ICTTEN210 — Install underground telecommunications infrastructure
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for ICTTEN210 must cover
54 assessable components: 4 elements (27 performance criteria), 3 performance evidence and 17 knowledge evidence requirements, plus 7 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to install underground infrastructure
- 1.1Access, read, interpret and confirm work plans/specifications
- 1.2Identify and confirm as required, relevant legislation, regulations, industry standards and enterprise requirements
- 1.3Verify scope of work can be carried out without damaging any existing infrastructure such as underground services
- 1.4Set-up worksite to ensure public and worker safety according to enterprise requirements
- 1.5Select equipment/tools for work activities and ensure their operational status
- 1.6Identify, confirm and apply enterprise environmental protection requirements
- 1.7Select and wear correct personal protective equipment (PPE) appropriate for work activities
- 1.8Identify potential hazards, assess risks, implement risk control measures
- 1.9Obtain and follow emergency procedures
2 Set out and excavate
- 2.1Prepare work area and materials
- 2.2Determine and apply dewatering requirements
- 2.3Determine location, alignment direction, level and grade of incoming infrastructure
- 2.4Set out works according to specifications
- 2.5Advise plant operator of excavation requirements and monitor levels
- 2.5Install trench support or batters as required
- 2.6Install bedding for underground structures
3 Install underground infrastructure
- 3.1Lower materials and place in position
- 3.2Join conduits, manhole and ducts
- 3.3Continually check alignment level and grade
- 3.4Position side support and/or overlay beside pipes
- 3.5Check pipeline system support structure
- 3.6Monitor backfill procedure and ensure work is completed according to enterprise requirements
- 3.7Construct underground infrastructure and follow test procedures to establish functionality and serviceability
4 Clean up
- 4.1Clear work area and dispose of or recycle materials according to enterprise requirements
- 4.2Clean, check, maintain and store plant, tools and equipment
- 4.3Record and report test results on plans as-built
- 4.4Update Dial Before You Dig database as required
Performance evidence
- apply techniques for the safe, effective and efficient installation of underground telecommunications infrastructure including: problem-solving and troubleshooting techniques
- diagnostic techniques
- complete an underground telecommunications infrastructure that meets all of the required outcomes
Knowledge evidence
- hazard identification, risk assessment and response
- job safety analysis (JSA)/ job safety and environment analysis (JSEA)/safe work method statements
- project quality measures
- excavation/trench safety
- confined space entry
- site dewatering
- afety data sheets and material handling methods
- civil construction terminology
- manholes, large pits, conduits, ducts
- inspection covers and minor structures
- pipe joins
- concrete fabrication
- sedimentation and erosion controls
- worksite engineering drawings
- types, characteristics, technical capabilities and limitations of equipment related to work activity
- site isolation and traffic control responsibilities and authorities
- relevant enterprise policies and procedures
Foundation skills
- Reading: Interprets textual information from plans, specifications, standards and regulations to identify relevant and key information
- Writing: Documents outcomes and changes to plans using industry relevant terminology and recognised plan symbols Prepares documentation and correspondence using clear language and correct spelling and terminology
- Oral Communication: Uses collaborative and inclusive techniques, including active listening and questioning, to convey and clarify information and to confirm understanding Clearly explains detailed information using language, tone and pace appropriate to the audience
- Numeracy: Makes calculations appropriate for measuring site for excavation
- Navigate the world of work: Accepts responsibility and ownership for the task, and makes decisions on completion parameters and the need for coordination with others Identifies and acts on issues that contravene relevant policies, procedures and legal requirements
- Interact with others: Uses a range of strategies and reads verbal and non-verbal signals, establishes a sense of connection and builds rapport with customers and co-workers
- Get the work done: Takes responsibility for planning, sequencing and prioritising tasks and own workload for efficiency and effective outcomes Accepts responsibility for addressing less predictable problems and initiates procedures in response, applying problem solving processes in determining a solution
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing ICTTEN210
What does an assessment tool for ICTTEN210 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for ICTTEN210 needs to address all 54 unit components: 4 elements with 27 performance criteria, 3 performance evidence requirements, 17 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for ICTTEN210?
Auditori pulls the current release of ICTTEN210 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for ICTTEN210 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing ICTTEN210 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of ICTTEN210, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- ICTTEN202 — Use hand and power tools
- ICTTEN203 — Install and configure a home or small office network
- ICTTEN204 — Install and configure a small to medium business network
- ICTTEN205 — Build and maintain a secure network
- ICTTEN206 — Operate new media software packages
- ICTTEN207 — Install and test internet protocol devices in convergence networks
- ICTTEN208 — Use electrical skills when working with telecommunications networks
- ICTTEN211 — Work effectively in a telecommunications network environment
- ICTTEN301 — Provide infrastructure for telecommunications network equipment
- ICTTEN310 — Remove and replace electronic circuit boards in carrier equipment
- ICTTEN312 — Install telecommunications network equipment
- ICTTEN313 — Work on and resolve recurrent network faults
Your ICTTEN210 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate ICTTEN210 free