What an assessment for UEPOPS139 must cover

35 assessable components: 4 elements (14 performance criteria), 11 performance evidence and 10 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare work

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.2Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
  • 1.3Preoperational checks are carried out on hydro turbine plant in accordance with site requirements, manufacturers’ recommendations and specifications, and workplace procedures
  • 1.4Turbine running- up and loading schedule are ascertained from relevant documentation in accordance with workplace procedures

2 Run up hydro turbine

  • 2.1Hydro turbine and alternator auxiliary systems are started up and hydro turbine is run up in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.2Hydro turbine is monitored and observed to detect deviations from normal run-up operating conditions in accordance with workplace procedures
  • 2.3Corrective actions are taken to rectify hydro turbine abnormalities in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.4Alternator is synchronised and connected to electrical system in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.5Alternator is loaded in accordance with manufacturers’ recommendations and specifications, and workplace procedures

3 Test and analyse hydro turbine plant operation

  • 3.1Tests are performed in accordance with workplace procedures
  • 3.2Power generation system and hydro turbine plant are observed for operational response in accordance with workplace procedures
  • 3.3Causes of abnormal hydro turbine plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures

4 Complete documentation

  • 4.1Hydro turbine plant problems, movements and status are reported in accordance with workplace procedures
  • 4.2Documentation is updated in accordance with workplace procedures

Performance evidence

  • applying work health and safety (WHS)/occupational health and safety (OHS) legislated requirements, including: emergency procedures, risk control measures, safe working practices
  • communicating with personnel
  • identifying hydro turbine plant status
  • implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • interpreting manuals
  • organising resources
  • planning and preparing hydro turbine plant and equipment start and run-up operations
  • recognising and responding to abnormal plant operating conditions
  • testing hydro turbine plant operation using diagnostic and data analysis techniques and tools to determine faults
  • using recording procedures to complete documentation monitoring and operating hydro turbine plant and equipment
  • working with permit to work system

Knowledge evidence

  • arrangements for power generation plant
  • hydro turbine system components and interaction
  • s
  • operational processes of hydro turbine
  • permit to work system
  • regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • supervision and control system processes of hydro turbine
  • WHS/OHS requirements, including: emergency procedures, risk control measures, safe working practices
  • workplace documentation
  • workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEPOPS139

What does an assessment tool for UEPOPS139 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS139 needs to address all 35 unit components: 4 elements with 14 performance criteria, 11 performance evidence requirements, 10 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEPOPS139?

Auditori pulls the current release of UEPOPS139 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS139 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEPOPS139 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS139, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEPOPS139 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEPOPS139 free