CPCPPS5028 — Design trade waste pre-treatment systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPPS5028 must cover
260 assessable components: 4 elements (25 performance criteria), 13 performance evidence and 222 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Evaluate design parameters.
- 1.1Establish scope of work for trade waste pre-treatment systems prior to discharge to authority’s point of sewer connection.
- 1.2Establish performance requirements considering safety of system users or building occupants.
- 1.3Determine design requirements from relevant Australian Standards, codes, plans, specifications, authorities’ requirements and client brief.
- 1.4Apply sustainability principles and concepts as part of the design process.
- 1.5Interpret manufacturer requirements and trade and technical manuals.
- 1.6Conduct research to outline design parameters.
- 1.7Analyse trade waste applications and conduct a cost-benefit analysis to compare a range of pipe materials and system designs.
2 Plan and detail system components.
- 2.1Plan layout of pipework systems including type and location of fittings and controls.
- 2.2Plan and detail solid removal systems.
- 2.3Plan and detail grease and oil interceptors, neutralising chambers and wash-down areas incorporating stormwater exclusion.
- 2.4Plan and detail diffused air flotation systems.
- 2.5Detail bacterial treatment processes and combined and specialised treatment processes for a range of commercial and industrial applications.
- 2.6Incorporate general housekeeping procedures to minimise discharge of trade waste.
- 2.7Perform system calculations for a range of applications.
- 2.8Size and detail pump well, pumps, controls and equipment requirements.
- 2.9Design pipe supports for a range of applications.
- 2.10Specify approved materials, jointing methods and installation requirements for trade waste pre-treatment systems.
3 Design and size systems.
- 3.1Design and size trade waste pre-treatment systems for commercial and industrial premises.
- 3.2Design and size trade waste pre-treatment systems using calculations and local authorities and regulators’ policies and requirements.
- 3.3Design flow monitoring systems for trade waste applications.
- 3.4Design venting of trade waste systems to comply with local authority requirements.
4 Prepare documentation.
- 4.1Produce a return client brief of the preferred design.
- 4.2Prepare plans and specifications for trade waste pre-treatment systems.
- 4.3Prepare testing and commissioning schedule.
- 4.4Produce operation and maintenance manual including information on how to properly and safely maintain the system.
Performance evidence
- designing, sizing and documenting the installation and layout details for two trade waste pre-treatment systems from the following:
- chemical facilities
- commercial kitchen
- commercial and industrial facilities that produce a liquid waste stream
- commercial and industrial laundry
- food preparation facilities
- laboratories
- motor vehicle workshops
- photography development facilities
- commercial swimming pool
- wash-down facilities
- preparing plans and specifications to industry standards for both selections
- documenting the evaluation of design parameters including client, regulatory, manufacturer and relevant Australian Standard requirements for each design.
Knowledge evidence
- hazards associated with devices and systems used in the hydraulic sector
- design of the options for the pre-treatment of trade waste
- approved installation methods for trade waste pre-treatment systems
- key features of work plans and specifications
- nature of materials and effect of their performance in a variety of conditions
- organisational quality procedures and processes
- terminology and definitions used in hydraulic design
- work health and safety (WHS) requirements, including relevant statutory regulations, codes and standards
- scope of work: interpreting plans and specifications
- scope of work: sizing and documenting layout of trade waste pre-treatment systems for commercial and industrial applications
- design requirements: architectural plans
- design requirements: building specifications
- design requirements: cleaning and maintenance procedures
- design requirements: installation requirements
- design requirements: odour control
- design requirements: owner requirements
- design requirements: pipework identification
- design requirements: sizing
- design requirements: trade waste treatment
- design requirements: ventilation
- statutory and regulatory requirements and relevant Australian Standards and codes which may include: AS/NZS 3500 Plumbing and drainage set
- statutory and regulatory requirements and relevant Australian Standards and codes which may include: AS 2200 Design charts for water supply and sewerage
- statutory and regulatory requirements and relevant Australian Standards and codes which may include: Commonwealth, state or territory and local governments requirements
- statutory and regulatory requirements and relevant Australian Standards and codes which may include: National Construction Code (NCC)
- statutory and regulatory requirements and relevant Australian Standards and codes which may include: utility provider’s trade waste regulations
- statutory and regulatory requirements and relevant Australian Standards and codes which may include: other relevant Australian Standards and codes
- trade waste applications: chemical facilities
- trade waste applications: commercial kitchen
- trade waste applications: commercial and industrial facilities that produce a liquid waste stream
- trade waste applications: commercial and industrial laundry
- trade waste applications: food preparation facilities
- trade waste applications: laboratories
- trade waste applications: motor vehicle workshops
- trade waste applications: photography development facilities
- trade waste applications: commercial swimming pool
- trade waste applications: wash-down facilities
- cost-benefit analysis comparisons: design styles
- cost-benefit analysis comparisons: energy costs
- cost-benefit analysis comparisons: expected design life
- cost-benefit analysis comparisons: labour costs
- cost-benefit analysis comparisons: material costs
- cost-benefit analysis comparisons: safety factors
- cost-benefit analysis comparisons: speed of installation
- cost-benefit analysis comparisons: suitable materials
- cost-benefit analysis comparisons: authorities’ requirements
- manufacturer requirements: containment
- manufacturer requirements: design and installation
- manufacturer requirements: installation space
- manufacturer requirements: material specifications
- manufacturer requirements: pipe sizing
- manufacturer requirements: pump installation
- manufacturer requirements: storage systems
- manufacturer requirements: technical and trade manuals
- manufacturer requirements: ventilation
- information gathered through desk top study to support design purposes: architectural and building plans
- information gathered through desk top study to support design purposes: developer plans
- information gathered through desk top study to support design purposes: manufacturer data
- information gathered through desk top study to support design purposes: building applications
- information gathered through desk top study to support design purposes: brochures
- information gathered through desk top study to support design purposes: forms
- information gathered through desk top study to support design purposes: policies
- information gathered through desk top study to support design purposes: reports
- performance requirements to: establish acceptable discharge standards for the relevant authority
- performance requirements to: comply with relevant Australian Standards, codes and local authorities’ requirements
- layout of pipework systems: location of pipework (fire rating of enclosure)
- layout of pipework systems: trade waste plumbing and drainage
- layout of pipework systems: pumped systems
- layout of pipework systems: accessibility
- layout of pipework systems: designing to not unduly affect building integrity and aesthetic appeal
- layout of pipework systems: designing to include principles of economy, serviceability, durability and fit for use
- fittings: bends
- fittings: junctions
- fittings: reflux valves
- fittings: inspection openings
- fittings: expansion joints
- solid removal systems which remove: bone
- solid removal systems which remove: dirt
- solid removal systems which remove: grit
- solid removal systems which remove: metal
- solid removal systems which remove: paper
- solid removal systems which remove: plastic
- solid removal systems which remove: rubbish
- solid removal systems which remove: sand
- solid removal systems which remove: silt
- solid removal systems which remove: wood
- solid removal systems which remove: other solid contaminants
- grease and oil interceptors: coalescing plate separators (CPS)
- grease and oil interceptors: vertical gravity separators (VGS)
- grease and oil interceptors: dissolved air flotation (DAF)
- grease and oil interceptors: grease arrestors
- grease and oil interceptors: skimmers
- neutralising chambers which neutralise: acid
- neutralising chambers which neutralise: alkaline
- neutralising chambers which neutralise: chemicals
- wash-down areas: bin
- wash-down areas: commercial and industrial wash-down processes that may or may not require stormwater diversion
- wash-down areas: floor
- wash-down areas: vehicle
- wash-down areas: machinery
- bacterial treatment processes: aerobic
- bacterial treatment processes: anaerobic
- bacterial treatment processes: facultative and specialised bacteria for the removal of grease and other contaminants
- combined and specialised treatment processes: bacterial treatment
- combined and specialised treatment processes: cooling pits
- combined and specialised treatment processes: diffused air flotation systems
- combined and specialised treatment processes: neutralising chambers
- combined and specialised treatment processes: solid removal systems
- combined and specialised treatment processes: specialised treatment
- system calculations: calculating gradient
- system calculations: interpreting design charts and tables
- system calculations: calculating pipe sizing
- system calculations: calculating reduced level
- system calculations: determining flow and fixture loadings
- system calculations: sizing treatment system
- system calculations: storage tank capacity
- pump well, pumps, controls and equipment requirements: access covers
- pump well, pumps, controls and equipment requirements: automatic controls
- pump well, pumps, controls and equipment requirements: capacity
- pump well, pumps, controls and equipment requirements: chains
- pump well, pumps, controls and equipment requirements: corrosion-resistant materials
- pump well, pumps, controls and equipment requirements: detailing
- pump well, pumps, controls and equipment requirements: emergency storage
- pump well, pumps, controls and equipment requirements: high and low-level water controls and alarms
- pump well, pumps, controls and equipment requirements: impeller sizing
- pump well, pumps, controls and equipment requirements: inlet and outlet design requirements
- pump well, pumps, controls and equipment requirements: installation and mounting requirements
- pump well, pumps, controls and equipment requirements: ladder access
- pump well, pumps, controls and equipment requirements: odour control
- pump well, pumps, controls and equipment requirements: macerator requirements
- pump well, pumps, controls and equipment requirements: pump selection
- pump well, pumps, controls and equipment requirements: pump sizing
- pump well, pumps, controls and equipment requirements: pump well sizing
- pump well, pumps, controls and equipment requirements: space requirements
- pump well, pumps, controls and equipment requirements: step irons
- pump well, pumps, controls and equipment requirements: valve requirements
- pump well, pumps, controls and equipment requirements: ventilation
- pump well, pumps, controls and equipment requirements: warning system
- pipe supports: anchors
- pipe supports: bedding
- pipe supports: bracket spacing
- pipe supports: concrete support
- pipe supports: corrosion protection
- pipe supports: cover
- pipe supports: hanging brackets
- pipe supports: manufacturer-recommended specific fixings
- pipe supports: material requirements
- pipe supports: saddles
- pipe supports: provision for expansion
- pipe supports: wall and ceiling brackets
- materials: pipes: cast iron or epoxy lined
- materials: pipes: earthenware or vitrified clay pipe (VCP)
- materials: pipes: polyethylene (PE)
- materials: pipes: polypropylene (PP)
- materials: pipes: other approved material
- materials: fittings and fixtures, including sound attenuation requirements
- jointing methods: electrofusion welding
- jointing methods: mechanical joints
- jointing methods: rubber ring
- jointing methods: threading
- installation requirements: bedding
- installation requirements: fire rating
- installation requirements: level of workmanship
- installation requirements: manufacturer-recommended specific fixings
- installation requirements: pipe support
- installation requirements: provision for expansion
- installation requirements: serviceability and access
- pipe protection: cover
- pipe protection: corrosion
- pipe protection: impact
- computer software packages including: proprietary design software
- computer software packages including: manufacturer software
- methods of applying sustainability principles and concepts: selecting appropriate material to ensure minimal environmental impact
- methods of applying sustainability principles and concepts: efficient use of material
- methods of applying sustainability principles and concepts: efficient energy usage/capital outlay comparison
- methods of applying sustainability principles and concepts: effect on the environment due to overflow or leakage
- methods of applying sustainability principles and concepts: material selected to convey the type of discharge
- methods of applying sustainability principles and concepts: water efficiency
- types of plans: axonometrics
- types of plans: cross-sections
- types of plans: details
- types of plans: elevations
- types of plans: isometrics
- types of plans: sections
- types of plans: schematics produced using: computer generation
- types of plans: schematics produced using: drawing equipment
- specification: access chambers (manholes)
- specification: bedding
- specification: commissioning
- specification: concrete support and detailing specialised components
- specification: jointing
- specification: manufacturer requirements
- specification: materials
- specification: pumps
- specification: WHS
- specification: support
- specification: testing
- specification: workmanship
- testing for: air pressure
- testing for: compliance with authorities’ discharge requirements
- testing for: drainage inspection
- testing for: hydrostatic
- testing for: performance
- testing for: quality assurance (QA) audit
- commissioning schedule information: checking for foreign material
- commissioning schedule information: checking system defects
- commissioning schedule information: checking that system functions as per design
- commissioning schedule information: containment
- commissioning schedule information: leak check
- commissioning schedule information: operational commissioning
- commissioning schedule information: pump commissioning
- commissioning schedule information: system certification
- commissioning schedule information: treatment system commissioning
- operation and maintenance manual information: as installed drawings
- operation and maintenance manual information: certification documentation
- operation and maintenance manual information: results of commissioning test
- operation and maintenance manual information: maintenance schedules
- operation and maintenance manual information: manufacturer brochures and technical information
- operation and maintenance manual information: odour control
- operation and maintenance manual information: regular treatment system maintenance
- operation and maintenance manual information: regular water quality testing
- operation and maintenance manual information: ventilation
- operation and maintenance manual information: water auditing.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPPS5028
What does an assessment tool for CPCPPS5028 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPPS5028 needs to address all 260 unit components: 4 elements with 25 performance criteria, 13 performance evidence requirements, 222 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPPS5028?
Auditori pulls the current release of CPCPPS5028 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPPS5028 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPPS5028 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPPS5028, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPPS5000 — Design gas bulk storage systems
- CPCPPS5001 — Design industrial gas systems
- CPCPPS5002 — Design gas reticulation systems
- CPCPPS5014 — Locate and maintain piping systems
- CPCPPS5015 — Inspect plumbing and drainage systems
- CPCPPS5023 — Design solar water heating systems
- CPCPPS5024 — Conduct a water audit and identify water-saving initiatives
- CPCPPS5025 — Design grey water re-use systems
- CPCPPS5026 — Design rainwater collection, storage, distribution and re-use systems
- CPCPPS5027 — Design irrigation systems
- CPCPPS5030 — Design pump systems
- CPCPPS5032 — Design siphonic stormwater drainage systems
Your CPCPPS5028 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPPS5028 free