DEFSIM015Fault find and repair simulator power distribution and control systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for DEFSIM015 must cover

34 assessable components: 5 elements (16 performance criteria), 9 performance evidence and 9 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Receive and analyse fault report

  • 1.1Receive and analyse simulator power distribution and control system fault report
  • 1.2Identify and select appropriate fault finding method(s) that will apply across the range of power distribution and control systems
  • 1.3Prepare the simulator systems power distribution and control system for fault finding, including the isolation of all energy sources

2 Identify and find fault

  • 2.1Apply fault finding method(s)
  • 2.2Identify and analyse fault indicators
  • 2.3Identify the power distribution and control system fault
  • 2.4Confirm that the fault is the one initially reported

3 Repair fault

  • 3.1Identify and confirm cause of fault
  • 3.2Identify and confirm repair method(s)
  • 3.3Complete power distribution and control systems repair
  • 3.4Conduct post repair safety check
  • 3.5Restart simulator systems power distribution and control system

4 Conduct functional test

  • 4.1Test simulator systems power distribution and control systems to ensure operational integrity
  • 4.2Confirm operational parameters

5 Finalise repair process

  • 5.1Finalise simulator systems power distribution and/or control system repair reports including a detailed synopsis of the fault and the repair process and any certification requirements
  • 5.2Report the operational status of the simulator systems power distribution and control system

Performance evidence

  • undertaking research and analysis related to simulator power distribution and control systems
  • following logical fault finding techniques
  • using measuring instruments such as megaohmeters, multimeters, cathode ray oscilloscopes (CRO), 240-415v portable appliance testers, 240-415v phase angle meters and 240-415v clamp meters
  • applying simulator power distribution and control systems repair methodologies
  • following configuration management processes
  • using appropriate information technology and software including general online diagnostic tools and proprietary simulator management databases
  • identifying, reviewing and analysing information that may impact on the simulator power distribution and control systems fault finding
  • conducting simulator power distribution and control systems functional testing
  • negotiating and communicating with key stakeholders

Knowledge evidence

  • operational capabilities and limitations of the relevant simulator
  • operational capabilities and limitations of the relevant simulator power distribution and control systems
  • simulator operating modules comprising the simulator system being worked on
  • fault indicators related to the simulator power distribution and control systems being worked on
  • repair methodologies related to the simulator power distribution and control systems being worked on
  • legislative and regulatory requirements related to the simulator being worked on
  • organisational policy and procedures related to the relevant simulator power distribution and control systems
  • configuration management related to the simulator power distribution and control systems being worked on
  • product knowledge related to systems and/or equipment in service

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing DEFSIM015

What does an assessment tool for DEFSIM015 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for DEFSIM015 needs to address all 34 unit components: 5 elements with 16 performance criteria, 9 performance evidence requirements, 9 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for DEFSIM015?

Auditori pulls the current release of DEFSIM015 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for DEFSIM015 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing DEFSIM015 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of DEFSIM015, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your DEFSIM015 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate DEFSIM015 free