UEEIC0014Develop, enter and verify programs in supervisory control and data acquisition systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEEIC0014 must cover

90 assessable components: 3 elements (25 performance criteria), 15 performance evidence and 50 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Identify SCADA system

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) procedures for a given work area are identified obtained and applied
  • 1.2Hazards are identified, risks are assessed and control measures implemented
  • 1.3Extent of SCADA system is determined from design brief and job specifications
  • 1.4Process data is analysed for development of graphical design/mimic diagrams
  • 1.5Programmable logic controller (PLC) analogue and digital addresses are related to tag databases
  • 1.6Tag data types are entered and configured in tag database
  • 1.7Graphic objects are created and added to a graphic library, as required, in accordance with vendor software
  • 1.8Security requirements are determined for SCADA system to prevent access by unauthorised person/s
  • 1.9SCADA system is configured to provide appropriate reporting mechanisms
  • 1.10Equipment, software and testing devices for work are obtained in accordance with workplace procedures and checked for correct operation and safety

2 Develop and enter program using dedicated SCADA software

  • 2.1WHS/OHS risk control measures and workplace procedures for carrying out the work are followed
  • 2.2SCADA software is used to develop human-machine interface (HMI) processes and to accept and implement operators control instructions
  • 2.3Supervisory control functions, data acquisition components and automated tasks are programmed using SCADA software
  • 2.4Data is manipulated within the SCADA software to function in accordance with design brief and job specifications
  • 2.5Alarms and limits for processing variables are identified and programmed in accordance with workplace procedures
  • 2.6Trends for process variables and limits are programmed in accordance with workplace procedures and manufacturer instructions
  • 2.7Reports are configured to display/print appropriate information
  • 2.8User rights/security is configured to provide appropriate access to SCADA system
  • 2.9Unplanned situations are responded to in accordance with workplace procedures and selected for safety and specified work outcomes

3 Monitor verify and document programming activities

  • 3.1Device operation is tested in accordance with WHS/OHS requirements and workplace procedures
  • 3.2Entered objects and settings are tested in accordance with job specifications and manufacturer specifications
  • 3.3SCADA software tools are used to test and monitor programs, and operating anomalies are identified and corrected in accordance with workplace procedures
  • 3.4WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.5SCADA system specifications and programs are documented in accordance with workplace procedures
  • 3.6Work completion is reported and relevant person/s notified in accordance with workplace procedures

Performance evidence

  • analysing data
  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including implementing risk control measures
  • configuring user access rights
  • correcting programming faults and anomalies
  • creating graphic objects and adding to graphic’s library
  • dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • developing and entering programs using dedicated supervisory control and data acquisition (SCADA) software
  • developing human-machine interfaces (HMIs)
  • developing SCADA system from design brief and job specifications
  • documenting SCADA system programming
  • entering tag data types into configured database
  • identifying programs for SCADA systems
  • monitoring, verifying and documenting programming activities
  • producing reports using SCADA
  • programming supervisory control functions and data acquisition components

Knowledge evidence

  • SCADA system communications and networking, including:
  • programmable logic controller (PLC) interface requirements
  • networking requirements of the system
  • SCADA system differences from distributed control system (DCS) and process control systems
  • SCADA (HMI software package costing
  • types of networks available with SCADA HMI
  • coordinate and access of networking to factory network
  • the difference between SCADA and process control systems
  • mimics and animated graphics, including:
  • graphic designs, balance clarity of layout and navigation
  • assessment of data required to be entered in software package
  • validation of entered data
  • trending, including:
  • analysis of process to select data, including sampling of the process
  • viewing data and graphical representation of selected information
  • trend graphs and data matching
  • the difference between real time trends and historic trends
  • alarm logging, including:
  • analysing selected data and applying limits to processes
  • corrective actions and notifications of alarm status
  • alarm data availability for third-party software systems
  • recipes and scheduling, including:
  • methods of producing libraries for different process parameters required for varied production runs
  • analysis of different production runs, including amounts of materials, pressure, temperature and weights
  • alarm limits/material specifications
  • where and when scheduling is used
  • scheduling, setting limits and evoking program changes
  • data collection and databases, including:
  • produce a database of variable tags and range specifications involved in the process
  • conversion export of raw data into appropriate forms for data management and report creation, e.g., Excel and Paradox
  • types and layout of reports
  • aims of customer, management, statistical and account reports
  • analysis of data in reports: design and graphical data representations
  • assessment of data required for the report
  • programming language, including:
  • scripting languages in SCADA HMI software
  • automate tasks within the software PLC or SCADA
  • complex processing of process data where field equipment i.e. PLC does not have the capability or to minimise control lag
  • implementation and applications, including:
  • typical applications in manufacturing and process control, e.g., food processing, packaging, automotive industry, energy management and steel production and mining
  • relevant databases
  • relevant equipment, software and testing devices
  • relevant job safety assessments or risk mitigation processes, including risk control measures
  • relevant manufacturer specifications
  • relevant WHS/OHS legislated requirements
  • relevant workplace documentation and reporting
  • relevant workplace policies and procedures
  • SCADA system authorised user access and security requirements
  • SCADA systems programming
  • tag databases and PLCs

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEEIC0014

What does an assessment tool for UEEIC0014 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEIC0014 needs to address all 90 unit components: 3 elements with 25 performance criteria, 15 performance evidence requirements, 50 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEEIC0014?

Auditori pulls the current release of UEEIC0014 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEIC0014 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEEIC0014 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEIC0014, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEEIC0014 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEEIC0014 free