NWPSOU006 — Develop and manage a flood plan
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for NWPSOU006 must cover
42 assessable components: 4 elements (19 performance criteria), 10 performance evidence and 13 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare for flood operations
- 1.1Access and interpret historical rainfall run-off and flooding regimes of specific catchments
- 1.2Collate and analyse simulated, hypothetical and estimated rainfall intensity data and model catchment
- 1.3Estimate and record flood levels, extents and flow rates
- 1.4Identify and interpret storage asset specifications including regulatory requirements, industry standards and workplace procedures
- 1.5Identify resources, environment and stakeholders at risk during a flood event
2 Develop a flood plan
- 2.1Consult with stakeholders to obtain input for flood planning
- 2.2Develop and document a plan for managing the flood impact on a storage asset
- 2.3Confirm performance measures for flood operations
- 2.4Develop plan components and activities for implementation
- 2.5Develop a flood plan according to relevant legislation, industry standards, workplace procedures and environmental requirements
3 Monitor and evaluate flood plan
- 3.1Assess and record a flood event according to industry standards and workplace procedures
- 3.2Evaluate the roles of storage and retarding basins safety and flood attenuation strategies
- 3.3Evaluate current flood classifications and impacts according to flood plan
- 3.4Formulate planning controls for flood plain and waterway management
- 3.5Evaluate current flood warning systems according to flood plan
- 3.6Recommend and develop changes to existing flood plain and waterway management controls and warning systems
4 Report on implementation of the plan
- 4.1Collate, analyse and record information according to workplace procedures
- 4.2Prepare and present reports to relevant persons
- 4.3Communicate findings and recommendations to stakeholders according to workplace procedures and relevant regulations
Performance evidence
- analysing and developing flood mitigation warning systems and strategies
- analysing, interpreting and modelling flood data
- assessing and recording a flood event
- communicating flood planning findings with stakeholders and relevant persons
- developing a flood plan including documenting an implementation plan
- developing a flood plan including identifying plan components and activities for completion
- developing a flood plan including specifying environmental requirements
- developing critical flood warning systems
- developing strategies to mitigate the impact of potential future floods
- identifying and interpreting storage asset specifications
Knowledge evidence
- catchment hydrology principles including the roles of retarding basins
- catchment hydrology principles including the roles of safety and flood attenuation strategies
- catchment hydrology principles including the roles of water storage
- current flood classifications and flood warning systems
- performance measures for flood operations
- relevant documentation associated with developing and managing a flood plan including industry standards
- relevant documentation associated with developing and managing a flood plan including workplace procedures
- relevant legislation and regulatory requirements associated with developing and managing a flood plan including by-laws
- relevant legislation and regulatory requirements associated with developing and managing a flood plan including environmental legislation
- relevant legislation and regulatory requirements associated with developing and managing a flood plan including work health and safety (WHS) legislation
- relevant legislation and regulatory requirements associated with developing and managing a flood plan including planning schemes
- storage asset specifications
- water flow measurement and flow routing models
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing NWPSOU006
What does an assessment tool for NWPSOU006 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for NWPSOU006 needs to address all 42 unit components: 4 elements with 19 performance criteria, 10 performance evidence requirements, 13 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for NWPSOU006?
Auditori pulls the current release of NWPSOU006 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for NWPSOU006 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing NWPSOU006 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of NWPSOU006, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
Your NWPSOU006 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate NWPSOU006 free