UETDRTS033Commission and maintain network protection and control systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UETDRTS033 must cover

40 assessable components: 3 elements (19 performance criteria), 7 performance evidence and 14 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to commission and maintain network protection and control systems

  • 1.1Workplace organisational requirements for the commissioning and maintenance of network protection and control systems, are reviewed and determined
  • 1.2Purpose of the commissioning and maintenance of network protection and control systems is established
  • 1.3Testing procedures are discussed and reviewed with appropriate personnel
  • 1.4Testing parameters are established from workplace organisational requirements
  • 1.5Tools, equipment and personal protective equipment (PPE) required for work are determined, obtained and confirmed in working order
  • 1.6Work is prioritised and sequenced for completion in accordance with workplace requirements
  • 1.7Relevant stakeholders are identified and liaised with
  • 1.8Hazards are identified, risks assessed, and control measures identified
  • 1.9Work permits are organised in accordance with workplace requirements

2 Commission and maintain network protection and control systems

  • 2.1Relevant stakeholder liaison and work permits are applied
  • 2.2Manual handling and use of tools, equipment and PPE are carried out in accordance with workplace requirements
  • 2.3Hazard control measures are applied and monitored in accordance with workplace requirements
  • 2.4Network protection and control systems are commissioned and maintained in accordance with workplace requirements
  • 2.5Network protection and control systems are tested in accordance with workplace requirements
  • 2.6Solutions to non-routine problems are identified and actioned
  • 2.7Quality checks of work are undertaken in accordance with workplace requirements

3 Complete work and documentation

  • 3.1Completed work is checked for compliance against workplace requirements
  • 3.2Relevant stakeholders are notified of completion and reports and/or completion documents are finalised
  • 3.3Commissioning and maintenance documentation is completed in accordance with workplace requirements

Performance evidence

  • identifying hazards, assessing risks, and identifying, applying and monitoring control measures
  • determining the preparation required for the commissioning and maintaining network protection and control systems including: - workplace organisational requirements - testing procedures and parameters - tools, equipment, personal protective equipment (PPE) and work permits - stakeholder liaison
  • inspecting and using relevant tools, equipment and PPE
  • establishing the purpose of the commissioning and maintenance of network protection and control systems
  • commissioning four (4) types of network protection and control systems
  • maintaining network protection and control systems, including: - isolating protection, control and alarms associated with protection and control schemes - carrying out function tests (trips and alarms) on protection and control schemes - recording performance of protection and control schemes - isolating in-service current transformers
  • completed commissioning and maintenance documentation is made available in accordance with workplace requirements

Knowledge evidence

  • electrical equipment associated with protection and control schemes, including: - types and applications - characteristics and capabilities
  • maintenance and commissioning system diagrams, drawings and operating manuals
  • testing techniques and procedures
  • types and applications of test equipment
  • operation, maintenance and commissioning procedures for protection devices and high voltage (HV) plant
  • relay manufacturer specifications, types, function and characteristics
  • operation, maintenance and commissioning procedures associated with other protection and control systems including: - gas collection - oil collection - sulphur hexafluoride (SF6) collection - surge relay
  • measurements, interpretation and analysis of protection and control schemes for HV plant and equipment
  • operation, maintenance and commissioning procedures associated with voltage regulation schemes
  • electrical equipment associated with distribution field device protection and control schemes
  • circuit breaker auxiliary systems
  • detailed operation and setting of protection and control schemes
  • location and rectification of faults in low voltage (LV) electrical equipment
  • effects of harmonics

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UETDRTS033

What does an assessment tool for UETDRTS033 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UETDRTS033 needs to address all 40 unit components: 3 elements with 19 performance criteria, 7 performance evidence requirements, 14 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UETDRTS033?

Auditori pulls the current release of UETDRTS033 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UETDRTS033 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UETDRTS033 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UETDRTS033, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UETDRTS033 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UETDRTS033 free