working at heights
- exposure to loud noise
- working drawings and specifications
- material protection and storage
- environmental requirements for workplace processes and waste disposal
- sustainability principles
- construction standards, codes and regulations
- key requirements of the National Construction Code (NCC) relevant to solid masonry walls
- digital technology to source information and communicate with others.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCST3016
What does an assessment tool for CPCCST3016 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCST3016 needs to address all 68 unit components: 5 elements with 28 performance criteria, 4 performance evidence requirements, 36 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCST3016?
Auditori pulls the current release of CPCCST3016 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCST3016 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCST3016 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCST3016, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCST2001 — Prepare for stonemasonry construction process
- CPCCST2003 — Finish stone
- CPCCST2004 — Lay stone
- CPCCST2005 — Carry out load slinging of off-site materials
- CPCCST2006 — Identify and use stone products
- CPCCST2007 — Use stonemasonry tools, plant and equipment
- CPCCST3001 — Dress and mould stone
- CPCCST3002 — Shape solid stone
- CPCCST3003 — Spilt stone manually
- CPCCST3004 — Dress stone manually
- CPCCST3006 — Machine stone
- CPCCST3007 — Turn stone
Your CPCCST3016 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCST3016 free