What an assessment for UEEEL0078 must cover

62 assessable components: 3 elements (35 performance criteria), 12 performance evidence and 15 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to install whole current meter

  • 1.1Scope of work activity is confirmed from the work order / instruction, in consultation with supervisor / authorised person
  • 1.2Appropriate electricity meter and enclosure are identified and confirmed in accordance with workplace procedures
  • 1.3Customer is advised of proposed work and scheduling in accordance with job requirements/specifications and workplace procedures
  • 1.4Work Health and Safety (WHS) / Occupational Health and Safety (OHS) requirements and relevant workplace procedures including de-energising, isolation and energising are identified and implemented
  • 1.5Hazards are identified, risks assessed, and risk control measures and Safe Work Method Statements (SWMS) applied
  • 1.6Switchboard on which the meter is to be installed is inspected and evaluated for compliance with safety and functionality requirements and industry standards
  • 1.7Approval to rectify safety and/or functionality defects identified by visual inspection of the switchboard is sought from relevant person/s in accordance with workplace procedures
  • 1.8Installation and any rectification work is planned and sequenced appropriately in consultation with relevant person/s and in accordance legislative framework
  • 1.9Confirmation that safe isolation of the installation, access to a communication’s connection and implementation of any relevant safeguards to associated metering services can be completed in accordance with job requirements is obtained
  • 1.10Resources, materials, tools, equipment and testing devices are obtained and checked for correct operation and safety and against job requirements and specifications in accordance with workplace procedures
  • 1.11Personal Protective Equipment (PPE) is selected, checked and used accordance with workplace procedures

2 Install whole current electricity meter

  • 2.1Need to test or measure live work is determined in accordance with WHS/OHS requirements, workplace procedures and SWMS
  • 2.2Pre installation tests and assessments are carried out, correct meter to be replaced confirmed and information documented in accordance with workplace procedures
  • 2.3Approval to rectify safety and/or functionality defects identified by testing and assessment is sought from relevant person/s in accordance with workplace procedures
  • 2.4Work activities outside of the limits of own authority and/or qualification are identified, and assistance sought if required in accordance with operating instructions and workplace procedures
  • 2.5Existing meter is isolated by authorised person and checked and tested to confirm ‘deenergised’ in accordance with workplace procedures and WHS/OHS requirements
  • 2.6Approved rectification work is carried out to comply with industry standards and in accordance with workplace procedures
  • 2.7Meter is installed to comply with relevant technical industry standards, job specifications and workplace procedures and requirements
  • 2.8Meter power and communication connections, and where required communications technology device installation, are made in accordance with manufacturer and job specifications and workplace procedures
  • 2.9Meter is configured and functionality confirmed in accordance with manufacturer specifications and workplace procedures
  • 2.10Work progress is monitored against the approved pre-start risk assessment (workplan) and adjustments to the plan made, as required, in accordance with workplace procedures
  • 2.11Test procedures are performed to establish and confirm a neutral integrity test point (NITP), integrity of MEN, phase rotation where applicable, and main earth connections in accordance with workplace procedures
  • 2.12Ongoing checks of the quality of installation are undertaken in accordance with workplace procedures
  • 2.13Installation is carried out efficiently without unnecessary waste of materials or damage to apparatus circuits, the surrounding environment or services using sustainable energy principles
  • 2.14Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

3 Complete meter installation activity and report completion of work

  • 3.1WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2Supply is reinstated ‘energised’ to the installation in accordance with workplace procedures
  • 3.3Final inspection and tests are made to ensure the installation conforms to job requirements and workplace procedures
  • 3.4Worksite and tools are cleaned and made safe, and waste disposed of, in accordance with workplace procedures
  • 3.5Where required, hazardous waste is removed and disposed of in accordance with regulatory requirements and workplace procedures
  • 3.6Final visual inspection of installation and work area is performed to ensure the work site is left clean of any hazardous materials or substances in accordance with workplace procedures
  • 3.7‘As-installed’ meter or rectification work is documented, and appropriate person/s notified in accordance with workplace procedures
  • 3.8Installation and certification compliance report/s and other documentation is updated and submitted, as required, in accordance with workplace procedures
  • 3.9Work supervisor or authorised person/s notified of completion of work and the completion of activity is documented in accordance with the pre-start risk assessment (workplan)
  • 3.10Metering installation work outcomes, configurations and completion of work is communicated to the customer in accordance with workplace procedures

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including: completing risk assessment and implementing risk control measures; inspecting and evaluating safety and functionality compliance of the switchboard; identifying and eliminating hazards such as Asbestos Containing Materials (ACMs); producing draft pre-start risk assessment (workplan) including any rectification work and need for issuance of Safe Work Method Statements (SWMS); completing all work in accordance with relevant workplace procedures, industry standards, manufacturer specifications and regulation
  • communicating with customers about metering installation work outcomes, planned interruption notification work on accordance with required legislative framework, and configurations completion of work schedule
  • carrying out required pre and post installation tests and assessments
  • installing, configuring and commissioning whole current electricity meters
  • installing communication connection devices
  • rectifying compliance defects
  • reinstating supply to the installation safely
  • performing final inspection and tests to ensure installed meter conforms to work order and job requirements
  • cleaning and making safe work area and tools and removing and disposing of consumable items and waste materials including meters and any hazardous substances
  • conducting final visual checks of the meter installation activity and work area to ensure the work site is left clean of any potential hazards or inappropriate materials
  • completing and submitting installation compliance certification and documentation and reporting meter installation completion of work activities to relevant person/s
  • dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment

Knowledge evidence

  • the contestable market and market participants overview: purpose of a contestable market; market participants and their roles and responsibilities encompassing electricity retailers; reasons for meter and the regulated market; regulatory timeframes (AER); regulatory framework
  • relevant WHS/OHS legislated and regulation requirements including: identifying hazards at customers premises; identifying hazards at electrical switchboards; identifying known electrical design hazards; performing site specific risk assessment; carrying out job safety assessments and/or risk mitigation processes; implementing critical controls including PPE; principles of duty of care responsibilities; risks and hazards of working on or near live electrical equipment and conductors; risks associated with testing or measuring live; risks associated with lifting and shorting CT circuits, opening slides on test blocks, CATIV connectors to test equipment; safeguards for potential fault currents; safeguards potential arc flash and arc flash burns; safeguards of potential risks with other services (e.g. gas meters)
  • hazards and mitigation requirements of Asbestos Containing Materials (ACMs), including: ACMs code of practice; identifying ACMs; meters containing ACMs; other components ACMs; drilling, removal, disposal, and decontamination
  • hazards and mitigation requirements of other potential hazardous materials and substances in metering installation work
  • isolation requirements and risks, including: isolating customer load via m/s or rewireable fuse; isolating supply to meter via SPD / MPD / MIL; confirming isolated – proving safe to work
  • whole current electricity meter concepts and installation, including: purpose, types and applications; single and polyphase (multi-element) meters; classes of meter types (e.g. integrated, Whole Current [WC], functions (e.g. controlled load, net and gross as well as those with internal load control switching), and typical construction and associated risks; relevant state/territory regulator whole current electricity meter commissioning requirements and specifications
  • communication methods and arrangements as well as: segregation and dangers of exposure to conductive parts; configuration techniques and practices; communications technology devices (e.g. antenna/transmitter); installing communications technology devices and cables in the proximity of LV conductors, mountings and routing cables; performance verification and rectification of communication problems; importing and exporting energy incorporating power and energy difference; installation and power connection arrangements and segregation with gas metering; procedures for configuring meter parameter
  • current industry practices and technologies, including: scope for meter installer; managing defects; meter reading; meter disposal (including identified Asbestos Containing Materials (ACMs) meters); metering details (administration); communications technology device and cabling installation; planed interruptions notification and network isolations
  • standard wiring configurations, including: single phase; single phase with Communication Links (CL); three-phase; three-phase with Communication Links (CL); net generation; gross generation
  • meter layouts and requirements as determined by meter providers
  • non-standard configurations (e.g. ANNA – looped neutral – multiple occupancy; rural – multiple meter locations, SWER systems; network load control devices; direct supply to metering; embedded networks)
  • electrical testing techniques and practices, including: test methods and pre-test calibration of test equipment; types of electrical tests including live tests; pre and post work tests; polarity and neutral tests; phase rotation; MEN integrity tests; pre energisation tests; equipment integrity tests
  • facilities for the installation of metering equipment including: seals or locks to metering equipment; local jurisdictional rules and procedures related to Service Protection Device/s (SPD) / Meter Protection Device/s (MPD) / Meter Isolation Link (MIL); meter equipment panel; meter equipment components; metering equipment enclosure; physical protection and segregation of metering equipment; meter equipment enclosure fixing requirements; metering equipment fixing requirements; isolated and unattended locations and locking of metering enclosures; location and accessibility of metering equipment for different types of premises
  • documentation including: Australian standards (e.g. wiring rules), codes of practice; National Electricity Law; Meter Installation Authorisation Schemes; meter provider rules; rules or Service and Installation Rules (SIRs); planned legislative interruption notification framework - National Energy Customer Framework (NECF) guidelines; customers’ electricity retailer provider certificates of compliance or completion; work orders and job requirements; Safe Work Method Statements (SWMS); labelling of metering equipment and metering installation components; workplace procedures encompassing meter equipment and installation pre-start risk assessment (workplan); manufacturer specifications
  • communicating technical information including requirements for: liaising with customers; liaising with retailers; liaising with supervisors and/or authorised persons; resolving interruptions and complaints

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEEEL0078

What does an assessment tool for UEEEL0078 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEEL0078 needs to address all 62 unit components: 3 elements with 35 performance criteria, 12 performance evidence requirements, 15 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEEEL0078?

Auditori pulls the current release of UEEEL0078 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEEL0078 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEEEL0078 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEEL0078, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEEEL0078 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEEEL0078 free