UEEEL0074Wind electrical coils

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEEEL0074 must cover

41 assessable components: 3 elements (15 performance criteria), 11 performance evidence and 15 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to wind electrical coils

  • 1.1Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures for a given work area are identified and understood
  • 1.2Existing WHS/OHS risk control measures for work preparation are followed
  • 1.3Work instructions are identified, obtained and applied
  • 1.4Advice is sought from the work supervisor to ensure work is coordinated effectively with others
  • 1.5Materials required for work are obtained in accordance with work instructions and workplace procedures
  • 1.6Tools, equipment and testing devices needed to carry out electrical work are obtained and checked for correct operation and safety

2 Wind electrical coils

  • 2.1Existing WHS/OHS risk control measures for winding electrical coils work are followed
  • 2.2Winding machines are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.3Winding wire and insulation are selected in accordance with work instructions and workplace procedures
  • 2.4Winding formers and machine are set up in accordance with workplace instructions
  • 2.5Unplanned situations are responded to in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • 2.6Routine quality checks are conducted to ensure electrical coils are correctly wound with correct wire, number of turns and shape in accordance with work instructions
  • 2.7Coil work is completed within timeframe, environment and workplace conditions

3 Complete workplace report

  • 3.1WHS/OHS workplace completion risk control measures are followed
  • 3.2Workplace report, forms/data sheets are completed accurately in accordance with workplace procedures

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures and practices, including using of risk control measures
  • applying sustainable energy principles and practices
  • completing workplace reports and documentation
  • preparing to wind electrical coils
  • winding electrical coils, including:
  • adhering to coil quality and workplace procedures
  • completing workplace report/forms accurately
  • dealing with unplanned events in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • following winding job specifications
  • selecting correct winding wire and insulation
  • setting up and operating winding machine in accordance with safe operating and workplace procedures

Knowledge evidence

  • collecting coil data, including: coil shape, gauge, number of turns, type of wire, coil and insulation
  • coil former types, construction/set up and factors which govern coil shape, including: bore size of stator iron core, coil flexibility, coil shapes, depth of iron below the slots in the iron core, end room, pressure points between the coils, types coil winding formers
  • coil winding machines, including: computer operated, foot pedal, layer winding machine, remote foot switch on a flexible lead, variable speed fitted with a face plate, variable speed, winding head fitted with a chuck
  • coil insulations, including: paper laminates, cloth, tape and adhesive tape (glass); and polyester glass laminate, polyester film, purpose, adhesive tape (polyester film), temperature ratings
  • rewind small and medium-sized solenoid coils, including: strip and record data, prepare/insulate coil formers, wind each type of coil, finishing off process, test procedures
  • types and purpose of testing devices, including: multimeter, insulation resistance tester, wheatstone bridge
  • types of tests, including: continuity, short circuited turns, insulation resistance
  • testing techniques to identify faulty coils, including: physical inspection, using a testing device
  • current industry practices and technologies
  • relevant job safety assessments, risk mitigation processes or operational safety precautions
  • relevant manufacturer specifications
  • relevant WHS/OHS legislated requirements
  • relevant workplace documentation
  • relevant workplace policies and procedures
  • sustainable energy principles and practices

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEEEL0074

What does an assessment tool for UEEEL0074 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEEL0074 needs to address all 41 unit components: 3 elements with 15 performance criteria, 11 performance evidence requirements, 15 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEEEL0074?

Auditori pulls the current release of UEEEL0074 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEEL0074 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEEEL0074 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEEL0074, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEEEL0074 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEEEL0074 free