PMBPROD367ERemove and replace conveyor belts

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for PMBPROD367E must cover

33 assessable components: 5 elements (23 performance criteria), 1 performance evidence and 7 knowledge evidence requirements, plus 2 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan for conveyor belt replacement

  • 1.1Review belt specifications and work order documentation to plan for replacement
  • 1.2Perform pre-operational checks including checking for and controlling hazards
  • 1.3Review plan to ensure downtime is minimised, materials are used economically and quality standards are met
  • 1.4Obtain required permissions and permits
  • 1.5Confirm availability of required equipment, tools and materials and follow procedures to check them for condition, quality and compliance tags
  • 1.6Ensure that safe work area has been established according to workplace procedures

2 Remove and replace conveyor belt

  • 2.1Examine conveyor system for existing and potential sources of belt damage
  • 2.2Facilitate removal of conveyed materials from belt according to workplace procedures
  • 2.3Ensure conveyor equipment is disengaged and locked out according to equipment instructions
  • 2.4Remove tension from belt according to equipment instructions
  • 2.5Set up equipment to appropriately support removal and replacement of belt, without unnecessary twisting or bending
  • 2.6Remove existing belt and track replacement belt onto rollers
  • 2.7Store removed belt according to workplace procedures
  • 2.8Follow procedures to correctly splice new belt

3 Commission conveyor belt

  • 3.1Inspect belt condition for imperfections or irregularities
  • 3.2Start up and monitor conveyor according to equipment startup procedures
  • 3.3Monitor and adjust tracking, speed and tensions to ensure correct operation

4 Shut down conveyor belt in emergency

  • 4.1Observe belt in operation and identify conditions that may require emergency shutdown of equipment
  • 4.2Give notice of any impending shutdown to relevant personnel
  • 4.3Follow workplace shutdown procedures

5 Clean work area

  • 5.1Clean work area and return to approved condition
  • 5.2Apply waste management strategies to collect waste to be disposed of or recycled according to workplace procedures
  • 5.3Accurately complete workplace documentation

Performance evidence

  • remove and replace conveyor belts at least once to meet plan and quality standards.

Knowledge evidence

  • the functions and operating principles of conveyor systems and ancillary equipment
  • the stresses and tensions on working belts and common causes of failure
  • types and application of joining methods
  • impact of incorrect or faulty joining processes
  • equipment certification requirements applicable to belt removal and replacement
  • organisational procedures relevant to the work environment or job role, including procedures for the emergency shutdown of equipment
  • hazards that may arise in the job or work environment, and: their possible causes, potential consequences, appropriate risk controls.

Foundation skills

  • Reading: to interpret job and equipment specifications and workplace procedures.
  • Writing and oral communication: to record and report on emergency shutdown requirements and process control variances.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing PMBPROD367E

What does an assessment tool for PMBPROD367E need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for PMBPROD367E needs to address all 33 unit components: 5 elements with 23 performance criteria, 1 performance evidence requirements, 7 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for PMBPROD367E?

Auditori pulls the current release of PMBPROD367E from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for PMBPROD367E — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing PMBPROD367E assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of PMBPROD367E, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your PMBPROD367E assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate PMBPROD367E free