What an assessment for UEPOPS070 must cover

41 assessable components: 6 elements (17 performance criteria), 14 performance evidence and 10 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare work

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.2Work requirements are identified from relevant personnel and documentation in accordance with workplace procedures
  • 1.3Preoperational checks are carried out on boiler unit plant in accordance with manufacturers’ recommendations and specifications, and workplace procedures

2 Operate boiler unit plant

  • 2.1Combustion is established and fuel consumption at minimum levels is supported in accordance with manufacturers’ recommendations and specifications, and workplace procedures
  • 2.2Fuel and air feed flows are adjusted to achieve required steam conditions, demand and observation of operating requirements in accordance with workplace procedures
  • 2.3Boiler unit plant is operated within the limits of the design in accordance with workplace procedures
  • 2.4Boiler unit plant is monitored and observed to detect deviations from required operating conditions in accordance with workplace procedures
  • 2.5Corrective actions are taken to rectify boiler unit abnormalities in accordance with manufacturers’ recommendations and specifications, and workplace procedures

3 Test boiler unit plant operation

  • 3.1Operational tests are performed in accordance with workplace procedures
  • 3.2Boiler unit plant is observed for correct operational response in accordance with workplace procedures
  • 3.3Boiler unit plant is returned to required operational status upon completion of test in accordance with workplace procedures

4 Analyse boiler unit plant faults

  • 4.1Causes of abnormal boiler unit plant operating conditions are identified by analysing technical and operational information in accordance with workplace procedures,
  • 4.2Boiler unit plant integrity and personnel safety is maintained in consultation with relevant personnel, technical and operational documentation in accordance with workplace procedures,

5 Monitor boiler unit plant

  • 5.1Boiler unit plant is monitored for normal operation and to detect deviations in accordance with workplace procedures
  • 5.2Relevant personnel are notified when defects are detected in accordance with workplace procedures

6 Complete documentation

  • 6.1Boiler unit plant problems, movements, abnormalities and status are reported in accordance with workplace procedures
  • 6.2Documentation is updated in accordance with workplace procedures

Performance evidence

  • analysing boiler unit plant faults using data analysis techniques and tools
  • applying work health and safety (WHS)/occupational health and safety (OHS) requirements, including: emergency procedures, risk control measures, safe working practices
  • communicating with personnel
  • completing documentation using recording procedures
  • identifying boiler unit plant status
  • implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • interpreting manuals
  • operating boiler plant and equipment
  • organising resources
  • preparing and planning work
  • recognising and responding to abnormal boiler unit plant operating conditions
  • testing boiler unit plant operationally using diagnostic and test techniques
  • utilising permit to work system
  • working with boiler unit plant and equipment

Knowledge evidence

  • arrangements of power production plant
  • boiler unit plant and equipment, location and operating parameters
  • boiler unit plant operation processes
  • boiler unit plant status
  • manuals
  • permit to work system
  • regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • WHS/OHS requirements, including: emergency procedures, risk control measures, safe working practices
  • workplace documentation
  • workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEPOPS070

What does an assessment tool for UEPOPS070 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS070 needs to address all 41 unit components: 6 elements with 17 performance criteria, 14 performance evidence requirements, 10 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEPOPS070?

Auditori pulls the current release of UEPOPS070 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS070 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEPOPS070 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS070, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEPOPS070 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEPOPS070 free