AHCIRG347Maintain pressurised irrigation systems

Generate a complete, audit-ready assessment tool for this unit in minutes: candidate assessment, assessor guide with model answers, and a coverage matrix mapped to every component below. Reviewed and approved by your qualified person, exported under your branding.

Every new account includes a free credit — no card, no subscription.

What an assessment for AHCIRG347 must cover

36 assessable components: 4 elements (19 performance criteria), 9 performance evidence and 3 knowledge evidence requirements, plus 5 foundation skills. An audit-defensible tool maps every question and task back to these — that mapping is the coverage matrix Auditori generates alongside the assessment.

Elements & performance criteria

1 Interpret a pressurised irrigation maintenance program

  • 1.1Determine the scope of maintenance
  • 1.2Determine the frequency of maintenance works
  • 1.3Establish irrigation maintenance standards
  • 1.4Plan and prepare maintenance works
  • 1.5Identify potential hazards and risks and implement safe working practices to manage risks
  • 1.6Minimise environmental impacts of irrigation maintenance activities
  • 1.7Select, fit and use personal protective equipment applicable to the task

2 Inspect an irrigation system

  • 2.1Create an inspection checklist and inspect the system regularly
  • 2.2Identify remedial action required and undertake repairs to restore system to full effectiveness
  • 2.3Undertake servicing of irrigation mechanical equipment according to operation and maintenance manual
  • 2.4Assess the results of maintenance works and record to ensure repairs or maintenance standards have been achieved

3 Carry out periodic system maintenance

  • 3.1Record damage and blockages with contaminants by damage type, location and the section of the system affected
  • 3.2Record and report damaged or faulty components and computer control systems and take action to effect repairs
  • 3.3Implement end of season maintenance procedures
  • 3.4Implement routine and preventative maintenance procedures

4 Complete and record maintenance activities

  • 4.1Restore site and clear materials and equipment from the site on completion of maintenance works
  • 4.2Complete maintenance and servicing records according to workplace recording procedures
  • 4.3Record parts removed or replaced
  • 4.4Record and report faults and breakages

Performance evidence

  • interpreted and applied maintenance procedures
  • applied workplace health and safety requirements
  • identified adverse environmental impacts of irrigation activities and taken appropriate remedial action
  • checked connections and controllers
  • checked sprinkler/emitter output and function
  • ensured proper operation of automatic flush valves
  • removed, serviced and replaced valves and filters
  • confirmed operational pressures
  • tested irrigation equipment

Knowledge evidence

  • workplace requirements applicable to health and safety in the workplace for maintaining pressurised irrigation systems
  • pressurised irrigation equipment operation and maintenance manual
  • characteristics, operation and common operation and maintenance problems of pressurised irrigation system components, including: pipes, joints, valves, emitters, and pumps

Foundation skills

  • Reading: Interpret textual information from a range of sources to identify relevant and key information about workplace operations
  • Writing: Use correct terminology to document irrigation service and maintenance activities
  • Oral communication: Use clear language to report irrigation service and maintenance activities
  • Numeracy skills: Identify and record part numbers
  • Navigate the world of work: Recognise and follow workplace requirements, including safety requirements, associated with own role and area of responsibility

Unit content sourced from training.gov.au — © Commonwealth of Australia, licensed under CC BY 4.0. Auditori is not affiliated with the Department of Employment and Workplace Relations.

See what you get before you start

Real, unedited Auditori output (RIIHAN201E shown), branded for a sample RTO:

Questions about assessing AHCIRG347

What does an assessment tool for AHCIRG347 need to cover?

To satisfy the Principles of Assessment and Rules of Evidence, an assessment for AHCIRG347 needs to address all 36 unit components: 4 elements with 19 performance criteria, 9 performance evidence requirements, 3 knowledge evidence requirements, and the foundation skills. A coverage matrix mapping each question and task to these components is what an auditor looks for.

How does Auditori generate an assessment tool for AHCIRG347?

Auditori pulls the current release of AHCIRG347 from training.gov.au and generates a complete package: candidate assessment, assessor guide with model answers and observation criteria, and a coverage matrix mapping every component. A suitably qualified person then reviews and approves the draft in a built-in workflow — consistent with ASQA's guidance on AI use in VET — before export as branded PDF and editable Word.

Is the first assessment tool really free?

Yes. Every new account includes one free credit — enough to generate the complete assessment tool for AHCIRG347 — with no card and no subscription required. After that it's pay-as-you-go per unit.

Can I check my existing AHCIRG347 assessment instead of generating a new one?

Yes — upload your existing assessment or learner guide and Auditori maps it against every element, performance criterion, PE and KE of AHCIRG347, showing exactly what's covered and what's missing. Mapping costs a quarter of a credit.

Related units

Your AHCIRG347 assessment tool, in minutes.

First unit free. No card, no RTO registration, no subscription.

Generate AHCIRG347 free