LGAOPS002Prepare site for new operational works

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for LGAOPS002 must cover

67 assessable components: 4 elements (15 performance criteria), 12 performance evidence and 36 knowledge evidence requirements, plus 4 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Commence preparation for operational works.

  • 1.1Interpret operational works plans to identify site preparation requirements.
  • 1.2Select, use and maintain personal protective equipment according to safety requirements.
  • 1.3Check Dial Before You Dig (DBYD) information to identify utilities.
  • 1.4Identify and report site risks and hazards according to organisational policies and procedures.

2 Establish site facilities.

  • 2.1Set up amenities and storage areas for tools, equipment and materials convenient to operational works area.
  • 2.2Establish site security to protect assets during operational works.
  • 2.3Inspect operational works site to confirm compliance with workplace health and safety (WHS) requirements.

3 Prepare operational works area.

  • 3.1Set out survey levels and lines according to operational works plans.
  • 3.2Locate identified services and tag for relocation, termination and suspension as required to meet operational works plans.
  • 3.3Complete demolition, clearing and removal of materials according to operational works plans.

4 Plan and close-down operational works.

  • 4.1Identify location of operational works elements from operational works plans.
  • 4.2Determine sequence of work from operational works plans.
  • 4.3Select tools, equipment and materials required to complete work tasks.
  • 4.4Document operational works schedule according to organisational policies and procedures.
  • 4.5Plan for the cleaning and rehabilitation of the site area on decamping.

Performance evidence

  • prepare one site for new operational works involving:
  • scheduling of work
  • interpreting Dial Before You Dig (DBYD) information
  • setting up of required amenities
  • protecting of assets
  • setting out of survey levels and lines
  • demolishing and removing material
  • closing-down site
  • tagging services for:
  • relocation
  • termination
  • suspension

Knowledge evidence

  • organisational policies and procedures applicable to preparing sites for operational works
  • workplace health and safety requirements, including personal protective equipment, applicable to preparing sites for operational works
  • state and local environmental requirements relevant to completion of operational works
  • purpose and contents of operational works plans:
  • specifications
  • sequence of work
  • drawings
  • instructions
  • function and safe use of equipment:
  • angular measuring tools
  • data downloaders
  • distance measuring tools
  • personal protective gear
  • prisms
  • plumb bobs
  • tripods
  • tribraches
  • theodolite
  • steel bands
  • rods
  • total station data recorders
  • Dial Before You Dig (DBYD) requirements
  • techniques for setting up amenities and storage areas
  • techniques for setting up site security requirements
  • techniques for demolition, clearing and removal of materials
  • techniques for calculating material weights, volumes, ratios and quantities
  • local geographical soil structure
  • types of surveys:
  • aerial
  • construction
  • subdivision
  • route location and earthworks
  • topographic
  • hydrographic and elements of photogrammetry
  • traditional
  • total work station

Foundation skills

  • Reading skills: interpret operational works plans including specifications, sequence of work, drawings and instructions.
  • Writing skills: document operational works schedule.
  • Numeracy skills: interpret mathematical information in operational Dial Before You Dig and works plans including specifications, sequence of work, drawings and instructions sequence and schedule work tasks calculate material weights, volumes, ratios and quantities.
  • Planning and organising skills: prioritise and schedule work.

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing LGAOPS002

What does an assessment tool for LGAOPS002 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for LGAOPS002 needs to address all 67 unit components: 4 elements with 15 performance criteria, 12 performance evidence requirements, 36 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for LGAOPS002?

Auditori pulls the current release of LGAOPS002 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for LGAOPS002 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing LGAOPS002 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of LGAOPS002, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.