What an assessment for UEPMNT440 must cover

57 assessable components: 6 elements (29 performance criteria), 14 performance evidence and 14 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare for work

  • 1.1Requirements including scope of work and assigned roles are identified and confirmed with appropriate personnel or by site inspection, in accordance with workplace procedures
  • 1.2Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) regulations, legislative requirements, industry standards, codes of practice, manufacturers’ specifications, environmental obligations and workplace procedures are reviewed in preparation for work
  • 1.3Resources are obtained and inspected for compliance with job specifications
  • 1.4Relevant plans, drawings and manuals are selected and used, in accordance with workplace procedures
  • 1.5Correct quantity of materials and components for work are obtained and inspected for compliance with job specification
  • 1.6Work is planned, sequenced and prioritised, in accordance with workplace procedures
  • 1.7Potential hazards are identified and risk control measures are selected and implemented, in accordance with workplace procedures
  • 1.8Work area is prepared, in accordance with workplace procedures

2 Verify fault

  • 2.1Normal performance and function of inverter system equipment is ascertained by consulting appropriate personnel and reference sources, in accordance with workplace procedures
  • 2.2Fault indicators, technical information and diagnostic techniques are used to verify reported faults, in accordance with workplace procedures
  • 2.3Faults are reproduced and monitored, if possible, in accordance with workplace procedures

3 Find fault

  • 3.1Isolations are confirmed, where appropriate, in accordance with workplace procedures
  • 3.2Equipment components, wires and terminations are inspected for faults, in accordance with workplace procedures
  • 3.3Diagnostic techniques are selected and used, in accordance with workplace procedures
  • 3.4Components are disconnected to enable accurate test measurements of suspected faulty components, without concern of back feed readings, in accordance with workplace procedures
  • 3.5Test and measurement instruments are used, in accordance with workplace procedures and manufacturers’ instructions

4 Determine cause of fault

  • 4.1Appropriate personnel are consulted to obtain details relating to faulty system, in accordance with workplace procedures
  • 4.2Use is made of information from fault indicators and maintenance records, in accordance with workplace procedures
  • 4.3Conclusions about nature and cause of fault are reached from analysis of available evidence, in accordance with workplace procedures

5 Repair fault

  • 5.1Isolations are confirmed, where appropriate, in accordance with workplace procedures
  • 5.2Faulty, worn or damaged components are replaced or repaired, in accordance with workplace procedures
  • 5.3Parts and components are selected and used, in accordance with manufacturers’ specifications and workplace procedures
  • 5.4Inverter system components are disconnected for testing and are reconnected having been proven free of faults, and all terminations are then checked to ensure they are electrically and mechanically sound, in accordance with workplace procedures
  • 5.5Faults are repaired, in accordance with workplace procedures
  • 5.6Final inspection is performed, in accordance with workplace procedures

6 Complete work

  • 6.1Work is completed and appropriate personnel are notified, in accordance with workplace procedures
  • 6.2Work area is cleared of waste, cleaned, restored and secured, in accordance with workplace procedures
  • 6.3Tools and equipment are maintained and stored, in accordance with workplace procedures
  • 6.4Work completion details are finalised, in accordance with workplace procedures

Performance evidence

  • applying Work, Health and Safety (WHS)/Occupational Health and Safety (OHS) requirements including: emergency procedures, hazard identification, risk control measures, safe working practices
  • communicating with personnel
  • completing work as per scheduled requirements
  • determining cause of faults using data analysis techniques and tools
  • determining permit to work requirements
  • finding faults using diagnostic techniques and procedures
  • implementing legislation, industry standards, codes of practice and regulations
  • interpreting manufacturers’ specifications and manuals
  • planning and preparing for diagnosis and repair of faults in power plant inverter systems work
  • repairing faults using repair techniques and procedures
  • selecting materials
  • using manufacturers’ specifications and manuals
  • utilising test and measurement instruments
  • verifying faults using verification techniques

Knowledge evidence

  • diagnostic techniques
  • equipment and materials
  • generation plant and equipment, its location and operation
  • isolations
  • legislation, industry standards, codes of practice and regulations
  • manufacturers’ specifications and manuals
  • permit to work system
  • repair techniques
  • test and measurement instruments
  • typical arrangements of power production plant
  • verification techniques
  • WHS/OHS legislated requirements including: emergency procedures, hazard identification, risk control measures, safe working practices
  • workplace documentation
  • workplace policies and procedures

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEPMNT440

What does an assessment tool for UEPMNT440 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEPMNT440 needs to address all 57 unit components: 6 elements with 29 performance criteria, 14 performance evidence requirements, 14 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEPMNT440?

Auditori pulls the current release of UEPMNT440 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEPMNT440 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEPMNT440 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEPMNT440, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEPMNT440 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEPMNT440 free