CPCPCM5010 — Design complex sanitary plumbing and drainage systems
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCPCM5010 must cover
224 assessable components: 4 elements (23 performance criteria), 10 performance evidence and 191 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Evaluate design parameters.
- 1.1Establish scope of work for complex sanitary plumbing and drainage systems for wide-span and high-rise building projects.
- 1.2Determine design requirements from relevant Australian Standards, codes, plans, specifications and client brief.
- 1.3Interpret statutory and regulatory requirements for the design of complex sanitary plumbing and drainage systems.
- 1.4Analyse and apply Australian Standards and codes for the design of complex sanitary plumbing and drainage systems.
- 1.5Interpret manufacturer requirements and trade and technical manuals.
- 1.6Conduct additional research, including a desktop study to outline design parameters.
- 1.7Conduct a cost–benefit analysis comparing a range of pipe materials and system designs.
2 Plan and detail system components.
- 2.1Plan layout of pipework systems, type and location of fittings and valves.
- 2.2Assess existing utilities services capacity and sizes.
- 2.3Calculate pipe sizes, pipe grades and trapping and ventilation requirements for a range of applications.
- 2.4Plan pipe support for a range of applications.
- 2.5Size and detail pump well, pump and pump control requirements.
- 2.6Specify approved materials, jointing methods and installation requirements for complex sanitary plumbing and drainage systems.
- 2.7Plan and detail acoustic performance of the sanitary plumbing and drainage system within the system design.
3 Design and size systems.
- 3.1Design complex sanitary plumbing and drainage systems for a range of wide-span and high-rise building applications.
- 3.2Design rising main systems.
- 3.3Design and size a fully vented or fully vented modified system.
- 3.4Design and size a reduced velocity aerator stack system.
- 3.5Design and size complex sanitary plumbing and drainage systems using computer-aided design and drafting packages.
4 Prepare documentation.
- 4.1Prepare client brief of the preferred design.
- 4.2Prepare plans and specifications for a range of complex sanitary plumbing and drainage systems.
- 4.3Prepare testing and commissioning schedule.
- 4.4Produce operation and maintenance manual.
Performance evidence
- designing, sizing and documenting the layout details of complex sanitary systems for a 25-metre high-rise mixed development building inclusive of a basement, using two approved sanitary plumbing systems, including:
- fixtures on each level
- specification and plans which include:
- inspection openings and drainage cleaning provisions
- overflow relief provisions
- proprietary air admittance and relief systems
- proprietary velocity reduction fittings
- sewerage pumping stations (wet wells)
- piping systems
- venting systems.
Knowledge evidence
- common terminology and definitions used in design of complex sanitary plumbing and drainage systems for all classes of building
- National Construction Code (NCC)
- other relevant Australian standards, codes or standard operating procedures (SOPs)
- principles of technology in the design of hydraulic systems
- procedures for maintaining air balance within the systems
- workplace safety requirements, including relevant statutory regulations, codes and standards
- scope of work:
- interpretation of plans and specifications
- sizing and documenting layout of complex sanitary plumbing and drainage systems for applications, including residential, commercial and industrial
- design requirements:
- architectural plans
- building specifications
- fire rating of penetrations
- owner requirements
- pipework identification
- soil quality
- specialist waste applications
- unstable or water-charged ground
- cost–benefit analysis considerations
- Australian Standards, codes, statutory and regulatory requirements:
- NCC
- relevant Australian Standards and codes, including AS/NZS 3500 Plumbing and drainage set
- AS 2200 Design charts for water supply and sewerage
- local government and health department requirements
- state/territory government requirements
- preparation of documentation for authorities’ approval
- requirements from manufacturers:
- material specifications
- pump tables
- sizing tables
- recommended specific fixings for pipework
- technical and trade manuals
- information gathered through desktop study:
- architectural and building plans
- developer plans
- manufacturers’ data
- applications
- brochures
- forms
- policies
- other reports as available
- performance requirements, which must include flow, velocity, pressure and discharge requirements established using relevant Australian standards, codes and local authority plans
- layout of pipework systems based on principles of economy, serviceability, durability and fitness for use:
- drainage
- elevated pipework
- low pressure pump
- vacuum
- vented stack systems
- types of fittings and valves
- access chamber details:
- benching requirements
- flow
- gradient requirements
- inlet and outlet connections
- ladder access
- lids
- cost–benefit analysis considerations
- gullies covering details such as size, location, bedding and concrete support:
- boundary traps
- disconnector gullies (DG)
- floor waste (FW)
- overflow relief gullies (ORG)
- types of calculations for complex sanitary plumbing and drainage systems:
- determination of flow and fixture loadings
- gradient calculations
- interpretation of design charts and tables
- pipe sizing calculations
- reduced level calculations
- self-cleaning velocities
- design elements of anchor blocks:
- flow forces to be resisted
- keying and anchorage points
- sizes
- soil characteristics
- types of pipe support:
- anchors
- bedding
- bracket spacing
- concrete support
- corrosion protection
- cover
- hanging brackets
- manufacturer-recommended specific fixings
- material requirements
- provision for expansion
- saddles
- wall and ceiling brackets.
- pump well, pump and pump control requirements:
- access covers
- automatic controls
- capacity
- chains
- corrosion-resistant materials
- detailing
- emergency storage
- high- and low-level water controls and alarms
- impeller sizing
- inlet and outlet design requirements
- installation and mounting requirements
- ladder access
- macerator requirements
- odour control
- pump selection
- pump sizing
- pump well sizing
- space requirements
- step irons
- valve requirements
- ventilation
- warning system
- sanitary and plumbing drainage system materials:
- cast iron (Fe)
- concrete
- copper (CU)
- vitrified clay pipe (VCP)
- high density polyethylene (HDPE)
- unplasticised polyvinyl chloride (uPVC)
- other approved material
- fittings and fixtures
- measures to prevent the spread of fire
- sound attenuation requirements.
- jointing methods:
- brazing and threading
- electrofusion welding
- mechanical joints
- rubber ring
- solvent cement welding
- installation requirements:
- bedding
- clipping
- concrete support
- fire rating of penetrations
- installation details
- jointing requirements
- level of workmanship
- elements of rising main systems:
- approved pressure pipe and fittings
- calculated rise and pump delivery requirements
- pipe velocities
- pump sizing to meet calculated flow conditions
- ways to apply sustainability principles and concepts:
- selecting appropriate material to ensure minimal environmental impact
- efficient use of material
- efficient energy usage/capital outlay comparison
- effect on the environment due to overflow or leakage
- water efficiency
- consideration of the Green Building Council of Australia rating scheme
- local environment consideration regarding overflow, disposal and reuse
- types of plans (computer-generated or hand-drawn):
- axonometrics
- cross-sections
- details
- elevations
- isometrics
- schematics
- sections
- specification information:
- bedding
- commissioning
- concrete support and detailing specialised components
- jointing
- access chambers (manholes)
- manufacturer requirements
- materials
- pumps
- work health and safety (WHS)
- support
- testing
- workmanship
- testing:
- air pressure
- drainage inspection
- hydrostatic
- performance
- quality assurance (QA) audit
- commissioning inclusions:
- charging traps
- checking leaks
- checking for foreign material
- checking for system defects
- checking that system functions as per design
- checking trap water seal retention
- cleaning grates
- system certification
- operation and maintenance manual inclusions:
- construction drawings
- results of commissioning test
- certification documentation
- maintenance schedules
- manufacturer brochures and technical information
- manufacturer warranties.
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCPCM5010
What does an assessment tool for CPCPCM5010 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCPCM5010 needs to address all 224 unit components: 4 elements with 23 performance criteria, 10 performance evidence requirements, 191 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCPCM5010?
Auditori pulls the current release of CPCPCM5010 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCPCM5010 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCPCM5010 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCPCM5010, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCPCM2039 — Carry out interactive workplace communication
- CPCPCM2040 — Read plans, calculate quantities and mark out materials
- CPCPCM2041 — Work effectively in the plumbing services sector
- CPCPCM2043 — Carry out WHS requirements
- CPCPCM2045 — Handle and store plumbing materials
- CPCPCM2046 — Use plumbing hand and power tools
- CPCPCM2047 — Carry out levelling
- CPCPCM2048 — Cut and join sheet metal
- CPCPCM2049 — Cut using oxy-acetylene equipment
- CPCPCM2052 — Weld mild steel using oxy-acetylene equipment
- CPCPCM2053 — Weld using metal arc welding equipment
- CPCPCM2054 — Carry out simple concreting and rendering
Your CPCPCM5010 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCPCM5010 free