RIINHB202E — Set up and pack up drill sites
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for RIINHB202E must cover
40 assessable components: 4 elements (21 performance criteria), 7 performance evidence and 9 knowledge evidence requirements, plus 3 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to set up and pack up drill sites
- 1.1Obtain, interpret and confirm work requirements
- 1.2Access, interpret and apply documentation required to set up and pack up drill site and confirm work activity is compliant
- 1.3Identify and minimise environmental issues and potential hazards, and assess and address risks within scope of own role and according to workplace procedures
- 1.4Select and wear personal protective equipment required for work activities
- 1.5Communicate with other personnel on site as required and confirm briefings and handover details are communicated and received
- 1.6Confirm required safety equipment is in working order and rectify or report as required and within scope of own role
- 1.7Erect and observe warning signs and barriers according to site requirements
- 1.8Obtain and interpret emergency procedures and identify steps required in case of fire, accident and other emergencies
- 1.9Store materials according to workplace procedures and safety requirements that minimise hazards and contamination
2 Assist driller to set up drill rig
- 2.1Carry out instructions on work scheduling in logical sequence
- 2.2Assist unloading rig and equipment and confirm no damage has occurred
- 2.3Set out required tools and equipment
- 2.4Take required weather precautions for equipment and stores
3 Prepare and dismantle ancillary equipment
- 3.1Set up ancillary equipment according to operational requirements
- 3.2Provide connecting services to and from equipment
- 3.3Carry out prestart checks and shutdown procedures
- 3.4Dismantle ancillary equipment according to operational requirements
4 Pack up drill site
- 4.1Complete site housekeeping to workplace requirements
- 4.2Load and secure equipment as directed and according to safety requirements
- 4.3Remove waste and unwanted materials from site according to environmental requirements and workplace procedures
- 4.4Clean, maintain and store tools and equipment
Performance evidence
- set up and pack up drill sites on at least two occasions, including:
- erecting and observing warning signs and barriers
- setting up and dismantling at least three ancillary equipment from the following: compressor, pumps, grout pump, mixing tanks, sample collection hopper/skip, support vehicle, water tank, temporary reservoirs and pipelines, high frequency (HF) radio aerial, microwave dish, cyclones, sample storage, down hole test or installation equipment (packers, survey, water pressure test equipment, sampling devises), core boxes, drill string components tools
- connecting services to and from equipment.
- locate and apply documentation required for setting up and packing up drill sites
- implement the requirements, procedures and techniques for completing the setting up and packing up of drill sites, including: identifying, managing and reporting all potential hazards, testing working order of equipment, applying manual and mechanical handling techniques, communicating using hand signals for vehicle positioning and mast raising, decontaminating rig and equipment if required, maintaining equipment, cleaning, digging and protecting mud pits and drains as required for drilling method
- work with others to set up and pack up drill sites that meet required outcomes, including: complying with reporting requirements and procedures, communicating with others to receive and clarify work instructions, communicating with others to meet coordination requirements throughout work activities.
Knowledge evidence
- key policies, procedures and established requirements for setting up and packing up drill sites, including those for: work health and safety, emergencies
- relevant environmental practices, including those for: reducing contamination and pollution, containing, dispersing and disposing of waste fluids
- equipment operation and maintenance
- unloading equipment
- storing and handling hazardous substances
- alignment requirements for setting up drill
- basic geology
- hazards relevant to setting up and packing up drill sites
- drilling team roles and objectives.
Foundation skills
- Oral Communication: Listens to short, explicit instructions for work procedures and asks questions to clarify and confirm
- Writing: Produces and completes workplace reports using appropriate vocabulary, grammatical structures and conventions
- Self-management: Monitors and minimises own exposure to worksite hazards during activities
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing RIINHB202E
What does an assessment tool for RIINHB202E need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for RIINHB202E needs to address all 40 unit components: 4 elements with 21 performance criteria, 7 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for RIINHB202E?
Auditori pulls the current release of RIINHB202E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for RIINHB202E — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing RIINHB202E assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of RIINHB202E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- RIINHB201E — Load, secure and unload drilling equipment and materials
- RIINHB203E — Support drilling processes
- RIINHB205F — Assist continuous flight auger drilling
- RIINHB206E — Assist large diameter auger drilling
- RIINHB208E — Assist diamond core drilling
- RIINHB210E — Assist surface directional drilling
- RIINHB211E — Assist mud rotary drilling
- RIINHB217E — Assist horizontal direction drilling
- RIINHB218E — Assist grouting and cementing operations
- RIINHB219E — Assist with reverse circulation drilling
- RIINHB220 — Assist coil tube drilling
- RIINHB221 — Assist rotary air drilling
Your RIINHB202E assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate RIINHB202E free