What an assessment for UEPOPS022 must cover

45 assessable components: 4 elements (18 performance criteria), 13 performance evidence and 14 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare for switching program

  • 1.1Qualifications and authorisations of personnel performing switching operations are established in accordance with workplace procedures
  • 1.2Work health and safety (WHS)/occupational health and safety (OHS) regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, environmental requirements and workplace procedures are identified, applied and monitored
  • 1.3Contingency plan is evaluated and discussed with key stakeholders and relevant amendments are relayed to relevant personnel in accordance with workplace procedures
  • 1.4Permit and access requirements are established prior to switching program commencement in accordance with workplace procedures
  • 1.5Documentation is distributed to relevant personnel prior to switching program commencement in accordance with workplace procedures,

2 Direct switching program

  • 2.1Personnel are advised of switching program and directed to locations in accordance with workplace procedures
  • 2.2Communication is established with key stakeholders and personnel and is maintained throughout duration of switching program in accordance with workplace procedures
  • 2.3Network system schematic diagram, or equivalent, is updated as switching program proceeds in accordance with workplace procedures,
  • 2.4Access to power generation plant is controlled in accordance with workplace procedures
  • 2.5Work groups are coordinated and directed throughout switching program in accordance with workplace procedures
  • 2.6Permits issued are monitored and recorded in accordance with workplace procedures
  • 2.7Switching program is controlled to ensure outage coincides with planned timetable in accordance with workplace procedures,

3 Maintain dynamic integrity of system

  • 3.1Switching program steps are verified before and after each operation in accordance with workplace procedures
  • 3.2Switching program steps are recorded on successful completion of each operation in accordance with workplace procedures
  • 3.3Network system conditions or stability is constantly monitored in accordance with workplace procedures
  • 3.4Alternative switching program steps are developed for unexpected problems in accordance with workplace procedures

4 Complete documentation

  • 4.1Equipment problems and status are reported in accordance with workplace procedures
  • 4.2Documentation is updated in accordance with workplace procedures

Performance evidence

  • applying work health and safety (WHS)/occupational health and safety (OHS) requirements, including: emergency procedures, risk control measures, safe working practices
  • communicating with personnel
  • completing documentation
  • coordinating and directing switching programs
  • identifying power generation plant status, including: monitoring network system integrity and stability, analysing system operational information, recognising abnormal power generating plant and network system operating conditions, determining corrective actions
  • implementing regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • interpreting power generation plant drawings and network system diagrams
  • liaising with stakeholders
  • maintaining dynamic integrity of power generation system
  • preparing for switching program
  • using manuals
  • utilising contingency plans
  • working with permit to work system

Knowledge evidence

  • arrangements of power production plant, including: corrective actions, power generation plant and equipment, location and operating parameters, power generation plant status, switchgear types and characteristics, systems network
  • contingency plans
  • coordination and direction of switching programs
  • permit to work system
  • plant drawings, network system diagrams, and manuals
  • power generation network system diagrams
  • power generation system integrity and stability monitoring processes and procedures
  • preparations for switching programs
  • regulations, legislative requirements, codes of practice, manufacturers’ recommendations and specifications, and environmental requirements
  • stakeholder liaison
  • switching operation processes and procedures
  • WHS/OHS requirements, including: emergency procedures, risk control measures, safe working practices
  • workplace documentation
  • workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEPOPS022

What does an assessment tool for UEPOPS022 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPOPS022 needs to address all 45 unit components: 4 elements with 18 performance criteria, 13 performance evidence requirements, 14 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEPOPS022?

Auditori pulls the current release of UEPOPS022 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPOPS022 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEPOPS022 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPOPS022, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEPOPS022 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEPOPS022 free