CPCCOM3006Carry out levelling operations

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for CPCCOM3006 must cover

68 assessable components: 4 elements (23 performance criteria), 10 performance evidence and 35 knowledge evidence requirements. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Plan and prepare.

  • 1.1Read and interpret work instructions and plan sequence of work.
  • 1.2Plan all work to comply with laws and regulations, Australian Standards, work health and safety (WHS) and environmental requirements, manufacturers’ specifications, workplace requirements, drawings and specifications.
  • 1.3Select tools and equipment, including personal protective equipment (PPE), check for serviceability and report any faults.
  • 1.4Fit PPE correctly.
  • 1.5Inspect work site, assess hazards and services, and apply risk controls, including required signage and barricades.
  • 1.6Select materials required for task, calculate quantities, handle safely and prepare and position ready for use.
  • 1.7Confirm team roles and verbal and non-verbal communication signals.

2 Carry out levelling procedures using rise and fall method.

  • 2.1Set up and test instrument for operational effectiveness and accuracy.
  • 2.2Set up or locate datum point.
  • 2.3Take and record readings from the datum and at nominated or selected stations following project specifications.
  • 2.4Identify backsights, intermediate sights and foresights, and book levels.
  • 2.5Transfer instrument to another location, repeat process, and record change station and record readings.
  • 2.6Calculate reduced levels for all stations using rise and fall method, and check accuracy of recordings using the three-check method.

3 Carry out levelling procedures using height of collimation method.

  • 3.1Set up and test instrument for operational effectiveness and accuracy, and check tolerances.
  • 3.2Set up or locate datum point.
  • 3.3Take and record readings to datum and establish the height of collimation.
  • 3.4Take readings at nominated or selected stations following project specifications, and record in field book.
  • 3.5Transfer instrument to another location, establish new height of collimation, and record change station in field book.
  • 3.6Calculate reduced levels using height of instrument method.
  • 3.7Calculate reduced levels for all stations and record heights and levels in field book.
  • 3.8Check accuracy of readings using height of collimation method of calculation and three check method.

4 Calculate distances using stadia lines.

  • 4.1Calculate distances from instrument to stations using staff, stadia lines, and identified factor of levelling instrument
  • 4.2Record readings and distances.

Performance evidence

  • identify site hazards
  • establish approximate distances and transfer of reduced levels
  • measure and record: ground levels at respective critical set-out points
  • measure and record: heights or levels for building components
  • measure and record: heights or levels of ceilings and floors
  • measure and record: slab or pad levels for placement of steel columns or masonry piers
  • determine shooting levels for: concrete slabs
  • determine shooting levels for: excavation or footings
  • transfer levels or heights for construction projects
  • calculate rise and fall and height from collimation

Knowledge evidence

  • compliance requirements of the Australian Standards relevant to carrying out levelling operations
  • workplace quality policies and standards relevant to carrying out levelling operations
  • safety requirements for carrying out levelling operations
  • basic construction and levelling processes
  • construction plans, symbols and construction terminology relevant to carrying out levelling operations
  • processes for interpreting engineering drawings and sketches for carrying out levelling operations
  • processes for setting out construction tasks for levelling operations
  • project quality requirements for carrying out levelling operations
  • site isolation and traffic control responsibilities and authorities
  • levelling techniques commonly used in construction work
  • levelling activities: establishing approximate distances and transfer of reduced levels
  • levelling activities: locating site hazards and services
  • levelling activities: measuring and recording ground levels at respective critical set-out points
  • levelling activities: measuring and recording heights or levels for installing building components
  • levelling activities: measuring and recording heights or levels of ceilings and floors
  • levelling activities: measuring and recording slab or pad levels for placement of steel columns or masonry piers
  • levelling activities: taking levels for concrete slabs
  • levelling activities: taking levels for excavation or footings
  • levelling activities: calculating rise and fall and height from collimation
  • types of tools and equipment used for carrying out levelling operations: spirit levels
  • types of tools and equipment used for carrying out levelling operations: straight edge
  • types of tools and equipment used for carrying out levelling operations: automatic/optical levelling devices
  • types of tools and equipment used for carrying out levelling operations: laser levels
  • types of tools and equipment used for carrying out levelling operations: water level
  • processes for checking operation and tolerances: two peg test for automatic level
  • processes for checking operation and tolerances: reverse readings for spirit level
  • types of level readings: negative readings
  • types of level readings: datum
  • types of level readings: backsight
  • types of level readings: foresight
  • types of level readings: intermediate sight
  • types of level readings: plumb
  • maintenance of levelling devices: authorised operator servicing and minor replacements
  • maintenance of levelling devices: cleaning
  • maintenance of levelling devices: monitoring, recording and reporting faults

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing CPCCOM3006

What does an assessment tool for CPCCOM3006 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for CPCCOM3006 needs to address all 68 unit components: 4 elements with 23 performance criteria, 10 performance evidence requirements, 35 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for CPCCOM3006?

Auditori pulls the current release of CPCCOM3006 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for CPCCOM3006 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing CPCCOM3006 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of CPCCOM3006, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your CPCCOM3006 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate CPCCOM3006 free