UEECD0030 — Prepare electrotechnology/utilities drawings using manual drafting and CAD equipment and software
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for UEECD0030 must cover
170 assessable components: 3 elements (14 performance criteria), 13 performance evidence and 143 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan electrotechnology/utilities drawing using manual drafting and CAD equipment and software
- 1.1Work health and safety (WHS)/occupational health and safety (OHS) requirements and workplace procedures are identified and applied
- 1.2Hazards are identified, risks are assessed and control measures are implemented
- 1.3Extent of work is determined from job specifications and discussions with relevant person/s
- 1.4Relevant person/s is consulted to coordinate work
- 1.5CAD software, tools and equipment required for work are obtained in accordance with workplace procedures
2 Prepare electrotechnology/utilities drawing using manual drafting and CAD equipment and software
- 2.1WHS/OHS risk control measures and procedures for carrying out work are followed
- 2.2Design, detailed drawings and layouts required are determined from job specifications
- 2.3Technical data of system components is interpreted to determine parameters included in detailed drawings
- 2.4Relevant CAD software tools are used to produce detailed drawings based on industry standard protocols
- 2.5Detailed drawings are checked for accuracy and compliance with job specifications
- 2.6Unplanned situations are responded to in accordance with workplace procedures and approval with authorised person/s
3 Complete electrotechnology/utilities drawing using manual drafting and CAD equipment and software
- 3.1Completed drawings are submitted to relevant person/s and checked for accuracy and compliance with job specifications
- 3.2Modifications are followed and drawings re-submitted for final approval
- 3.3Completed drawings are filed in accordance with workplace procedures
Performance evidence
- applying modifications to original drawings and resubmitting for approval
- applying relevant work health and safety (WHS)/occupational health and safety (OHS) requirements, including implementing risk control measures
- checking drawings for accuracy and compliance with job specifications
- completing electrotechnology/utilities drawings using manual drafting and computer-aided design (CAD) equipment and software
- determining job specifications from designs, drawings and layouts
- filing completed drawings
- obtaining specifications from design information, customer requirements, sketches, preliminary layouts and/or field investigations
- planning and preparing electrotechnology/utilities drawings using manual drafting and CAD equipment and software
- preparing and modifying preliminary electrotechnology/utilities drawings and diagrams using CAD equipment and software
- responding to unplanned situations
- submitting completed drawings
- using CAD equipment and related computer commands
- working with relevant person/s
Knowledge evidence
- architectural and site plan drawings for electrotechnology/utilities applications, including:
- principles, purpose, terms and conventions usage in basic architectural drawings
- typical scales
- base plan symbols and labels
- electrotechnology/utilities site plan symbols and labels
- signing and markings site plan symbols and labels
- architectural design and planning principles
- elevation drawings
- architectural symbols and abbreviations usage
- floor plans layout and production
- basic construction terminology and materials
- perspectives and pictorials
- typical wall and building sections with necessary details
- applicable building codes
- as-built floor plan measurement, sketching and drafting
- usage of schedules in freehand architectural style lettering
- styles of architecture
- fundamentals and design function in residential design
- site plans production
- foundation plan production
- AutoCAD basics for electrotechnology utilities applications, including:
- operating system fundamentals encompassing principals, concepts and applications of CAD hardware; terms, conventions and codes related to CAD hardware; CAD hardware type and variation; system specifications interpretation and usage; input/output (I/O) devices identification; computer components installation and configuration arrangements and applications
- CAD filing and naming conventions
- opening program, closing and saving drawings
- basic drafting commands encompassing line, circle, spline and rectangle
- basic modification commands encompassing erasing, copy, mirror, block, trim and extend
- layout and plotting
- design centre encompassing electrical symbols and electronic symbols
- AutoCAD and lists
- components and symbols in CAD
- mass storage and file compression
- network operating systems, protocols, and cabling systems
- researching hardware and software
- installation and configuration of operating systems
- plotting solutions
- security issues
- system maintenance
- user interface
- object creation and modification
- editing
- layers
- properties
- paper space and model space concepts
- dimensioning and dimensioning variables
- blocks
- attributes
- three-dimensional construction
- solid modelling and scripts
- library construction
- database manipulation
- data extraction
- circuit simulation
- wiring symbols - motor and generator; alternating current (a.c.) and direct current (d.c.) ; wiring junctions; grounds; distinguishing power and control conductors; normally open and normally closed contacts; series and shunt coils; circuit protection devices - overload relay w/thermal element; fuse and circuit breakers; push button - disconnect switches; momentary contact; maintained contact; meters; resistors; transformers - power, current, potential and auto-transformers
- auxiliary views and revolutions, including:
- principles, concepts and purpose of auxiliary views and revolutions
- terms, conventions and codes related to auxiliary views and revolutions
- rules of revolutions
- types and usage techniques of auxiliary views, auxiliary reference planes and revolutions
- techniques and applications in finding the true size of an oblique surface
- secondary auxiliary view drawing techniques and applications
- applications of revolutions
- usage of the axis of revolution to draw the true shape of an oblique view
- civil/geographic information systems (GIS) drawings fundamentals, including:
- principles, terms and conventions usage in civil GIS drawings
- land surveying techniques (e.g. property line, corners, symbols, coordinates, base line and typical sections)
- GIS and global positioning systems (GPS) uses and applications
- land survey plot production from a written description
- manual and computer methods calculation of area
- contour plans
- profile drawings
- drawing, numbering, file names and digital file storage, including:
- drawing series and version control
- drawing sheet numbering
- drawing file names
- drawing storage
- drawing file
- electrotechnology/utilities drafting fundamentals, including:
- principles, concepts and purpose of electrotechnology/utilities drafting
- terms, conventions and codes related to electrotechnology/utilities drafting
- rules and symbols used in electrotechnology/utilities drafting
- types and usage techniques of electrotechnology/utilities drawings
- techniques and applications for creating graphic symbols charts
- techniques and applications in composing block diagram drawings
- electrotechnology/utilities drawings and diagrams
- electrotechnology/utilities drawings line work, symbols, lettering and techniques production to Australian/New Zealand industry standards, including:
- principles of correct drafting technique
- principles, concepts and purpose of electrotechnology/utilities drawings
- terms, symbols (including sectional symbols), conventions and codes related to electrotechnology/utilities drawings
- rules for drafting electrotechnology/utilities drawings
- types and usage techniques of electrotechnology/utilities drawings
- relationship between components and symbols used in drafting applications
- techniques and applications for production of electrotechnology/utilities drawings
- map drafting, including:
- types and usage techniques of map drafting and illustrated maps
- techniques and applications of plat surveys and set plans
- techniques and applications of contour maps using profile coordinates
- map reading techniques and applications
- map drawing techniques and applications
- pole and structure elevations, including:
- elevation sheet layout
- elevation labelling
- concrete bases
- luminaire pole elevations
- signal pole elevations
- service pole elevations
- sign pole elevations
- sign bridge and cantilever elevations
- breakaway sign structures
- wood post/sign structures
- relevant manufacturer specifications
- relevant WHS/OHS legislated requirements
- relevant workplace documentation
- relevant workplace policies and procedures
- risk control measures
- sketching techniques for electrotechnology/utilities applications, including:
- lines and letters
- shapes
- solids
- axonometric views
- building sketch
- isometric views
- object sketch
- perspective: building interior perspective sketch
- detail labelled sketch
- standard drawing sheets and drawing sheet layout, including:
- standard drawing sheet borders
- standard drawing sheet scale
- standard drawing sheet editing - routine
- standard drawing sheet editing - title block
- standard drawing sheet editing - revision blocks
- drawing sheet layout for small electrotechnology/utilities projects
- drawing sheet layout for large electrotechnology/utilities projects
- drawing sheet layout for signing and markings projects
- key plan sheets
- drawing layers
- line types
- survey base plan drawings, including:
- survey base plan scale
- survey base plan
- survey base plan contents
- model space and paper space
- external reference (xref) drawings
- viewports
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing UEECD0030
What does an assessment tool for UEECD0030 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for UEECD0030 needs to address all 170 unit components: 3 elements with 14 performance criteria, 13 performance evidence requirements, 143 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for UEECD0030?
Auditori pulls the current release of UEECD0030 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for UEECD0030 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing UEECD0030 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of UEECD0030, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- UEECD0001 — Analyse materials for suitability in electrical equipment
- UEECD0002 — Analyse static and dynamic parameters of electrical equipment
- UEECD0003 — Apply industry and community standards to engineering activities
- UEECD0004 — Apply material science to solving electrotechnology engineering problems
- UEECD0005 — Apply physics to solving electrotechnology engineering problems
- UEECD0006 — Apply technologies and concepts to energy sector work activities
- UEECD0007 — Apply work health and safety regulations, codes and practices in the workplace
- UEECD0008 — Carry out preparatory energy sector work activities
- UEECD0009 — Carry out routine work activities in an energy sector environment
- UEECD0010 — Compile and produce an energy sector detailed report
- UEECD0011 — Comply with scheduled and preventative maintenance program processes
- UEECD0012 — Contribute to risk management in electrotechnology systems
Your UEECD0030 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate UEECD0030 free