UEERA0024Design hydronic systems and select equipment

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEERA0024 must cover

129 assessable components: 3 elements (14 performance criteria), 9 performance evidence and 106 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to design hydronic systems and select equipment

  • 1.1WHS/OHS requirements and workplace procedures for a given work area are identified, obtained and applied
  • 1.2WHS/OHS risk control measures and workplace procedures are followed in preparation for the work
  • 1.3Scope of the proposed hydronic system is determined from the design brief and/or consultations with relevant person/s
  • 1.4Design development work is planned in accordance with workplace procedure for timelines in consultation with others involved

2 Design hydronic systems and select equipment

  • 2.1Relevant hydronic system processes and methods are applied to the design
  • 2.2Alternative concepts for design are evaluated in accordance with the design brief
  • 2.3Safety, functionality and budgetary considerations are incorporated in the design specifications
  • 2.4System design draft is checked for compliance in accordance with the design brief and relevant industry standards
  • 2.5System design is documented for submission to relevant person/s for approval
  • 2.6Unplanned events are dealt with in accordance with problem-solving techniques and workplace procedures

3 Obtain approval for hydronic system design and equipment selection

  • 3.1System design is presented to customer and/or relevant person/s
  • 3.2Requests for alterations to the design are negotiated with relevant person/s in accordance with workplace procedures
  • 3.3Final design is documented and approval obtained from relevant person/s in accordance with workplace procedures
  • 3.4Quality of work is monitored in accordance with workplace procedures and relevant industry standards

Performance evidence

  • developing outlines of alternative designs
  • developing the design within the safety, regulatory, functional requirements and budget limitations
  • documenting and presenting design effectively
  • successfully negotiating design alteration requests
  • obtaining approval for final design
  • dealing with unplanned events
  • applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, including using risk control measures
  • designing hydronic systems and selecting equipment
  • preparing to design hydronic systems and select equipment

Knowledge evidence

  • heating, ventilation and air conditioning/refrigeration (HVAC/R) hydronic system design, safe working practices and relevant standards, codes and regulations, including:
  • hydronic system design fundamentals:
  • principles of fluid flow
  • properties of fluids
  • flow of ideal fluids
  • fluid flow equipment
  • Bernoulli Theorem
  • fluid flow in pipes
  • pressure loss and static head – calculation:
  • flow throughout system
  • pressure throughout system
  • friction losses
  • pressure loss charts for: copper, steel and unplasticised polyvinyl chloride (uPVC)
  • dynamic losses
  • fitting pressure losses
  • fitting interaction
  • total losses
  • calculating system (static and dynamic) head
  • pump performance and selection:
  • pump classification and types
  • pump performance terminology, discharge, head, power, efficiency, speed and net positive suction head required
  • pump performance curves
  • pump laws
  • system head and ‘K’ factor
  • balance points
  • energy considerations
  • pump cavitation
  • calculation of net positive suction head available
  • series and parallel operation
  • pipe sizing:
  • maximum friction rate
  • erosion and equipment life
  • industry standards
  • recommended system water velocities
  • economic balance - first cost and operating cost
  • hot water systems:
  • boilers
  • coils
  • expansion tanks
  • pumps and characteristics curves
  • control valves, types and flow diagrams
  • air purge points
  • water treatment
  • pipe anchors and expansion joints
  • chilled water systems:
  • chillers
  • coils
  • expansion tanks
  • pumps and characteristics curves
  • control valves, types and flow diagrams
  • air purge points
  • water treatment
  • pipe anchors and expansion joints
  • HVAC/R hydronic systems:
  • systems operation
  • closed/open systems
  • pump head/lift and static head (high-rise building)
  • system friction losses
  • nett positive suction head
  • system curves
  • pumps:
  • types
  • selection criteria
  • performance characteristics
  • bladder tanks
  • coil characteristics
  • heat exchangers: plate, shell and tube, and tube in tube
  • flow measurements: types
  • flow switchers
  • builders: types and performance characteristics
  • cooling towers: elementary cooling thermodynamics and types
  • valves - flow control devices:
  • types and applications
  • throttling characteristics
  • flow measurements
  • selection and applications
  • hydronic system configuration and design:
  • piping configurations
  • single pipe closed circuit
  • two pipe closed circuit
  • direct return
  • three pipe closed circuit with reversed return
  • three-way diverting valves
  • risers and headers
  • component location
  • evaluation of piping configurations:
  • capital cost
  • owning and operating costs
  • noise vibration
  • maintenance
  • future expansion
  • commissioning and balancing
  • operating characteristics
  • cavitation
  • system pipe sizes:
  • pipe dynamic and friction losses for different materials
  • fitting pressure losses for different materials
  • thermal heat losses
  • bare, insulated and underground pipes
  • air conditioning system design
  • problem-solving techniques
  • relevant job safety assessments or risk mitigation processes
  • relevant manufacturer specifications
  • relevant WHS/OHS legislated requirements
  • relevant workplace budget, quality, policies and procedures
  • relevant workplace documentation

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEERA0024

What does an assessment tool for UEERA0024 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEERA0024 needs to address all 129 unit components: 3 elements with 14 performance criteria, 9 performance evidence requirements, 106 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEERA0024?

Auditori pulls the current release of UEERA0024 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEERA0024 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEERA0024 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEERA0024, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEERA0024 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEERA0024 free