UEEEC0049Program and commission commercial security closed-circuit television systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for UEEEC0049 must cover

35 assessable components: 3 elements (19 performance criteria), 7 performance evidence and 9 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Prepare to program commercial security CCTV system

  • 1.1WHS/OHS requirements and workplace procedures for a given work area are identified and applied
  • 1.2WHS/OHS risk control measures and workplace procedures are followed in preparation for commercial security CCTV system work
  • 1.3Safety hazards not previously identified are risk assessed, documented and risk control measures devised and implemented in consultation with appropriate person/s
  • 1.4Extent of programming and commissioning is determined from reports, documentation and from discussions with appropriate person/s
  • 1.5Appropriate person/s is consulted to ensure commercial security CCTV system work is coordinated effectively with others involved on the worksite
  • 1.6Tools, equipment and testing devices needed to program commercial security CCTV system are obtained in accordance with workplace procedures and checked for correct operation and safety

2 Program and commission commercial security CCTV system

  • 2.1WHS/OHS risk control measures and workplace procedures for carrying out commercial security CCTV system work are followed
  • 2.2Need to test and measure live work is determined in accordance with WHS/OHS requirements and, as required, conducted within workplace safety procedures
  • 2.3Circuits/machines/plant are checked and isolated in accordance with WHS/OHS requirements and workplace procedures
  • 2.4Security CCTV functions are entered into the commercial security system in accordance with design specifications
  • 2.5Security CCTV devices are checked for correct location and alignment
  • 2.6Security CCTVs are inspected and tested in accordance with commissioning requirements
  • 2.7Sources of CCTV anomalies are identified and corrected
  • 2.8Unplanned situations are responded to in accordance with workplace procedures, discussions with appropriate person/s and job specifications and requirements in a manner that minimises risk to personnel and equipment
  • 2.9Methods for dealing with unplanned situations are selected on the basis of safety and specified work outcomes
  • 2.10Programming and commissioning activities are carried out efficiently without waste of materials or damage to apparatus, the surrounding environment or services using sustainable energy practices

3 Complete and report programming and commissioning activities

  • 3.1WHS/OHS work completion risk control measures and workplace procedures are followed
  • 3.2Worksite is made safe in accordance with workplace safety procedures
  • 3.3'As-installed' security CCTV system is documented and appropriate person/s notified in accordance with workplace procedures

Performance evidence

  • applying relevant work health and safety (WHS)/occupational health and safety (WHS/OHS) requirements, workplace procedures and practices, including using risk control measures
  • applying sustainable energy principles and practices
  • dealing with unplanned events/situations in accordance with workplace procedures in a manner that minimises risk to personnel and equipment
  • documenting ‘as-installed’ system correctly
  • entering system functions using relevant information technology
  • identifying and correcting function anomalies
  • testing closed-circuit television (CCTV) functions.

Knowledge evidence

  • program loading methods, including relevant information technology
  • program testing methods
  • relevant job safety assessments or risk mitigation processes
  • relevant manufacturer specifications
  • relevant WHS/OHS legislated requirements
  • relevant workplace documentation
  • relevant workplace policies and procedures
  • security systems CCTV programming
  • vender programming codes and functions, including: input/output (I/O) instructions, variables, timers, limitations of vender software.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing UEEEC0049

What does an assessment tool for UEEEC0049 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEEEC0049 needs to address all 35 unit components: 3 elements with 19 performance criteria, 7 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for UEEEC0049?

Auditori pulls the current release of UEEEC0049 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEEEC0049 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing UEEEC0049 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEEEC0049, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your UEEEC0049 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate UEEEC0049 free