What an assessment for CPCCON3055 must cover

37 assessable components: 5 elements (17 performance criteria), 2 performance evidence and 18 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare to install topping slab.

  • 1.1Interpret specifications for topping slab installation and clarify requirements with relevant persons.
  • 1.2Plan work tasks to comply with relevant legislation, regulations, standards, codes, work health and safety (WHS), environmental and workplace requirements.
  • 1.3Select and fit required personal protective equipment (PPE).
  • 1.4Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
  • 1.5Select plant, tools and equipment, check for serviceability and rectify or report any faults.
  • 1.6Calculate and acquire material quantities to meet task specifications and safely locate materials ready for use.

2 Prepare concrete for topping slab.

  • 2.1Consult with relevant persons to determine need for concrete reinforcement and install any required reinforcement in accordance with specifications.
  • 2.2Select and check equipment required to prepare concrete for topping slab.
  • 2.3Scarify existing concrete using appropriate preparation techniques in accordance with specifications.
  • 2.4Clear loose particles and debris from surface to be topped.
  • 2.5Check existing joints in substrate to ensure they are carried through and reflected in proposed topping.

3 Pour topping slab.

  • 3.1Prepare existing concrete surface for topping slab with bonded topping or separation material in accordance with specifications.
  • 3.2Pour topping slab onto existing concrete surface and screed to specifications.

4 Cure and seal topping slab.

  • 4.1Use setting and apply curing agents and techniques to topping slab in accordance with specifications.
  • 4.2Maintain curing and sealing for period stated in specifications.

5 Clean up.

  • 5.1Clear work area and dispose of, reuse or recycle materials in accordance with regulatory and workplace requirements.
  • 5.2Clean, check, maintain and store plant, tools and equipment in accordance with manufacturer and workplace requirements.

Performance evidence

  • bonded topping slabs to two concrete slabs, each measuring at least 10 square metres
  • unbonded topping slabs to two concrete slabs, each measuring at least 10 square metres

Knowledge evidence

  • compliance requirements of legislation, regulations and Australian Standards relevant to topping slab installation:
  • environmental protection and waste disposal
  • material specifications and tolerances
  • work health and safety (WHS)
  • concrete resurfacing materials and techniques:
  • curing duration and effect on ultimate strength
  • role of abrasive blasting when installing bonded topping slabs
  • properties of concrete to be able to minimise waste, delay and faults in installed topping slabs
  • health risks associated with silica dust exposure
  • processes for installing bonded and unbonded topping slabs
  • types and applications of concrete materials used when installing topping slabs
  • types, characteristics, uses and limitations of plant, tools and equipment used when installing topping slabs
  • workplace requirements for installing topping slabs:
  • cleaning up the work area
  • maintaining and storing materials, plant, tools and equipment
  • quality
  • reporting problems
  • safety requirements including personal protective equipment (PPE)

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCCON3055

What does an assessment tool for CPCCON3055 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCON3055 needs to address all 37 unit components: 5 elements with 17 performance criteria, 2 performance evidence requirements, 18 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCCON3055?

Auditori pulls the current release of CPCCON3055 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCON3055 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCCON3055 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCON3055, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCCON3055 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCCON3055 free