CPCCWF3002 — Install floor tiles
Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.
Every new account includes a free credit — no card, no subscription.
What an assessment for CPCCWF3002 must cover
48 assessable components: 7 elements (26 performance criteria), 6 performance evidence and 16 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.
Elements & performance criteria
1 Plan and prepare to install floor tiles.
- 1.1Read and interpret task work instructions and plan sequence of work.
- 1.2Select and use personal protective equipment (PPE) as required for each stage of the task.
- 1.3Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
- 1.4Inspect work site, assess hazards and apply risk controls, including required signage and barricades.
- 1.5Select tools and equipment, check for serviceability and report any faults.
- 1.6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
2 Set out floor tiling.
- 2.1Clear area to be tiled.
- 2.2Check that tiles are fit for purpose and conform to task size, patterns, colours and characteristics.
- 2.3Check waterproof membrane for integrity and conformance to regulatory requirements.
- 2.4Set out tile work to be symmetrical and balanced, including allowance for movement joints, and to produce minimal waste.
3 Cut floor tiles.
- 3.1Cut tiles without damage to tile edges, surfaces or finish.
- 3.2Cut holes for penetrations to shape, size and specified tolerance.
4 Prepare substrate and install floor tiles.
- 4.1Prepare and apply screed to specified consistency and surface finish.
- 4.2Prepare substrate surface, free from contaminants and residues to receive adhesive.
- 4.3Match adhesive with tile and substrate material and mix according to manufacturers’ instructions.
- 4.4Install tiles, maintaining alignment of joints that are uniform in size and with the specified finished surface.
- 4.5Insert movement joints.
5 Tile treads, risers, steps and thresholds.
- 5.1Determine step rises and goings from steps and and/or or stairs.
- 5.2Set out steps for uniform rise to comply with building code and make even cut on both sides of steps.
- 5.3Install tiles, maintaining alignment of joints that are uniform in size and with the specified finished surface.
6 Grout tiles.
- 6.1Clean and prepare joints to receive grout.
- 6.2Mix and apply grout.
- 6.3Clean and polish tiles.
- 6.4Protect tiles from damage during remaining construction.
7 Clean up.
- 7.1Clear work area and dispose of, reuse or recycle materials.
- 7.2Clean, check, maintain and store plant, tools and equipment in accordance with manufacturers’ recommendations.
Performance evidence
- four square metres of wet area floor laid with fall and waterproofing
- four square metres of floor with movement joints and large format tiles (greater than or equal to 600 millimetres x 300 millimetres) with rectified edges
- four square metres set out and laid on the diagonal with a half-tile border
- three steps at least 900 millimetres wide with minimum 115 millimetre risers, including treads
- cutting tiles around a circular floor grate
- All work must be performed to the standard required in the workplace and must comply with Commonwealth and state/territory laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications and workplace requirements.
Knowledge evidence
- compliance requirements of Australian Standards for installing floor tiles
- workplace quality policies and standards for installing floor tiles
- job safety analyses and/or safe work method statements in accordance with Safe Work Australia Code of Practice for Construction Work or state and/or territory equivalent
- personal protective equipment (PPE)
- environmental requirements for installing floor tiles
- placement and design of movement joints
- types and uses of materials storage and environmentally friendly waste management
- types and uses of tools and equipment for installing floor tiles
- processes for the calculation of material requirements for installing floor tiles
- installing tiles to floors and step and and/or or stairs
- matching floor joints between adjoining areas
- installing tiles over different substrates in common use, waterproofing membranes, acoustic underlays and de-coupling systems
- large format tiles
- natural and reconstituted stone tiles
- adhesive types and classifications
- grout types, including epoxy grout
Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.
See what you get before you start
Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:
Questions about assessing CPCCWF3002
What does an assessment tool for CPCCWF3002 need to cover?
To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCWF3002 needs to address all 48 unit components: 7 elements with 26 performance criteria, 6 performance evidence requirements, 16 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.
How does Auditori generate an assessment tool for CPCCWF3002?
Auditori pulls the current release of CPCCWF3002 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.
Is the first assessment tool really free?
Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCWF3002 — with no card and no subscription required. After that it's pay-as-you-go per unit.
Can I check my existing CPCCWF3002 assessment instead of generating a new one?
Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCWF3002, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.
Related units
- CPCCWF2001 — Handle wall and floor tiling materials
- CPCCWF2002 — Use wall and floor tiling tools and equipment
- CPCCWF3001 — Prepare surfaces for tiling application
- CPCCWF3003 — Install wall tiles
- CPCCWF3004 — Repair wall and floor tiling
- CPCCWF3005 — Install decorative tiling
- CPCCWF3006 — Install mosaic tiling
- CPCCWF3007 — Tile curved surfaces
- CPCCWF3008 — Tile pools and spas
- CPCCWF3009 — Apply waterproofing for wall and floor tiling
Your CPCCWF3002 assessment tool, in minutes.
First unit free. No card, no RTO registration, no subscription.
Generate CPCCWF3002 free