UEPOPS117 — Operate local L.V. switchgear
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEPOPS117 must cover
39 assessable components: 4 elements (15 performance criteria), 13 performance evidence and 11 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to operate L.V. switchgear
- 1.1Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
- 1.2Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
- 1.3Location of L.V. switchgear is determined from relevant drawings, plans and maps in accordance with workplace procedures
- 1.4Switchgear type and operating procedure is identified in accordance with workplace procedures
- 1.5L.V. switchgear condition is assessed for safe operation in accordance with workplace procedures
- 1.6Related L.V. switchgear protection is suppressed in accordance with workplace procedures
2 Conduct L.V. switchgear operation
- 2.1Mechanical operation and limitations of L.V switchgear are identified in accordance with workplace procedures
- 2.2Implications of L.V. switchgear actions are identified, in accordance with workplace procedures
- 2.3L.V. switchgear is operated and required status is confirmed in accordance with workplace procedures
- 2.4Racking, testing, isolation, circuit earthing and reinstatement processes are carried out in accordance with workplace procedures
- 2.5Test equipment integrity is confirmed and L.V. switchgear circuit is de-energised in accordance with workplace procedures
3 Validate and report L.V. switchgear integrity
- 3.1L.V. switchgear is inspected for safe operation in accordance with workplace procedures
- 3.2L.V. switchgear environment is inspected in accordance with workplace procedures
4 Complete documentation
- 4.1L.V. switchgear plant problems, movements and status are reported in accordance with workplace procedures
- 4.2Documentation is updated in accordance with workplace procedures
Performance evidence
- applying work health and safety (WHS)/occupational health and safety (OHS) regulations, including: emergency procedures, personal protective equipment (PPE), risk control measures, safe working practices
- communicating with personnel
- completing documentation
- conducting isolation and earthing procedures
- identifying status of low voltage (L.V.) switchgear
- implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
- using plant drawings and plans
- planning L.V. secondary switchgear work
- preparing and operating L.V. secondary switchgear protection equipment
- recognising abnormal switchgear operations
- using manuals
- validating switchgear integrity
- working with permit to work system
Knowledge evidence
- abnormal secondary switchgear operations
- arrangements for power generation plant
- isolation and earthing procedures
- L.V. secondary switchgear operations
- manuals
- permit to work system
- power generating plant, equipment and location
- regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
- WHS/OHS requirements, including: emergency procedures, PPE, risk control measures, safe working practices
- workplace documentation
- workplace policies and procedures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEPOPS117
What does an assessment tool for UEPOPS117 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS117 needs to address all 39 unit components: 4 elements with 15 performance criteria, 13 performance evidence requirements, 11 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEPOPS117?
Auditori pulls the current release of UEPOPS117 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS117 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEPOPS117 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS117, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEPOPS001 — Analyse single protection device operation
- UEPOPS002 — Apply environmental and sustainable energy procedures
- UEPOPS003 — Apply quality systems to work
- UEPOPS004 — Carry out operational checks on in-service electrical plant
- UEPOPS005 — Clean plant and equipment
- UEPOPS006 — Collect and analyse hydrological and meteorological data
- UEPOPS007 — Conduct chemical batching operations
- UEPOPS008 — Operate and monitor control room site in a multi-function environment
- UEPOPS009 — Conduct minor electrical maintenance
- UEPOPS010 — Conduct minor mechanical maintenance
- UEPOPS011 — Conduct multiple energy source isolation procedures for permit to work
- UEPOPS012 — Conduct non-routine operational testing
Your UEPOPS117 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEPOPS117 free