UEERE0009 — Conduct periodic maintenance of remote area power supply wind generators
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEERE0009 must cover
44 assessable components: 3 elements (20 performance criteria), 13 performance evidence and 11 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Prepare to conduct periodic maintenance on wind generators
- 1.1Work health and safety (WHS)/occupational health and safety (OHS) procedures for a RAPS plant are identified and applied in accordance with workplace procedures
- 1.2Risk control measures are applied in accordance with workplace procedures prior to commencing work
- 1.3Risks/hazards are identified, assessed, reported to relevant person/s and control measures implemented
- 1.4Nature and location of RAPS system is identified from relevant documentation or from relevant person/s to determine the scope of work
- 1.5Instructions for coordinating work with relevant personnel and the local community is obtained from relevant person/s and applied
- 1.6Materials required for the work are identified and accessed in accordance with workplace procedures
- 1.7Tools, equipment and testing devices required for work are obtained and checked for correct operation and safety
2 Maintain RAPS systems wind generators
- 2.1Workplace risk control measures and procedures are applied
- 2.2Need to test or measure live electrical work is determined in accordance with WHS/OHS requirements and conducted in accordance with workplace procedures
- 2.3Circuits/machines/plant are isolated in strict accordance with WHS/OHS requirements and workplace procedures
- 2.4RAPS system wind generators are tested in accordance with relevant workplace procedures
- 2.5Wind generator maintenance, including performance measurements and repairs, is completed safely in accordance with workplace routines and procedures
- 2.6Known types of wind generator functional faults are identified using fault-finding procedures
- 2.7Non-routine events are referred to relevant person/s for directions in accordance with workplace procedures
- 2.8Maintenance and repair work are completed minimising waste of materials, energy, damage to apparatus, circuits, the surrounding environment and services
- 2.9Quality checks are conducted in accordance with workplace procedures
3 Complete maintenance work of wind generators and report outcomes
- 3.1Workplace risk control measures and procedures are applied
- 3.2Worksite is cleaned and made safe in accordance with workplace procedures
- 3.3Maintenance issues are referred to the local community in accordance with workplace procedures
- 3.4Wind generator performance measurements are reported to relevant person/s in accordance with maintenance reporting procedures
Performance evidence
- measuring and recording generator no-load and load voltages
- measuring and recording generator output for three load conditions
- visually inspecting generator and support structure for physical damage
- visually inspecting generator connections and cables
- identifying generator defects and faults
- reporting all maintenance activities
- dealing with unplanned events
- applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including the use of risk control measures
- checking isolation of circuits/machines/system
- coordinating work with relevant personnel and the local community
- determining live testing/measurement requirements
- identifying and accessing materials, tools, equipment and testing devices
- maintaining remote area power supply (RAPS) wind generators
Knowledge evidence
- RAPS systems wind generator maintenance techniques, including:
- wind generator minor maintenance encompassing:
- checking the integrity of support structure
- tension of stay wires
- visual inspection of wind generator operation
- maintaining logbooks and maintenance regime
- relevant manufacturer specifications
- relevant job safety assessments or risk mitigation processes
- relevant WHS/OHS legislated requirements
- relevant workplace documentation
- relevant workplace policies and procedures
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEERE0009
What does an assessment tool for UEERE0009 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERE0009 needs to address all 44 unit components: 3 elements with 20 performance criteria, 13 performance evidence requirements, 11 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEERE0009?
Auditori pulls the current release of UEERE0009 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERE0009 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEERE0009 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERE0009, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEERE0001 — Apply environmentally and sustainable procedures in the energy sector
- UEERE0006 — Conduct periodic maintenance of remote area power supply battery banks
- UEERE0007 — Conduct periodic maintenance of remote area power supply generator sets
- UEERE0008 — Conduct periodic maintenance of remote area power supply photovoltaic arrays
- UEERE0013 — Develop strategies to address environmental and sustainability issues in the energy sector
- UEERE0015 — Implement and monitor energy sector environmental and sustainable policies and procedures
- UEERE0018 — Maintain and repair remote area power generation facilities
- UEERE0049 — Apply safe work practices in the rooftop solar industry
- UEERE0050 — Identify and isolate multiple supply systems
- UEERE0051 — Apply electrical principles to renewable energy design
- UEERE0052 — Assess energy loads and uses for energy efficiency in commercial facilities
- UEERE0053 — Assess energy loads and uses for energy efficiency in industrial properties and enterprises
Your UEERE0009 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEERE0009 free