UETDRTS035Conduct evaluation of network protection and control system faults

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UETDRTS035 must cover

34 assessable components: 3 elements (19 performance criteria), 6 performance evidence and 9 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to conduct evaluation of network protection and control system faults

  • 1.1Workplace organisational requirements for the evaluation of network protection and control system faults are reviewed and determined
  • 1.2Purpose of the evaluation of network protection and control system faults is established
  • 1.3Testing procedures are discussed and reviewed with appropriate personnel
  • 1.4Testing parameters are established from workplace organisational requirements
  • 1.5Tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
  • 1.6Work is prioritised and sequenced for completion in accordance with workplace requirements
  • 1.7Relevant stakeholders are identified and liaised with
  • 1.8Hazards are identified, risks assessed, and control measures identified
  • 1.9Work permits are organised in accordance with workplace requirements

2 Conduct evaluation of network protection and control system faults

  • 2.1Relevant stakeholder liaison and work permits are applied
  • 2.2Manual handling and use of tools, equipment and PPE are carried out in accordance with workplace requirements
  • 2.3Hazard control measures are applied and monitored in accordance with workplace requirements
  • 2.4Network protection and control system faults are evaluated in accordance with workplace requirements
  • 2.5Network protection and control system faults are tested in accordance with workplace requirements
  • 2.6Solutions to non-routine problems are identified and actioned
  • 2.7Quality checks of work are undertaken in accordance with workplace requirements

3 Complete work and documentation

  • 3.1Completed work is checked for compliance against workplace requirements
  • 3.2Relevant stakeholders are notified of completion and reports and/or completion documents are finalised
  • 3.3Faults and evaluation findings are documented in accordance with workplace requirements

Performance evidence

  • identifying hazards, assessing risks, and identifying, applying and monitoring control measures
  • determining the preparation required for the evaluation of network protection and control system faults including: workplace organisational requirements, testing procedures and parameters, tools, equipment, personal protective equipment (PPE) and work permits, stakeholder liaison
  • inspecting and using relevant tools, equipment and PPE
  • demonstrating at least two (2) downloads from protection and control, or recording equipment
  • developing five (5) evaluation reports on power system events, including all of the following: interpretation of targets, flags and indicators, interpretation of fault reports using downloaded event data, development of conclusions and recommendations
  • documenting faults and evaluating findings in accordance with workplace requirements

Knowledge evidence

  • electrical equipment associated with protection and control schemes including: types and applications, characteristics and capabilities, diagrams and operating manuals
  • testing techniques and procedures
  • types and applications of test equipment
  • operation procedures for protection and control devices
  • relay manufacturer specifications, types, functions and characteristics
  • measurements, interpretation and analysis of protection and control schemes
  • detailed operation and setting of protection and control schemes
  • location and rectification of faults
  • fundamentals of high voltage (HV) plant and associated apparatus

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UETDRTS035

What does an assessment tool for UETDRTS035 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UETDRTS035 needs to address all 34 unit components: 3 elements with 19 performance criteria, 6 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UETDRTS035?

Auditori pulls the current release of UETDRTS035 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UETDRTS035 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UETDRTS035 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UETDRTS035, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UETDRTS035 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UETDRTS035 free