What an assessment for CPCCRI3013 must cover
87 assessable components: 6 elements (23 performance criteria), 3 performance evidence and 61 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to perform intermediate rigging.
- 1.1Interpret work instructions and associated documentation and clarify requirements with relevant persons.
- 1.2Plan all work to comply with relevant legislation, regulations, standards, codes, work health and safety, environmental and workplace requirements.
- 1.3Erect required safety signage and barricades and select and fit personal protective equipment (PPE) appropriate for work activities.
2 Select and check intermediate rigging equipment.
- 2.1Select resources, materials and equipment in accordance with load charts, and inspect for compliance with work instructions.
- 2.2Inspect lifting equipment in accordance with manufacturer and workplace requirements.
- 2.3Label, reject and dispose of any lifting equipment identified as inconsistent with manufacturer requirements, to prevent its use in any circumstance.
- 2.4Determine and select elevated work platforms and other means of mechanical access systems as specified.
- 2.5Install fall arrest equipment with ground level installation.
- 2.6Determine and select personnel cartage systems.
3 Connect intermediate rigging equipment.
- 3.1Calculate and confirm load mass and load distribution.
- 3.2Sling loads to ensure encapsulation of whole load.
- 3.3Sling part loads to ensure full encapsulation of a part load.
- 3.4Sling whole or part loads to protect loads and secure to prevent uncontrolled movement.
- 3.5Attach load steerage lines and use to prevent unnecessary load movement.
4 Move and position loads using intermediate rigging equipment.
- 4.1Determine load lifting/shifting order to minimise necessity for double lifts.
- 4.2Connect lifting/shifting equipment to load.
- 4.3Perform test lift/shift to ensure lift suitability.
- 4.4Move load safely to required destination and secure in position in accordance with work instructions and workplace requirements.
- 4.5Use standard communication signals to coordinate safe movement of load.
5 Remove intermediate rigging equipment.
- 5.1Dismantle lifting/moving equipment and packing, return to resting position and inspect for wear.
- 5.2Complete logbook and site records in accordance with workplace requirements.
6 Clean up.
- 6.1Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
- 6.2Clean, check, maintain and store tools and equipment in accordance with manufacturer and workplace requirements.
Performance evidence
- erecting and dismantling at least one lattice boom crane and fly using correct rigging and slinging techniques
- erecting a multi-point precast tilt-up slab of at least ten tonnes with correct rigging, slinging and de-rigging techniques, including determining lifting points, temporary supports and permanent fixing points from drawings.
- Candidates must apply both single and dual lifting techniques.
Knowledge evidence
- workplace and regulatory requirements for performing intermediate rigging under applicable Commonwealth, state or territory work health and safety (WHS) legislation and codes of practice:
- job safety and environmental analyses (JSEAs)
- safe work method statements (SWMSs)
- safety data sheets (SDSs)
- safety manuals and instructions for plant, tools and equipment
- signage and barricades
- personal protective equipment (PPE)
- working at heights requirements
- environmental and worksite safety plans
- reporting problems
- scope of work for performing intermediate rigging:
- calculations:
- load charts
- fleet angles
- diverter sheaves
- lead loads
- head loads
- load angle factors
- multiple fall
- load share distribution
- precast compliance charts
- safe working loads
- load slinging methods:
- straight sling
- adjustable sling
- reeved sling
- inclined sling
- using lifting techniques, including single and dual lifts
- types, characteristics and limitations of tools and equipment required for performing intermediate rigging:
- chain slings
- flexible steel wire rope (FSWR) slings
- natural or synthetic fibre slings
- lifting devices:
- shackles
- turn buckles
- jacks
- chain winches
- hand-operated creeper winches
- chain blocks
- pulley blocks
- come-alongs
- air winches
- trolleys
- eye bolts
- rigging screws
- lifting lugs
- lifting clutches
- snatch blocks
- load shifting equipment:
- skates
- hydraulic jacks
- winches
- rails
- personnel cartage systems, including man boxes and elevated work platforms
- requirements for using tools, equipment and materials for performing advanced structural steel erection:
- safe operating procedures
- operational, maintenance and basic diagnostic procedures
- workplace and equipment safety requirements
- signalling methods and communications
- processes for completing logbooks and site records
- requirements for cleaning up work area, maintaining and storing plant, tools, equipment and materials, and for environmentally friendly waste management.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCRI3013
What does an assessment tool for CPCCRI3013 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCRI3013 needs to address all 87 unit components: 6 elements with 23 performance criteria, 3 performance evidence requirements, 61 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCRI3013?
Auditori pulls the current release of CPCCRI3013 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCRI3013 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCRI3013 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCRI3013, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
Your CPCCRI3013 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCRI3013 free