UEPOPS135 — Shut down a heat recovery steam generator unit
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEPOPS135 must cover
46 assessable components: 5 elements (20 performance criteria), 14 performance evidence and 12 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare work
- 1.1Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
- 1.2Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
- 1.3Preoperational checks are carried out on HRSG plant in accordance with manufacturers’ recommendations and specifications, and workplace procedures
2 Operate HRSG plant during shutdown
- 2.1Supplementary firing system is placed in and out of service in accordance with manufacturers’ recommendations and specifications, and workplace procedures
- 2.2Gas turbine exhaust gas flow and power output are adjusted to achieve required steam temperature, pressure and flow conditions in accordance with workplace procedures
- 2.3Feedwater flows are adjusted to achieve required steam conditions and demand in accordance with workplace procedures
- 2.4HRSG drains and vents are operated to depressurise and drain steam and/or water space and heat exchange elements in accordance with manufacturers’ recommendations and specifications, and workplace procedures
- 2.5HRSG plant is maintained in required out-of-service condition in accordance with manufacturers’ recommendations and specifications, and workplace procedures
- 2.6Boiler water quality is maintained within required parameters to prevent corrosion of drums, headers and heat exchange elements in accordance with workplace procedures
- 2.7HRSG plant is operated within limits of design in accordance with workplace procedures
- 2.8HRSG plant is monitored in accordance with workplace procedures to detect deviations from required operating conditions
- 2.9Corrective action is taken to rectify HRSG plant abnormalities in accordance with manufacturers’ recommendations and specifications, and workplace procedures
3 Test HRSG plant operation during shutdown
- 3.1Tests are performed in accordance with workplace procedures
- 3.2Power generation system and HRSG plant are observed for operational response in accordance with workplace procedures
- 3.3HRSG plant is returned to required operational status upon completion of testing in accordance with workplace procedures
4 Analyse system faults
- 4.1Causes of abnormal HRSG plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures
- 4.2HRSG plant integrity and personnel safety are maintained through consultation with relevant personnel and technical and operational documentation in accordance with workplace procedures
- 4.3Relevant personnel are notified when defects are detected in accordance with workplace procedures
5 Complete documentation
- 5.1HRSG plant problems, movements and status are reported in accordance with workplace procedures
- 5.2Documentation is updated in accordance with workplace procedures
Performance evidence
- applying work health and safety (WHS)/occupational health and safety (OHS) legislation, including: - emergency procedures - risk control measures - safe working practices
- communicating with personnel
- completing documentation using recording procedures
- identifying heat recovery steam generator (HRSG) plant status
- interpreting manuals
- implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
- organising resources
- planning for HRSG plant shutdown
- preparing and operating HRSG plant and equipment
- responding to abnormal HRSG plant operating conditions
- shutting down HRSG plant operations
- testing HRSG plant operation using diagnostic and data analysis techniques and tools to determine faults
- using temperature and pressure reducing techniques and principles
- working with permit to work system
Knowledge evidence
- arrangements of power production plant
- control of steam temperature and pressure throughout full range of HRSG operation up to and including maximum continuous rating
- depressurisation and cooling
- HRSG gas path and water and steam circuits
- HRSG system components and the interaction of these components with other power generation plant and equipment
- manuals
- operation techniques for HRSG plant and equipment
- permit to work system
- regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
- WHS/OHS requirements, including: - emergency procedures - risk control measures - safe working practices
- workplace documentation
- workplace policies and procedures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEPOPS135
What does an assessment tool for UEPOPS135 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS135 needs to address all 46 unit components: 5 elements with 20 performance criteria, 14 performance evidence requirements, 12 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEPOPS135?
Auditori pulls the current release of UEPOPS135 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS135 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEPOPS135 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS135, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEPOPS001 — Analyse single protection device operation
- UEPOPS002 — Apply environmental and sustainable energy procedures
- UEPOPS003 — Apply quality systems to work
- UEPOPS004 — Carry out operational checks on in-service electrical plant
- UEPOPS005 — Clean plant and equipment
- UEPOPS006 — Collect and analyse hydrological and meteorological data
- UEPOPS007 — Conduct chemical batching operations
- UEPOPS008 — Operate and monitor control room site in a multi-function environment
- UEPOPS009 — Conduct minor electrical maintenance
- UEPOPS010 — Conduct minor mechanical maintenance
- UEPOPS011 — Conduct multiple energy source isolation procedures for permit to work
- UEPOPS012 — Conduct non-routine operational testing
Your UEPOPS135 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEPOPS135 free